W6

UiTM Cawangan Johor Kampus Pasir Gudang

TAKING-OFF QUANTITIES
FOR BUILDING & CIVIL
FACULTY OF CIVIL ENGINEERING
ENGINEERING
UITMCJKPG WORKS
3.1.1 Building works:
Concrete, reinforcement
and formworks for:
- Foundation
- Stump/ Column
- Beam
- Slab
COURSE & PROGRAMME
OUTCOMES
CO1:
Evaluate bill of quantities for major elements of building and civil
engineering works in accordance with Malaysian Civil
Engineering Standard Methods of Measurement (myCESMM) 

PO2:
Identify and analyse well-defined engineering problems reaching
substantiated conclusions using codified methods of analysis
specific to their field of activity
W6

LESSON OUTCOMES
 At the end of the lesson, students should be able to:

1) Prepare taking off sheet for concrete works, formwork &


reinforcement bar (beam/slab/foundation/stump/column)
2) Prepare bill of quantities for concrete works, formwork &
reinforcement bar (beam/slab/foundation/stump/column)
W5

THE OBJECTIVES OF BILL OF


QUANTITIES
W5
 Bill of Quantities is built up in three stages:

1 STAGE : TAKING OFF


ST

2 ND
STAGE : ABSTRACTING

3RD STAGE : WRITING A BILL OF QUANTITIES


W5

1 STAGE : TAKING OFF


ST
1 STAGE : TAKING OFF
W5
ST

SHEET
W5

2 ND
STAGE : ABSTRACTING
W5

3RD STAGE : WRITING A BILL OF QUANTITIES


3RD STAGE : WRITING A BILL OF QUANTITIES
W5
W5

REINFORCEMENT
 Concrete is strong in compression, but week in tension.
Therefore reinforcements are used to strengthen the concrete in tension.
 The components of this category are:

i) Mild steel bars


ii) High tensile bars
iii) Reinforcing bars of other stated materials
iv) Special joints
v) High Tensile steel fabric
vi) Fabric of other stated materials
REINFORCEMENT WORKS W5
REINFORCEMENT : DETAILINGS
TABLE 4.2 – ANCHORAGE (HOOKS) AND BENDING OF REINFORCEMENT W5
CONCRETE
 Concrete is the most important material in construction because the materials easily obtained
compare to other materials.
 The concrete is a construction material that composed of cement, aggregates, water and some
chemical admixtures.
 The work in concrete work comprises the following :

a) In situ concrete designed mix


b) In situ concrete prescribed mix
c) Precast concrete
d) Concrete ancillaries
e) Ancillary work for water retaining structure
 The items for concrete include supply, placing in forms or shuttering
vibrating and curing.
 Shuttering is measured by the area of concrete, which requires support
during setting.
 The items for shuttering include supply and erection, including all
necessary struts and bearer, treatment before concreting and removal
when the concrete has set.
 The items for reinforcement includes supply, bending to the shapes
shown on the bending schedules and fixing the reinforcement in the
works.
 Usually it is not possible to give the precise quantities of reinforcement
in the bill of quantities, as the detailed drawings are not available when
the bill is prepared and the quantities must be estimated
FORMWORK
 Formwork is the mold for concrete, and its normally made of wood or steel.
 Formwork shall be measured for surfaces of in situ concrete which require temporary
support during casting, except where otherwise state.
 Formwork is to be measured based on whether it is for sides, soffit or sloping formwork.
 activities involve in the formwork operations are: -
1) fabricating
2) erecting
3) stripping
4) moving
5) cleaning
6) oiling
 At the time of take-off, the design of the forms does not have to be concerned since only
the area of formwork is measured, thus, the formwork shall be measured in square metre
of contact area
TAKING OFF :
FOUNDATION
-PAD FOOTING
-STUMP
FOUNDATION :
METHOD STATEMENT
TAKING OFF
FOUNDATION : PAD
FOOTING & STUMP
Example 2: Column And Foundation (Footing)
TAKING OFF SHEET : Column And Foundation (Footing)
2nos COLUMN AND FOUNDATION (FOOTING)
  of pad    
footing size CONCRETE WORK
2000x2000x400       Concrete grade 1:3:6
2/ 2.00   - 20 mm aggregate for footings
  2.00    
  0.40 3.20   400
4nos of pad        
2000
footing size 2000
1500x1500x400
400
4/ 1.50    
  1.50     1500
1500
  0.40 3.60 6.80 m3 CONCRETE GRADE 1:3:6 FOR FOOTINGS
       
200       Concrete grade 1:2:4
200       - 20 mm aggregate for stumps
1200        
4/ 0.20   Length=1.850
Less(-) Ground beam
  0.20   0.250
  1.20 0.19 1.600
      Less(-)Footing
0.400
2/ 0.25   1.200
  0.25    
  1.20 0.15 0.34 m CONCRETE GRADE 1:2:4 FOR STUMP
3
4nos
  of     FORMWORK
pad
     
