FASTARC™ is the trademark for a state-of-the-art steelmaking process
technology, including also auxiliary systems, optimised with respect to
available types of ferrous charge materials.
Since 1985 Danieli Centro Met has supplied 182 Electric Arc Furnace plants
on a turnkey basis or revamped existing EAF, developing both design,
process and automation technology.
25 de fev de 2023 2
Danieli 2010: Micromill…makes a minimill smaller and more profitable
Productivity range from 200,000 to 500,000 tpy of straight bars, wirerod, spooled coils
25 de fev de 2023 3
Energiron DR plant Meltshop Rolling Mills
- 1,600,000 tpy DRI Direct - 150 ton AC DANARC® EAF - 620,000 tpy - 120 t/h Flexible bar mill
Reduction Plant - 150 ton LF - 480,000 tpy - 120 t/h Wire rod mill
- 6-strands 9 m radius FastCast CCM
- 1,600,000 Nm³/h FTP
25 de fev de 2023 4
Iron
Ore
H2O
CO2
Reducing gas sources
– Natural Gas
– Reformed Gas
– Coal Gasification
– COG
– others Only for cold
DRI
fuel
O2
HYTEMP® Iron
EAF
Optional DR products
DRI
HBI
HYTEMP BRIDGE
25 de fev de 2023 6
Machine type EAF UHPAC - 200 ton
Shell ID 7,000 mm
Tap weight 150 ton
Hot heel 50 ton
Electrode Diameter 710 mm
Pitch Circle 1400 mm
Electrode Arms Conductive type
Tapping device EBT
Transformer Power 130 MVA + 20%
Danarc Module 5 x 2200 Nm³/h Oxygen Injectors
3 x 30 kg/min Carbon injectors
Raw material mix 100 Hot DRI, Cold DRI, Scrap
Auxiliaries Automatic temperature measuring &
sampling device
Automation system Levels 1, Level 2
25 de fev de 2023 7
DRI
FEEDING
POINT
25 de fev de 2023 8
DRI Analysis From Sampling Bin
Time Via Fe Met [%] Fe Tot [%] Met [%] C [%] S [%]
25 de fev de 2023 9
Flow rate DRI Kg/MIn
Electrical power
7000
6000
120
5000
80
3000
60
2000
40
1000
20
0 0
0 5 10 15 20 25 30 35 40 45 50 0 5 10 15 20 25 30 35 40 45 50
Tim e[Min] Time [ Min]
10000
[Kg/Min/KW]
9000 40
8000
7000
6000 30
5000
4000 20
3000
2000 10
1000
0 0
0 5 10 15 20 25 30 35 40 45 50 0,00 5,00 10,00 15,00 20,00 25,00 30,00 35,00 40,00 45,00 50,00
Tim e [Min] Time [ Min]
Coal
70 140
60 120
Lime & Dololime
Co al [ Kg /M in ]
50 100
[Kg/min]
40 80
30 60
20 40
10 20
0 0
0 5 10 15 20 25 30 35 40 45 50 0 5 10 15 20 25 30 35 40 45 50
Tim e [Min] Tim e [M in]
25 de fev de 2023 10
90% Hot DRI + 100 % cold
10% Cold DRI DRI
Tap to tap (min) 45,5 58,5
Power on time (min) 35 48,9
Electrical energy (kWh/t) 392 533
25 de fev de 2023 11
The good cooperation between ESI and Danieli has brought FASTARC™ operation at
Emirates Steels Industries beyond the contractual figures, demonstrating an excellent
thermal efficiency.
The consolidated consumption figures with 90% Hot DRI and 10% Cold DRI in charge are
comparable with the ones of 100% scrap charged:
This has been achieved exploiting the quality of the HOT DRI charged, its high degree of
metallization and its high enthalpy content.
With 100% Hot DRI charging, Tap to Tap of 41 min and Electrical Energy consumption of
380 kWh/ton of have already been reached.