This document outlines the key information needed to design a new chemical plant, including:
1) The system of units, project name, potential site locations, and design life that will be used.
2) Environmental and geotechnical data about the site location, including soil, seismic, and weather conditions.
3) Details about the raw materials, design objectives, capacities, and operating conditions for the plant.
4) Information on utilities needed like fuel, steam, water, and electricity.
This document outlines the key information needed to design a new chemical plant, including:
1) The system of units, project name, potential site locations, and design life that will be used.
2) Environmental and geotechnical data about the site location, including soil, seismic, and weather conditions.
3) Details about the raw materials, design objectives, capacities, and operating conditions for the plant.
4) Information on utilities needed like fuel, steam, water, and electricity.
This document outlines the key information needed to design a new chemical plant, including:
1) The system of units, project name, potential site locations, and design life that will be used.
2) Environmental and geotechnical data about the site location, including soil, seismic, and weather conditions.
3) Details about the raw materials, design objectives, capacities, and operating conditions for the plant.
4) Information on utilities needed like fuel, steam, water, and electricity.
This document outlines the key information needed to design a new chemical plant, including:
1) The system of units, project name, potential site locations, and design life that will be used.
2) Environmental and geotechnical data about the site location, including soil, seismic, and weather conditions.
3) Details about the raw materials, design objectives, capacities, and operating conditions for the plant.
4) Information on utilities needed like fuel, steam, water, and electricity.
• Include brief summary of project and customer name(if known and allowed to mention) • Information on potential sites where the plant might be located • Design life of the plant • Environmental and geographical conditions at location - Basic engineering design data (BEDD ) to be provided mentioning environmental , meteorological ( storm, rainfall , wind load , ambient conditions etc.,), and geotechnical data – Soil conditions , seismic zone etc., for civil design to be provided • Unit dependence (plant dependence if any) Basis & philosophy • Details of raw materials that are available, design objective (Summary - feed stock and alternative feed design composition cases, product quality requirements, off design cases, listing of all products destination, catalyst cycle lengths, future requirements, staged investment requirements etc.,) • Design capacity – The unit shall be designed to process (rate, units) of feedstock or products. Onstream factor – Client may specify availability targets. Stream factor – Operating hours or days per annum. Turn down ratio • Design feed cases – Case 1 / 2 etc., Alternate design cases or sensitive cases Basis & philosophy • Information on the conditions, availability and price of utility services such as fuel gas, steam, cooling water, process air, process water and electricity, that will be needed to run the process • The national, local or company design codes & standards that must be followed - The document should mention specifically regulatory approvals required for the project from all statutory authorities as this may have implication on design • Process design conditions – Include process description (if known), process parameters like pressure / temperature etc.,. Include all utilities design conditions (like power, water, Nitrogen, Air etc.,). Battery limit conditions • Summary of major equipment’s / facilities, buildings etc.,