Project SixSigma VG 8-19-2019
Project SixSigma VG 8-19-2019
Victor Garcia
1-1
Define Phase
Project Goal
• Increase 40% Efficiency in selective
soldering machine Novo-102 ECU
Module
1-2
Six Sigma Team Members
Champion: Carlos Marin General Manager
1-3
Six Sigma Project Tracking
D
Project Y is: Reduce PPM by needle hit wire ( 13-181)
M
Project Y Business Impact Stakeholder
Project Charter
A
Selected Link Requirements
I
Define C
7/15/19 7/15/19 7/15/19 7/15/19
Kickoff Preliminary
Meeting
Process Map C & E Matrix FMEA
Capability & MSA
Measure
8/1/19 8/1/19 8/22/19 8/22/19 8/22/19
Multi-Vari
Initial FMEA Studies
Control
10/1/19 10/2/19 10/3/13 10/10/13 10/15/13
1-4
Project Charter
Business Case Problem Statement:
Genther Mexico has a high demand on ECU modules ACT Over the last 9 month the PPMS has out of specification in
Gentherm use 3 different selective soldering machine: Geentherm Mexico. The top # 1 (soldering bridges) because a
KISS-101, NOVO-101 and Selective soldering made in new ECU of 9 through-hole cavities until now the root causes
Gentherm welding process is one of the more complex process could not be detected ends up to extraordinary high scrap
in Gentherm costs/waste.
This process is the critical process and is one of the more
expensive machine in ECU Area. Goal Statement:
Reduce the Top Number One failure in Genther Mexico
(soldering Bridges ) which contributes 47 Pzs per week out of
defect caused according to the Pareto Analysis. Best approach
will be a production process based on Six Sigma level for the
overall soldering area .
Project Scope: Team Roles:
In Scope: Champion: Juan Rubio
MBB: Loon Kok Tan
selective soldering machine NOVO -101 ECU AREA GB: Alejandor Luebano
soldering Machine number: -Novo-102 A01316-200 Team: Carlos Vela, Mario G. Yafar Martinez, Juan
Rubio
Out of Scope: EoD:
.
(Expert on Demand)
1-5
Baseline Data
1-6
D
High Level Process Map
M
A
I
C
1-7
D
M
A
Low Level Process Map
Process:
I
Soldering PCBA/harness
C Training experience
Process Inputs (X) Type
NC
Process Step Output (Y)
Training consciousness NC
Training skills NC
Material flux crystallized NC
Method Slag cleaning NC Cable tinning PPMs due to mising soldering in secondare side of the
Method number of circuits to be tinned NC PCBA
Method cleaning of flux excess NC
Mother Earth lighting NC
Method soldering temperature NC
Training experience NC
Training consciousness NC
Training skills NC Insertion of cables into PPMs due to mising soldering in secondare side of the
Method fixture size bigger than necessary NC the PCBA holes PCBA
Method wear cavities NC
Method cavities inadequate in circuits gripping NC
Training experience NC
Training consciousness NC
Training skills NC
Very high machine NC
Very low machine NC Load of fixture with PPMs due to mising soldering in secondare side of the
Machine adjustment of rails very open C PCBAs in KISS machine PCBA
Machine adjustment rails very closed C
Setting machine stops very open NC
Setting machine stops very close NC
Undefined method in handling fixture NC
Training experience NC
Training consciousness NC
Nozzle cleaning flux method undefined NC
Cleaning method for deposit of flux undefined NC Flux aplication PPMs due to mising soldering in secondare side of the
Material flux Life Expectancy ended NC PCBA
Drop jet height machine very low NC
Machine preheated of flux NC
Training experience NC
Training consciousness NC
Machine height of the fountain very high C
Machine height of the fountain very low C
Method nozzle type NC PPMs due to mising soldering in secondare side of the
Method nozzle cleaning NC PCBA
Method fixture cleaning NC
Method cable stripping too long NC
Method cable stripping too short NC
Soldering of PCBAs
Machine fixture design NC
with harness
Machine amount of N2 very low C
Method pot cleaning undefined NC
Machine speed for soldering nozzle very high C
Machine speed for soldering nozzle very low C
Machine soldering temperature very high C
Machine soldering temperature very low
Method maintenance for fixture undefined
1-8
C
NC
Method circuits location NC
Method safety guard C
D
M
A
Third Level Process Map
I Process:
C
INPUT
Process Inputs (X) Type Process Step Output (Y) Think 6 M
Pot temperature C Good tining Man
Correct method of tin NC Machin
separate wires NC Materia
scrap due to soldering bridges Method
Estañado de alambres Measur
Mother Ea
1-10
D
M Quick Wins
A
I
C Still pending to
review nozzle
dimension because
the pcba with 9
cavities does not
have enough space
1-11
Before QW
1-12
