iSCADA EMS TRAINING

You might also like

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 61

• iSCADA EMS (ENERGY MONITORING

SYSTEM) COMPREHENSIVE TRAINING


2018

DATE : 7&8 FEBRUARY 2018


LOCATION : HARTA MAINTENANCE SDN
BHD
1.0 INTRODUCTION OF ISCADA EMS PROJECT

1.1 System Architecture


1.2 Installation Process
1.3 Project Requirements
1.1 SYSTEM ARCHITECTURE
1.2 INSTALLATION PROCESS
1.21 INSTALL DIGITAL POWER METER & SECONDARY CURRENT
TRANSFORMER (CT)

Check on the reading on


Identify panel location to Install back the 3-phase
the DPM to confirm the
install DPM (Satec indicator fuse to power on
CT been clamp in correct
EM133EH/PM135EH. the DPM.
direction.

Connect 3 sets of CT to
.Identify the fuse for 3-
DPM. Clamp all 3 Configure the DPM
phase indicator and turn it
secondary CT on the accordingly.
off.
primary CT wire.

Mount DPM EM133 at


Loop the Red phase and
the din rail or remove
neutral & terminate it at
existing analog Data verification
the incomer power supply
volt/current meter to
for the DPM.
install DPM PM135EH

Loop R,Y,B,N wire from


Use multimeter do the
the outgoing supply of
testing for the voltage
fuse and terminate at the
flow.
DPM.
1.22 EXCHANGE EXISTING ANALOGUE VOLTMETER/AMMETER/DPM WITH
CURRENT TRANSFORMER (CT)

Pull R,Y,B CT cable from Switch on MCCB/ Switch


Identify location to install
the TTB and terminate it on MCB to power on the
DPM
at DPM. DPM.

Terminate the R,Y,B,N


Identify the proper voltage to the DPM and
location to install the CT Configure the DPM
do looping at R,N power
test Terminal Block and accordingly.
supply terminal for power
install it. up meter.

Remove the existing


Un-plug/turn off the fuse voltmeter/ammeter and Data verification
for R,Y,B,N phase install the new DPM.

Remove the R,Y,B,N Remove the R,Y,B CT


voltage cable from cable from analog meter
voltage selector or DPM or DPM and terminate one
and isolate it with by one at TTB.
insulation tape.
1.24 INSTALL DIGITAL POWER METER & CURRENT TRANSFORMER (CT) AT
ONLY EXISTING MCCB (MAIN CIRCUIT BRAKER)

Loop the Red phase and Pull & terminate R,Y,B


Identify MCCB and panel
neutral & terminate it at CT cable from the TTB to
location to install DPM &
the incomer power supply the DPM with 2.5mm
solid type CT.
for the DPM. cable.

Pull 2.5mm R,Y,B,N from


Install back protective
outgoing supply off the
Turn off MCCB. cover at MCCB and .turn
MCCB to DPM and
ON the MCCB
terminate both side.

Use multimeter do the


Pull cable for both S1 (red
testing for the voltage
cable) & S2 (black) from Configure the DPM
flow. Dismantle the
the solid type CT to accordingly.
protective front cover for
(TTB).
the MCCB.

Loose the bolt for each


Identify the location to
phase & install the solid
install DPM and test Data verification
type CT. Make sure CT
terminal block (TTB).
flow direction is correct.
1.3 PROJECT REQUIREMENTS

Site Visit

EMS panel
to DPM DPM Type
distance

Requiremen
t

DPM, EMS
Panel & Numbers of
iSTATION DPM
location

Telco
Signal
2.0 ISCADA HARDWARE

2.1 Panel Components


2.2 Digital Power Meter
2.3 DPM Installation Procedure
2.1 PANEL COMPONENT
2.1.1 iSCADA Master Panel 3k

1. Gateway 3000 Series


2. Reset Switch
3. SD-12
4. ADD 55A Power Supply
5. TP-Link 4G Modem
6. RCCB
7. Critec Surge Filter
8. AC Relay
9. M-7051D
10. i7510 Repeater
11. Battery
12. Terminal Block
2.1.1 iSCADA Master Panel 3kX

1. Gateway 3000X Series


2. Antenna
3. Reset Switch
4. ADD 55A Power Supply
5. RCCB
6. Critec Surge Filter
7. AC Relay
8. i7510 Repeater
9. Battery
10. Terminal Block
2.2 DIGITAL POWER METER

• 2.2.1 Satec EM133EH-RS5


• 2.2.2 Satec PM135EH-RS5
• 2.2.3 Satec PM135EH-5A
• 2.2.4 Schneider PM5110
2.2.1 SATEC EM133EH-RS5

• Made in USA
• Din rail mounting
• Secondary CT
• Volts, Amps, Power, Power
Factor, Frequency, Demand,
Energy.
• Accuracy Class 0.5S
• Standard 2-wire RS-485
Communication Port.
• Modbus RTU
SATEC EM133EH-RS5
2.2.1 SATEC PM135EH-RS5

• Made in USA
• Panel mounting
• Secondary CT
• Volts, Amps, Power, Power Factor,
Frequency, Demand, Energy.
• Accuracy Class 0.5S
• Standard 2-wire RS-485 Communication
Port.
• Modbus RTU
SATEC PM135EH-RS5
2.2.3 SATEC PM135EH-5A

