Quality Management System in MAHA-METRO - Data Required - Reach 3
Quality Management System in MAHA-METRO - Data Required - Reach 3
.
1
Abstract of Concrete Quantity Executed ending October 2021.
Grade Of Concrete
TOTAL
Name of M35
Sr. No. Component
Contractors Qty.
Open (Cum)
M15 M25 M35 Pile M40 M45 M50 M55 M60 M70
Foundati
on
AF-SP(JV)
1 Stations Reach 3 378 0 72.25 97 3382.45 0 2607.95 0 0 0
6537.6
Stations 5
GRAND TOTAL
2
Concrete Test Data – Compressive Strength, Std Dev & Concrete Permeability
October 2021 end
Sl. Contractor Concrete Quantity No of Avg. Reqt. Std. CV Concrete Used in (Structure
No Grade Execute Cubes Strength N/mm2. Dev. permeability Components)
d Tested (N/mm2) (min) (25mm-max)
(cum)
3
FAT Summary – System Contractors
October 2021 end
4
Quality Activities/Initiatives
October 2021 end
5
Contribution / Improvements by the Quality Team (Civil)
October 2021 end
4
5
6
7
8
7
Toolbox; Quality Circle & Quality Cluster (Intra Civil Contractors)
Cumulative data up to October 2021
Sr. No. Reach Total no. of Total no. of Total no. of Total no. of Total no. of Total no. of
trainings trainees trainings trainees trainings trainees
NMRP
AF-SP(JV)
Reach 3
1 390 3880 95 756 05 24
Stations
8
Toolbox Trainings (Systems Contractors)
Cumulative data up to October 2021
Toolbox
Sr. No. Contractors
Total no. of trainings Total no. of trainees
PMRP
AF-SP(JV) Reach 3 Stations
1
TOTAL
9
Test Data for
Concrete
&
Other Major Materials
10
Summary of Concrete Cube Compressive Strength Tests ending october 21)
Qty Tests in 3rd
Sl. No of Test No of Test No of Tests Inhouse
Contractor Executed in party Remarks
No Required Done Failed Test
Cum laboratory
Cube Compressive Strength Test Samples (Frequency of Tests as per IS 456/ITP)
AF-SP(JV) Reach
6537.65
1 3 Stations 1192 1192 0 139 1048
Cum
6537.65
TOTAL 1192 1192 0 139 1048
Cum
11
Quality Submittal (Systems Contractors)
October 2021 end
ITP -
1.GC/PMRP/PR3/STN/AFS/2020/
13483
2.GC/PMRP/PR3/STN/AFS/
2020/17677
3.GC/PMRP/PR3/STN/AFS/
AF-SP(JV) Reach 2019/7856
ITP – 3/4
1 3 Stations 4.SPCPL/PUNEMETRO/20-
QAP – 1/1 21/3583 (Awaited)
QAP -
GC/PMRP/PR3/STN/AFS/2019/74
73
12
Summary of Testing Details of Steel Reinforcement ending Oct-2021)
Qty.
Sl. No of Test No of Test
Contractor Procured Frequency of Test Remarks
No Required Done
(MT)
AF-SP(JV) Reach Every 50 MT/Every 200 MT/ 1. All tests carried
1 2762.392 MT 55/13/276 119/23/282
3 Stations Every 10 MT out at 3rd party
Laboratory.
3. Tests Failed =0
13
Summary of Testing Details of HT Strands / wires
up to October 2021 end
Tests in 3rd
Qty Executed Frequency of No of Test No of Test
Sl. No Contractor party Remarks
in MT Test Required Done
laboratory
3. 1000 Hrs
Total Relaxation test
45.770 MT 7/7/2 11/11/2 11/11/2
done for each
Contract & for each
Brand.
14
Summary of test details for bearings
up to October 2021 end
Sl. No. No of Bearing No of Tests
Contractor Bearing types No of Test Done
Received at Site Required
Bearings (All tests carried out at Manufacturer’s Premises and cleared for dispatch to site after satisfactory results)
15
Data for Rejection of
Concrete
&
Other Materials
16
Concrete Rejection Details (Up to October 2021 end)
17
Details of Concrete Segments Rejections (Up to October 2021 end)
Total Nos
Rejected segments are marked by X in Red and kept aside in Casting yards.
18
Details of Material Rejections (Up to October 2021 end)
19
Details of GGBS Used in Concrete up to October – 2021 end
Cement Total Qty. of
Concrete Concrete Qty. GGBS
Reach Contractor Content % GGBS used GGBS used
Grade (Cum) per cum (kgs)
(kg/ Cum) (MT)
AF-SP(JV) M35 Pile 97.00 (314 Kg & 71% ) (126 Kg & 29 %) 126 Kg
Reach 3 12.22 MT
Reach 3 Station
TOTAL 12.22 MT
20
Use of PP Fibrillated Fibers in Concrete
Cumulative up to October 2021.
NMRP
TOTAL
PP Fibrillated Fibers used are BAJAJ FIBRE GUARD from M/S BAJAJ Reinforcements LLP, Nagpur
21
Assessment of CURING COMPOUND
22
Water curing Vs Curing Compound - Concrete Cube Strength Comparison
GRADE : ---
SAMPLE GRAPH
23
THE END