Akshaya Patra - Group 10
Akshaya Patra - Group 10
• The mid-day meal program was first started in 5 schools of Bengaluru in June 2000 catering
to 1500 children
• Indian Govt. made mid-day meal scheme mandatory on Nov. 28, 2001
• Centralized and Decentralized Kitchen with 50,000 to 1,50,000 meal making capacities
Prepare a process chart of the production process of rice from procurement to dispatch.
Procurement of market rice
Rice Store
mills
Chute
Cooking
Cauldron Dispatch
Boil Buffer Cooking Packing
Filled with Heated Chute
mixture state mixture Trolley section
water Container sanitized
by steam
= 3 mins = 5 mins = 10 mins = 18 mins
@ 98 deg C
Referring to the cycle time of cooking of rice, it is 40 minutes for 1 cauldron (i.e. 36 minutes for actual cooking and 2 minutes
for cleaning the cauldron and 2 minutes for setting up consecutive cauldron).
Referring to the cycle time of cooking sambar, it is 148 minutes for 1 cauldron (i.e. 135 minutes for actual cooking and time
required for quality check is 8 minutes, cleaning takes 2 minutes and setting up consecutive cauldron takes 2 minutes)
Total Operating Time = 6 hours or 360 minutes Total Operating Time = 5.5 hours or 330 minutes
Total No. of Batches Produced in One Day = approx. 8 Total No. of Batches Produced in One Day = approx. 2
Total Containers = 65*12 = 780 containers Total Containers = 2*8*61 = 976 Containers
Given conditions:
Types of method used
Refined oil: On-hand = 800 kg, Scheduled Receipt of 400 kg on day 3, Safety Stock = 100 kg Lot-for-Lot order quantity method
Tomato: On-hand = 700 kg, Scheduled receipt of 840 kg on day 2 Economic order quantity method
Toor Dhal: On-hand 15 tons, Reviewed on days 5, 15, and 25, Safety stock = 7,000 kg. Fix period order quantity method