Improvements Charts ( I –MR) After Quick Wins
After QW
Before QW
1-13
D Cause and Effect Matrix
M C&E Matrix
A
I
C
1-14
D
M Initial FMEA
A
I
C
1-15
D
M MSA
A
I
C
1-16
D
M MSA
A
I
C
mesure system Evaluation
A 2 14
3 15
4 13
Eva
Eva
Eva
1 bad
1 bad
1 bad
I
5 10 Eva 1 bad
62 Eva 1 good
C
78 Eva 1 good
8 12 Eva 1 bad
93 Eva 1 good
10 4 Eva 1 good
11 7 Eva 1 good
12 5 Eva 1 good
13 16 Eva 1 bad
14 9 Eva 1 bad
15 1 Eva 1 good
16 6 Eva 1 good
17 13 Carlos 1 bad
18 14 Carlos 1 bad
19 7 Carlos 1 good
20 6 Carlos 1 good
21 10 Carlos 1 bad
22 2 Carlos 1 good
23 16 Carlos 1 bad
24 3 Carlos 1 good
25 15 Carlos 1 bad
26 12 Carlos 1 bad
27 11 Carlos 1 bad
28 4 Carlos 1 good
29 1 Carlos 1 good
30 8 Carlos 1 good
31 5 Carlos 1 good
32 9 Carlos 1 bad
33 7 Eva 2 good
34 12 Eva 2 bad
35 11 Eva 2 bad
36 14 Eva 2 bad
37 15 Eva 2 bad
38 16 Eva 2 bad
39 1 Eva 2 good
40 6 Eva 2 good
41 3 Eva 2 good
42 2 Eva 2 good
43 10 Eva 2 bad
44 5 Eva 2 good
45 13 Eva 2 bad
46 4 Eva 2 good
47 9 Eva 2 bad
48 8 Eva 2 good
49 14 Carlos 2 bad
50 6 Carlos 2 good
51 1 Carlos 2 good
52 11 Carlos 2 bad
53 7 Carlos 2 good
54 9 Carlos 2 bad
55 2 Carlos 2 good
56 12 Carlos 2 bad
57 16 Carlos 2 bad
58 3 Carlos 2 good
59 8 Carlos 2 good
60 10 Carlos 2 bad
61 15 Carlos 2 bad
62 13 Carlos 2 bad
63 4 Carlos 2 good
64 5 Carlos 2 good
1-18
D
M MSA
Assessment Agreement Date of study: 10/1/2019
A Reported by:Victor Garcia
Name of product: solder bridge
I Misc:
C Within Appraisers
100 95.0% CI
Percent
95
90
Percent
85
80
75
70
Eva Carlos
Appraiser
1-19
D
Main Effect & Interaction Plot Chart For Important X’s
M
A
I
C
6 2 5 1
6 3 5 1
300
temperatura
6 3 4 0
17
velocidad
6 2 5 -0
290 10
6000 9000
flux
4.5 9
nozzle
1-20
D
M Improvement Phase
A
I Why DOE ?
C
1-21
Analysis of DOE PPMs Main Effects Screener for PPMs
Summary Report
Pareto Chart of the Effects Data Means
Effects Pareto
(response is PPMs, α = 0.05) Look for panels with large differences between levels.
Isolates the most important effects.
nozzle velocidad
Term 80331 flux
D A flux nozzle
BCD B temperatura
600000
C velocidad
ABC temperatur
D nozzle
BD
400000
AD velocidad
B
BC 200000 0 250000 500000
PPMs
4.5 9.0 10 17 Effect
CD temperatur flux
Effect is defined as the largest
C mean minus the smallest mean.
AC 800000
ABCD
Colors based on effect size, in
ACD standard deviations:
600000
AB Larger than 2
temperatura
1000000 500000 666666 0
17
velocidad
1000000 333333 833333 0
290 10
6000 9000
flux
4.5 9
1-22
nozzle
Ppms
Microsoft
PowerPoint Presentation LEAN Project in module Area
1-23
D
M What we Learn from the DOE
A
I
C the lesson learned in the DOE
It is the interaction that the
Surface Plot of PPMs vs temperatura, flux variables have with each other and
we can appreciate which are the
Hold Values
velocidad 13.5
nozzle 6.75
PPM s 600000
importance and it really provides us
400000
200000
300
with a more concrete view of the
problem to be solved so that you
295
6000 temperatura
7000
800 0 290
f l ux 9000
1-24
D
M Improvement Plan
A
I
C
Phase Improvements
Reduce novo machine programs from 7 programs without password only 3
1 programs with password.
Identify and update the correct flux injection point for PCBA , 4-6 , 7 and 9
2 cables.
3 Update nozzle from 12 to 9 mm.
4 Update WI with the new program's names.
1-25
D
M Improvement Plan
A
I
C
Final PFMEA Process/Product
Failure Modes and Effects Analysis
(FMEA)
Pag
Process or Product Name: ECU Modules Y soldering bridges Prepared by: Victor Garcia e
_1_
Responsible: Victor Garcia FMEA Date (Orig) _9/30/2019__ (Rev) _______00______
S O D R S O D R
Process Step Key Process Input Potential Failure Mode Potential Failure Effects E Potential Causes C Current Controls E P Actions Recommended Resp. Actions Taken E C E P
V C T N V C T N
How Severe is
you detect
How often does
cusotmer?
the effect to the
Input? the Key Input go on the Key Output Key Input to go controls and procedures the occurrance of the Cause, or e actions taken with the
wrong? Variables wrong? (inspection and test) that improving detection? Should Respo recalculated RPN? Be
(Customer prevent eith the cause or have actions only on high nsible sure to include
Requirements) or the Failure Mode? RPN's or easy fixes. for the completion
internal Should include an SOP recom month/year
requirements? number. mend
Update WI with new
Insertion of cables into the programs / software
Method cavities inadequate out of spec 10 cavity wear 8 Preventive Maintenance 6 480 10 2 4 80
PCBA holes with password /update
nozzle in machine
1-26
Control Plan
Control Plan
1-27
Future Plan & Knowledge
1-28