KHAN KHWAR HYDEL POWER STATION, WAPDA,

BESHAM
72 MW
LOCATION MAP OF KHAN KHWAR POWER STATION

72MW KKPS WAPDA Besham is located at city Besham, District Shangla of


KPK and at a distance of about 267KM from Islamabad.
SATELLITE VIEW OF KKPS
SATELLITE VIEW OF KKPS WEIR SITE
SALIENT FEATURES

• Project COD: October 2010


• Project Cost: Rs. 10733 Million
• Consultant: M/s Lahmeyer International, Germany in joint venture with Local Consultants
•Contractor:
> Civil & Hydraulic Structure: M/s Sinohydro Corporation China
> Electrical & Mechanical Work: M/s Dongfang Electric Corporation China
• Dam Structure:
> Type: Concrete Gravity Dam
> Height above Riverbed: 30m
• Reservoir:
> Total Storage Capacity: 1.05 Mm3
> Active Storage Capacity: 0.40 Mm3
> Length of Reservoir: 1.60 km
• Installed Capacity: 72 MW
• Turbine Type: 02xFrancis & 01xPelton Wheel
• Generator: Vertical Shaft 02 x 34 MW & Horizontal Shaft 01 x 04MW
• Total Annual Generation (PC-I) : 306 GWH
PICTORIAL VIEW OF KKPS

Upstream View of the Dam Body & Reservoir Headrace Tunnel

Powerhouse 132 KV Switch Yard


ISSUE
• Disparity in Hard Area Zone:
> 3-HHPs Besham : Zone-C
> Mohmand Dam : Zone-A

• Authority vide its Finance Division office order dated 20/08/2019 has
categorised its Projects into various Zones based on their locality in Hard
area and consequently has put 3-HHPs Besham into Zone-C whereas
Mohmand Dam in Zone-A.
ALLAI KHWAR HYDEL POWER STATION, WAPDA,
ALLAI, BHATTAGARAM
121 MW
LOCATION MAP OF ALLAI KHWAR POWER STATION

121 MW AKPS WAPDA Allai is located on a left bank tributary of River Indus in
District Battagram of Khyber Pakhtun Khwa Province and at a distance of 262 km from
Islamabad on famous Silk Route Karakuram Highway (KKH).
SATELLITE VIEW OF AKPS
SATELLITE VIEW OF AKPS WEIR SITE
SALIENT FEATURES

• Project COD: March, 2013


• Project Cost: Rs. 17234.3 Million
• Consultant: M/s High-Head Hydropower Consultants (HHC)
•Contractor:
> Civil & Hydraulic Structure: M/s Dongfang Electric Corporation China
> Electrical & Mechanical Work: M/s Andritz Hydro GmbH Austria
• Dam Structure:
> Type: Concrete Gravity Dam
> Height above River bed: 32.5 m
• Reservoir:
> Total Storage Capacity: 915 AF
> Length of Reservoir: 1.30 km
• Installed Capacity: 121 MW
• Turbine Type: 02Nos. x Pelton Wheel
• Generator: Vertical Shaft 02x60.5 MW
• Total Annual Generation (PC-I) : 463 GWH
PICTORIAL VIEW OF AKPS

Upstream View of the Dam Body & Reservoir Headrace Tunnel

Powerhouse 132/220 KV Allai Switch Yard


ISSUE
• Disparity in Hard Area Zone:
> 3-HHPs Besham : Zone-C
> Mohmand Dam : Zone-A

• Authority vide its Finance Division office order dated 20/08/2019 has
categorised its Projects into various Zones based on their locality in Hard
area and consequently has put 3-HHPs Besham into Zone-C whereas
Mohmand Dam in Zone-A.
WAY FORWARD

• All stated and described justifications desperately demand to turn Hard


area status of 3-HHPs Besham from Zone-C to Zone-A in order to
satisfy the utterance and reasonable right of employee serving under 3-
HHPs Besham.
DUBER KHWAR HYDEL POWER STATION, WAPDA,
PATTAN, LOWER KOHISTAN
130 MW
LOCATION MAP OF 130 DUBER KHAWAR POWER STATION
(300 km North of Islamabad)
SATELLITE VIEW OF 130MW DUBER KHWAR POWER
STATION
SATELLITE VIEW OF 130MW DUBER KHWAR WEIR SITE
SALIENT FEATURES
Project Commercial operation date: March, 2014
Consultant: High Head Hydropwer Consultants
Contractor: M/s Andritz Hydro
Reservoir: 0.536 M m3
Installed Capacity 2x 65MW= 130MW
Turbine Type Pelton Wheels
Total Annual Generation (PC-I) 595 GWh
Achieved Annual Generation (FY-20212022) 619 GWh
PICTORIAL VIEW

