FIRE WALL

FIRE WALL

INDEX 01 OBSERVATIONS AND ISSUE

02 DECISIONS AND ACTIONS TAKEN

03 PREVIOUS QUOTATION

04 SPECIALIST COMMENTS

05 QUOTATION UPDATE
01 OBSERVATIONS AND ISSUE

THE TURBINE-GENERATOR GROUP AND THE FIRE PROTECTION SYSTEM ARE


IN THE SAME ENVIRONMENT, WHICH MEANS THAT THEY SHARE THE SAME
RISK. IF EITHER SYSTEM HAS A FIRE EMERGENCY, IT WILL SPREAD TO THE
SECOND AND BOTH SYSTEMS WILL BE LOST. A FIRE PROTECTION SYSTEM
MUST ALWAYS BE ISOLATED FROM OTHER RISKS. WE RECOMMEND AN
ENGINEERING STUDY TO DETERMINE THE FEASIBILITY OF SEPARATING
BOTH SYSTEMS BY A FIRE WALL, OR MOVING THE FIRE PROTECTION
SYSTEM TO A DIFFERENT LOCATION.

THE FIRE PUMPING SYSTEM IN THE MAIN POWERHOUSE IS NOT 100% ISOLATED FROM
THE REST OF THE MECHANICAL FLOOR, THEREFORE, IN THE EVENT OF A FAILURE OR
FIRE EMERGENCY AT THE LEVEL OF THE FIRE PROTECTION SYSTEM, IT WILL SHARE
THE RISK WITH EQUIPMENT INSTALLED ON SITE. WE RECOMMEND INSULATING THE
ENCLOSURE FROM THE FIRE PUMP ROOM IN ORDER TO MAKE IT INDEPENDENT FROM
02 DECISIONS AND ACTIONS TAKEN

POWER HOUSE

WALL THICKNESS:
130 mm
WALL HEIGHT:
2250 mm

WALL THICKNESS:
130 mm
WALL HEIGHT:
2550 mm
02 DECISIONS AND ACTIONS TAKEN

PCH

WALL THICKNESS:
130 mm
WALL HEIGHT:
2400 mm

WALL THICKNESS:
130 mm
WALL HEIGHT:
3470 mm
03 PREVIOUS QUOTATION

REQUIREMENTS
TOTAL COST
USD 29 092, 11
(IGV NOT INCLUDED)
04 SPECIALIST COMMENTS
04 SPECIALIST COMMENTS
05 QUOTATION UPDATE (SYNIXTOR)

POWER HOUSE FIREWALL


05 QUOTATION UPDATE (SYNIXTOR)

PCH FIREWALL
05 QUOTATION UPDATE (SYNIXTOR)

TRAINING AND SUPERVISION


05 QUOTATION UPDATE (SYNIXTOR)

POWER HOUSE FIREWALL: USD 11709,85


PCH FIREWALL: USD 16561,14
TRAINING AND SUPERVISION: USD 3821,22

TOTAL COST: USD 32092.21

(IGV NOT INCLUDED)