Original Concept of Water Supply System based on 2.0 Bar Water Pressure
KHTP Medical Device Factory

Minimum 0.75 bar as per SPAN


requirement Top Water Level
Fence

Water Receiving Tank


250m³ x 4 nos To Factory
Flow Meter Assembly

6m
M Ground Level

150mm (6’’) Pipe


Approx. 550m

i. Water supply pressure at flow meter assembly ≥ 2 bar


ii. Pressure loss in horizontal part by pipe ≥ 0.6 bar
iii. Pressure loss at vertical part by pipe ≥ 0.6 bar
iv. Pressure at top water level ≥ 2 bar - (0.6 bar + 0.6 bar) = 0.8 bar
Page 2
Water Supply System based on 1.0 Bar Water Pressure
KHTP Medical Device Factory

Without Intermediate Tank

Minimum 0.75 bar as per SPAN


requirement Top Water Level
Fence

Water Receiving Tank


250m³ x 4 nos To Factory
Flow Meter Assembly

6m
M Ground Level

150mm (6’’) Pipe


Approx. 550m

i. Water supply pressure at flow meter assembly ≥ 1 bar


ii. Pressure loss in horizontal part by pipe ≥ 0.6 bar
iii. Pressure loss at vertical part by pipe ≥ 0.6 bar
iv. Pressure at top water level ≥ 1 bar - (0.6 bar + 0.6 bar) = -0.2 bar ≤ 0.75 bar is not acceptable
Page 3
Water Supply System based on 1.0 Bar Water Pressure
KHTP Medical Device Factory

With Intermediate Tank

Minimum 0.75 bar as per SPAN


requirement Top Water Level
Fence

Water Receiving Tank


250m³ x 4 nos To Factory
Flow Meter Assembly

6m
M Ground Level

Intermediate Tank/Pump

Cost Impact: Approx. RM 1.3 Millions

7m x 7m x 2.5m (H) Intermediate


R.C. Tank Reservoir
As additional facility
Page 4
Case Study – Required Pressure for Several Cases of Intermediate Tank
KHTP Medical Device Factory