Upstream View of the Dam Body & Reservoir Spillways

Powerhouse 132 KV Switch Yard


ISSUES
Disparity in Hard Area Zone 3-HHP Besham is put in Zone-C as compare to
Mohmand Dam in Zone-A
Shortage of Staff Acute Shortage of Staff
Sanctioned Strength=131
Working strength =67
Officer Hostel Non Availability of Officer Hostel and Officer are
pressed to live in 20 Years Old inadequate
Prefabricated structure with no sanitation situation.
Masjid Non Availability of Masjid for Personal working in HPP-
Duber
Clean Drinking Water Non availability of filtration Plant and Personal bound
to drink water from seepage
Medical Dispensary Non Availability of dispensary

Training No Training of SCADA and any other for the technical


personal working on sensitive system.
WAY FORWARD

• All stated and described justifications desperately demand to turn Hard


area status of 3-HHPs Besham from Zone-C to Zone-A in order to
satisfy the utterance and reasonable right of employee serving under 3-
HHPs Besham.
HIERARCHY OF O/O CHIEF ENGINEER THREE HIGH HEAD
POWER STATIONS

C.E (O&M), 3-HHPs,


WAPDA, Besham
Mr. Tehsinullah

R.E (O&M),
R.E (O&M) KKHPs, R.E (O&M) AKHPs,
DKHPs, WAPDA,
WAPDA, Besham WAPDA, Allai
Pattan
Mr.Ijaz Ahmad Mr. Rahimoon Mr. Kamran Anwar
CIVIL WORKS PROGRESS-3 HHPs

1. Construction of 20 X Rooms bachelor Hostel at Allai Khwar


H.P.S Wapda, Allai: 85% Completed
2. Construction of 12 Km Linked road from Karakorum Highway
to Duber Khwar Weir Site: 30% Completed
PROGRESS - ABDUL HAYEE
Sr. No. Months Info Occurrence Low Down Ground Remarks
Reports Report Checks

01 JAN
02 FEB
03 MAR
04 APR
05 MAY
06 JUN
07 JUL
08 AUG
09 SEP
10 OCT
11 NOV
12 DEC
PROGRESS - ABDUL HAYEE
Sr. No. Months Info Occurrence Low Down Ground Remarks
Reports Report Checks

01 JAN
02 FEB
03 MAR
04 APR
05 MAY
06 JUN
07 JUL
08 AUG
09 SEP
10 OCT
11 NOV
12 DEC
PROGRESS - ABDUL HAYEE
Sr. No. Months Info Occurrence Low Down Ground Remarks
Reports Report Checks

01 JAN
02 FEB
03 MAR
04 APR
05 MAY
06 JUN
07 JUL
08 AUG
09 SEP
10 OCT
11 NOV
12 DEC
PROGRESS - ABDUL HAYEE
Sr. No. Months Info Occurrence Low Down Ground Remarks
Reports Report Checks

01 JAN
02 FEB
03 MAR
04 APR
05 MAY
06 JUN
07 JUL
08 AUG
09 SEP
10 OCT
11 NOV
12 DEC
PROGRESS - ABDUL HAYEE
Sr. No. Months Info Occurrence Low Down Ground Remarks
Reports Report Checks

01 JAN
02 FEB
03 MAR
04 APR
05 MAY
06 JUN
07 JUL
08 AUG
09 SEP
10 OCT
11 NOV
12 DEC
PROGRESS - ABDUL HAYEE
Sr. No. Months Info Occurrence Low Down Ground Remarks
Reports Report Checks

01 JAN
02 FEB
03 MAR
04 APR
05 MAY
06 JUN
07 JUL
08 AUG
09 SEP
10 OCT
11 NOV
12 DEC
STATE OF LOW DOWN-3HHPs

SR. No. Desig. Sanction Working Updated Balance Remarks


Strength Strength L/D L/D
01 G.M

02 C.E

03 Dir

04 Dy. Dir.

05 Asst.
Dir./J.E
Total