IDB CREATION

Please note this presentation is for stand alone DUG


configuration(no master – slave configuration) . There
is no TF compensation and related parameters.
Procedure
Open OMT and go to Configuration option on the top and select create IDB.
Delete all existing IDB configuration by selecting delete option.
All existing configurations deleted.
In cabinet setup, Select ‘New’ and give the cabinet 6601 and power details -
48VDC as default.
Ok and continue
Antenna sector setup -> New ->Number of sectors (as per planning)
Three sectors selected for this demo
Select Frequency(RRUS Freq) as GSM900(BO/B8) or
GSM1800(B3) for sectors as per plan. after this select RE Setup.
Select RE setup from the bottom of the new window
Make sure selecting RRUS 12 for all sectors. Currently we are
using only RRUS12 for 2G(1800,B3 and 900,B8) in the network.
Select Radio mode correctly as per plan. If U900 or LTE is there
then select ‘Mixed’ else select ‘single’
Select number of TRX ‘s as per configuration plan and distribute
under A and B .ie. If TRX configuration is 3 then select A-2 TRX and
B-1 TRX.If TRX is 4 then A-2 and B-2.
Ok and continue
Its 4+3+2 configuration in this demo.
OK and continue
Select STN equipment as ‘SIU’
Check ‘Run RBS configuration wizard’ box
Define RU position : shelf A1 and slot 1
Ok and continue
Logical name : Give site name and sector
As per the defined TRX numbers ,MCTR configuration will be created automatically. no
need to change it.
Give OK and continue.
Give OK to CPRI parameters
Cancel HW Info and go ahead
Define Loss for FEED as 0 and give ok one by one
Define Delay as zero one by one
Give OK without any change
Continue
TIE Value keep it same 62 and press OK
Cancel Alarm inlets.
No need TF compensation for this configuration. Cancel it
You can install IDB or ‘NO’ for save IDB to desired location in laptop
Save IDB to desired location . In OMT select Configuration->
Open IDB and connect OMT to RBS. make node in to
maintenance mode and install new IDB.
Prepared By: RAN BO Team