• Made in USA
• Panel mounting
• Primary CT
• Volts, Amps, Power, Power Factor,
Frequency, Demand, Energy.
• Accuracy Class 0.5S
• Standard 2-wire RS-485 Communication
Port.
• Modbus RTU
SATEC PM135EH-5A
2.2.4 SCHNEIDER PM5110

• Made in France
• Panel mounting
• Primary CT
• Volts, Amps, Power, Power Factor,
Frequency, Demand, Energy.
• Accuracy Class 0.5S
• Standard 2-wire RS-485 Communication
Port.
• Modbus RTU
SCHNEIDER PM5110
PRIMARY CT
SECONDARY CT
2.3 DPM INSTALLATION PROCEDURE

Chargeman
standby

iSCADA
will not
Shut down
involve in
schedule
shutdown
process
3.0 ISCADA ACCOUNT - MONITOR

• 3.1 Introduction
• 3.2 Viewing live data
• 3.3 Data trending
• 3.4 Exporting data
• 3.5 View and extracting report
3.1 INTRODUCTION

• The iSCADA v3 platform is entirely web-based and compatible with the world’s most
popular web browsers, so you can access and monitor all the data you need anywhere,
anytime. 
• With powerful analytics algorithms built into the software, our iSCADA V3 platform can
give you intelligent information based on raw data gathered.
3.2 VIEWING LIVE DATA
• Step 1: Open the Web browser (Recommended Browser is Firefox) and use
www.google.com to search ‘iSCADA’.
• STEP 2: Select “Devices World : Welcome" and click ‘’Login’’.
• STEP 3: Enter your Customer ID, User ID and Password. Then, click “Login”.
STEP 4: iSCADA Customer Page display will be shown, click on “Monitor” icon.
STEP 5 : Click and expand Radicare (M) Sdn bhd.

Click to
expand
STEP 6: Click and expand Demand, Electrical and iHEPS. Click on selected panel
to view and observe every panel you open is opened in a new tab.

Tab

Select Panel
to view
STEP 7: To observe real time data, place the mouse pointer on the graph and you will
observe a pop out display showing the data value and the time stamp at that point.

Place the
pointer here
 
3.3 DATA TRENDING
STEP1: In the display panel click on "Trending"

Click on
Trending
STEP 2: To trend a specific data first select the chart (1), select data query range (2) and
click on "Go" icon (3). And observe the following graph being displayed.

1
2
 

 
3.4 Exporting Data
STEP 1: To extract the data in a CSV format click on the following icon as highlighted below. Once
selected the correct chart and the data query range the user wish to extract and you will observe the
following pop out to download the data.
STEP 2: Click on the icon "ok", after selecting the option "save file" and download the file. Once
downloaded, open the file and the user will observe the extracted CSV file as follows.
3.5 View and extracting report
STEP1: Click on the icon "Report"
STEP2: In the "Event log" tab select the Report period (1) required by the user, select the Report type (2)
as "user" and click on the icon "Go" (3).

2 3

   
STEP3: Once the "Go" icon is clicked there will be 4 columns that will appear to make the selection.
These are Spatial, System, Channel name and User event.
Step 4: Once the selection for all 4 columns are selected, select the Record per page (5) option
and click on "Generate" (6) and the following screen will appear.

5 6

 
 
STEP1: Click on the icon as shown below
STEP2: When the icon is clicked select the option to extract the current page or all pages. When the
selection is performed the following pop up will appear requesting to download the extracted report.
STEP 3: Select the save file option and click on the "ok" button and the following file will be
downloaded in the CSV format.
4.0 ISCADA ACCOUNT - ALERTING

•4.1 Introduction
•4.2 SMS and email alert
4.1 INTRODUCTION

• Through its wireless capabilities, iSCADA V3 will alert you or any member of your operations team
when such event occur.

• iSCADA alert also offer escalate level.


4.2 SMS AND EMAIL ALERT

• SMS alert sent out for AC Failed and AC


AC Status Normal status.

Voltage • SMS alert sent out for DPM Power Trip


and DPM Power Normal.
Reading
5.0 ISTATION

•5.1 Hardware
•5.2 Requirements
5.1 HARDWARE
5.2 REQUIREMENTS

• Location must be approved by Radicare and ‘Jurutera Operasi Hospital Negeri’ (JOHN).
Location

• Fast and stable internet connection 3G/4G.


Internet
Coverage

• Radicare need provide AC source to the dedicated location.


Power
Supply
6.0 USER ACCEPTACE TEST (UAT) PROCESS

•6.1 Introduction
•6.2 Preparation
•6.3 Requirements
6.1 INTRODUCTION

• User Acceptance Test (UAT) is the last phase of software and hardware
testing process.
• During UAT, actual users test the software and hardware to make sure it
working according to specifications.
6.2 PREPARATION

• Make sure all hardware installed properly before UAT.


• All DPM reading captured by iSCADA system and data verified.
• All documentation for UAT is completed.
• Date and time
6.2 PREPARATION

Documentatio
Software
n

Date and
Hardware
Time
Preparation
for UAT
6.3 REQUIREMENTS
Project
Report
Software
Radicare
Subscriptio
T&C Form
n

Picture
iSCADA
Before and
Login
After

Operation Warranty
Manual Certificate

UAT Form
QUESTION AND ANSWER
Thank You