ATP – NETgear

Administration Process

Empowering an intelligent,
sustainable and connected world
ATP Documentation Process

MOS + Installation Integration Pre-ATP Document Creation Document Upload To Document Submitted
PPM (ASP to EID)

• Take Data • RSA Pre- • Finishing • SID


NETgear Integration Installation, • BoQ
• RSA MOS Labelling, Color • NETgear
Coding • ATP RAN + Power
• Take • RLDW
Documentation
• ABDW
(Photo, Captures)
• NETgear • ABDN
Movement (If
Applied)

● NETgear tagging does not required for site to be integrated, strongly advised for field team to take data
NETgear during MOS process
● Pre-ATP must be done within 1 day (for new site) and 3 days (for modernization with major dismantle activity)
after site integrated along with closing RSA to ensure all data completed and ready for ATP document
● Documentation process must strictly follow HSE protocol
● Current ATP template is Version 2.45 include Power System functionality test
Document Requirement

●SID

●BoQ

●As Build
Drawing
●P-ATP

●ATP ●ATP Document


Requirements Ready to submit
●RLDW

●As Build
●NETgear Documents
Movement
EID Part

●NetGear ATP

ASP Part
ATP Submission & Review Process
5 Working Days
1 Working Day

5. IO ND 7. ASP field
1. ATP Request team Visit site &
Document Reviewer Review ATP via 9. EID MS
Received from 3. EID upload to Schedule to EID ERRA release approval
ASP ACT MS Applicaton for Batch ATP

2. Internal 4. EID request 6. EID MS 8. If Approved


Review by EID schedule ATP Assign continue to Point
Review Batch to Reviewer & 9, If Reject Back
IO ND Schedule Date to Point 4
for Onsite ERRA
1 Working Day

● ATP review process refer to Capex Restart 2.0 done by Batch Review, by visiting 10%-15% of total site per
batch, and review remaining site remotely to define punch list for FAC
● ASP must ensure team availability when ATP batch submitted. ATP can be done with no full team as long as
engineer and 1 helper with WAH certificate present
● Due to the nature of random pick for site candidate by MS PIC, ASP can request reschedule/change site if any
problem occurred to the site that has been chosen by MS PIC to be visited on site
NETgear Process
1. ASP
Request user 9. EID to
NETgear for 3. New User 5. Task ID review &
Engineer/Field ID released by assigned to 7. NETgear circulate
team IOH AMG field team tagging (MOS) approval

2. EID Create 4. Admin 6. Field team 8. Upload task


ticket for new create task ID to check task ID NETgear
user NETgear ID in their
mobile device

● NETgear task ID can be created and assigned in advance prior to MOS plan
● If a task ID already assigned to a certain user ID, but there is a change in plan for MOS that cause the site to
be handled by different PIC, no need to create new task ID. Just simply give the ID information to the new PIC
● Task ID can be checked everywhere to ensure correct site assigned to the user, but to open it must be within a
certain radius from site location (100 meters)
● After tagging NETgear, if the network condition makes it impossible to upload the task, e.g. no 4G network and
slow connection, field team can upload the task ID outside site area as long as they keep the application chace
intact
New Dismantle Acceptance MOCN Project

ATP Review Released (ND


ASP tagging NETgear + ATP Doc submit + Req EID Submit ATP Doc + Review Process & Inbound
Dismantle Process - MS)
Produce ATP Doc Schedule Inbound Request Schedule Inbound schedule pooling
Inbound Schedule (AMG)

Dismantle Process – Acceptance Estimation 2 weeks

• For MOCN project there is ATP document that need to be reviewed by EID MS (For total
dismantle only)
• Capture deletion ENM will be provided by EID
ATP – NETgear PIC

Contact Person:
Fendri Fendriana : fendri.fendriana@ericsson.com – 081510729699
Nayat : nayat.nayat@ericsson.com – 0816931449
Febri Wahyu S : febri.wahyu.s@ericsson.com – 081586742318
Dwi Setiawan dwi.setiawan@ericsson.com – 085771153306
Ahmad Mujahidin ahmad.mujahidin@ericsson.com – 081377353344
Farhandika Prasedana farhandika.prasedana@ericsson.com –
085697059815
Tri Deswantoro tri.deswantoro@ericsson.com – 08567022277
Sunsun Rusmanto sunsun.rusmanto@ericsson.com – 081563187003
Mokhamad Khamim mokhamad.khamim@ericsson.com – 087889213181
Nurul Septi Kumala Ayu nurul.septi.kumala.ayu@ericsson.com –
085640446447
Thank you