Kharaghar

You might also like

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 10

KHARGHAR

FLYOVER
INTRODUCTION LOCATION
 This Skywalk'is crossing the national highway
with cable suspension Bridge resting on 41 m
tall pylon. Total length of skywalk is 1780 m
which makes it India's longest skywalk ever
built. The pylon of the skywalk is made-up of
structural steel and is the second steel pylon in
India after Vivekananda bridge at Kolkata. The
Skywalk has open type escalator in the
entrance foyer portion of Kharghar Railway
station with ramp for alighting.
CONNECTIONS
 Many types based on function
 Beam-to-Beam Connections
 Beam-to-Column Connections
 Column-to-Column Connections
 Column Base Plates•
 Pocket Beam•
 Gusset plate connections (truss type, frame type,bracings, ...)
 Splices (cover plates, ...)
BOLTING AND WELDING
BOTH DONE TO GET A
STABLE STRUCTURE
ONCRUTIAL
CONNECTIONSWELDING
JOINARY AT
BASEWITHBOLTING BUT
THE BOLTING ISCLIDTUED
COVERED WITH
STAIRCASE SUPPORT
 Wedges used forSteel frames on stringer Beam.
 The staircase has 4 flightsWith 3 landings.
 Each landing had steel Framed support from Base.

You might also like