Ashutosh 2nd
Ashutosh 2nd
Ashutosh 2nd
Presented by Mentored by
• Bop
• Bop Control Unit
• Function Test
• Pressure Test
• Responsibility Of
Shift Inchrage
Blowout preventer equipment
Blowout prevention equipment are composed of all systems required to operate the blowout preventers
under varying rig and well conditions. These systems are BOPs, BOP control unit, choke manifold, kill
manifold etc.
Primary
functions
Annular preventer
TY
PE
S
Ram preventer
Annular BOP
joints
RAM BOP
Types
• Pipe ram
• Blind ram
• Shear ram
• Variable bore ram
BOP Stack
Riser
(04 nos)
a) Function Test:-
• To check the closing time of each BOP which is to be within prescribed limit.
• To check the condition of the accumulators whether having pre-charge pressure.
b) Pressure Test:-
• To check the integrity of the entire joint in BOP stack, seals and valves.
• A cup tester or a plug tester is used.
Function test :-
accumulator pressure - 3000 psi •Blind Ram / Pipe Ram < 30 sec
• Close blind Ram and do the same (without pipe in the hole). •Below 18-3/4 bore < 30 sec
• Close pipe Ram and note down the time and the final pressure. •For 18-3/4 bore < 45 sec
• Close annular BOP and note down the time and the final pressure. and above
2 pressure tests –
i) Low pressure test
ii) High pressure test