4 sides  
footing
      Rough surface
4/4/ 1.50   formwork for footings
  0.40 9.60 0.4m   0.4m
        2.0m
2/4/ 2.00   1.5m  
2.0m
  0.40 6.40 16.00 m2
       
      Rough surface
  formwork for side of stump

4/4/ 1.20 0.2m


0.25m
  0.20 3.84  
       
2/4/ 1.20   1.2m   1.2m
  0.25 2.40 6.24 m2
     

 
      REINFORCEMENT
      Reinforcement For Footing
       
      Reinforcement for Footing 2000x2000x400
     

      Length of one steel bar


      Length=2.000
Less (-) 2 cover
      0.060
      1.940
2 nos 
of     Add (+) 2 bends
footings 2/5.5d @ 2/5.5/0.016 =
0.176
  Both  ways   2.116  2.12
       
2/2/ 7/ 2.12 59.36 59.36 m of Y16 ø steel bar
       
      Reinforcement for Footing 1500x1500x400

   7Y16  
      Length of one bar
      Length= 1.500
Less(-) 2 cover
      2/0.03
=0.060
      1.440
      Add (+) 2 bends
2/5.5d @ 2/5.5/0.016
=0.176
      1.616  1.62
       
      Reinforcement For Stump
       
      Reinforcement for stump 250x250 of footing 2000x2000x400
  Beam
  300mm
  Length of one reinforcement bar
      1.850
      Add (+) existing grd. level to grd beam
0.050
      1.900
     

     
      Less (-) cover
0.030
      4Y16 1.870
     
Less (-) 2 footing rebar (both ways)
2/16
2 nos of =0.032
stump       1.838(i)
      Add bend 5.5d
5.5/0.016
4nos of bar =0.088
  for stump
    1.926
      Add (+) lap 40d
40/0.016
=0.640
      2.566 
2.57
       
2/4/ 2.57 20.56 20.56m of Y16 ø steel bar
      Mild steel link for stump 250x250
       
      Length of one link R6- 200
      Length
=0.250
      Less(-) 2cover
2/0.025 250
=0.050
      0.200
      250
4/0.200 =
0.800
      Add(+) hook 24d
24/ 0.006
=0.144
      0.944
       
      Distance that require link
      (Length of steel bar from (i)) =1.838
      Less (-) Ground beam
0.300
      1.538
      No. of links
1.538/0.200 +1
=8.68
      Reinforcement for stump 200x200
       
      Length of one bar
      Length = 1.850
      Less(-) grd level to grd beam
0.250
      1.600
      Add (+) depth of grd beam
0.300
      1.900
      Less(-) cover
0.030
      1.870
      Less(-) 2 footing rebar (both way)
2/0.016 =0.032
      1.838 (i)
      Add (+) bend 5.5d (4Y12)
5.5/0.012 = 0.066
      1.904
      Add (+) Lap 40d
40/0.012 = 0.480
      2.384  2.38
       
4/4/ 2.38 38.14 38.14m of Y12 ø steel bar
       
      Mild steel link for stump 200x200
       
      Length of one link
      0.200
      0.050 - cover 2/0.025
      0.150
      4/0.150 = 0.600
      0.144 + hook 24d
      0.744  0.74
       
      Distance that require link
      1.838 (Length of steel bar from (i))
      0.300 - Ground beam
      1.538
       
      No. of links = 1.538/0.250 +1
      = 7.152, say 8
       
4/8/ 0.74 23.81 MR of M6 ø link
       
       
BILL OF QUANTITIES : Column And Foundation (Footing)
Item
Description Quantity Unit Rate RM
No.
           
  EXCAVATION WORK        
1 Excavation of top soil, 150 mm 17.00 cu. m    
2 Excavation of trench depth not exceeding 1.5 m 25.50 cu. m    
3 Excavation of trench depth exceeding 1.5 m but not    
exceeding 3.0 m 4.25 cu. m
           
  CONCRETE WORK        
4 Concrete grade 1:3:6 - 20 mm aggregate for footings 6.80 cu. m    
5 Concrete grade 1:2:4 - 20 mm aggregate for stumps 0.34 cu. m    
           
  FORMWORK        
6 Rough surface formwork for footings 16.00 Sq. m    
7 Rough surface formwork for side of stump 6.24 Sq. m    
         
  REINFORCEMENT        
8 Y16, 59.36+64.80+20.56=144.72m,    
(3.14x0.0082x144.72x7850) 228.30 Kg.
9 Y12, 38.14m,    
(3.14x0.006 x38.14x7850)
2 33.84 Kg.
10 R 6, 17.00+23.81= 40.81m, (3.14x0.0032x40.81x7850) 9.05 Kg.    
  (Density of steel bar, assume = 7850kg/m3)        
Total Bill RM  