Sustainable Construction Material For Flagship Projects of The DOTr Ver March 9 2023
Sustainable Construction Material For Flagship Projects of The DOTr Ver March 9 2023
Russel Smith, Admiral Ernesto Enriquez (Ret) and Former Usec Rommel Gavieta
Rizome
March 2023
Engineered Bamboo from Rizome & Dragonwood
Architectural Material and Structural Element Made in the Philippines
Engineered Bamboo is a Sustainable Material that is aligned to NEDA’s
Sustainability-based Economic Model
Central Grand Rail Station Naples, Italy (Structural Ginkgo Swan Lake Station, Xiusui New District of Jiaxing
Applications) (Architectural Applcations)
Engineered Bamboo for Tacloban and Dumaguete Airports
Architectural Material and Structural Element
PhP1.4 billion New Tacloban International Airport
• The second phase of the project will start early this year
with a budget of PHP700 million, according to CAAP.
• The PHP17-billion airport will replace the existing Dumaguete airport and handle
the influx of passengers that will reach up to 2.5 million by 2038
• PHP13 billion will come from Seoul’s official development assistance through the
KEXIM, while the remaining PHP3.9 billion will be shouldered by the DOTr.
Proposed Action Plan to Incorporate into the Terms of Reference (TOR) the
use of Engineered Bamboo as a Structural Element & as an Architectural
Material
• DOTr Team and Sec Lorenzo’s Team to coordinate in finalization of the TOR the
use of Engineered Bamboo that accentuates the Filipino Branding of Tacloban
& Dumaguete Airports.
Engineered Bamboo Rail Tie
for PNR and LRTA Requirement
Architectural Material for Rail Stations and Structural Element for Rail Sleeper
Double Deck Rail Line Development and Operation is Possible
Double Deck Rail Line in Brighton Beach Brooklyn New York Double Deck Rail Line for Metro Rail and Freight Rail Line
• Skyway was constructed over an operating South Luzon Expressway and Osmena Highway.
(SLEX and Osmena Highway was not closed to traffic)
• LRT2 was constructed over the narrow street of Aurora Blvd.
(Aurora Blvd wasn’t closed to traffic)
Track Relocation Project
• TRP2 for Pandacan Bridge (PhP 404,341,353.48) and TRP 3 for 13 Steel
Bridges (733,507,848.13)
TRP Map 15
Direct losses due to Closure of Revenue Service
between Tutuban to Calamba
If passenger traffic is closed the estimated economic losses are as If freight rail line development comes after 5-year closure the
follows: cargo losses the estimated economic losses are as follows:
• Approximately 65million passengers displaced over a 5-year • Laguna Gateway Inland Container Terminal (LGICT) has an
period from the Class “C” & “D” bracket will a fast and low cost annual capacity of 125,000 TEUs
means of transportation
• LGICT represents 10% of container traffic coming from the
• Approximately PhP780million in revenue service loss over a South of Metro Manila
period of 5-years will be lost and then increase subsidy for PNR
to service existing loans and MOE costs of the PNR • Congestion cost due to 31,000 container trucks a day on the
road over 5 years: PhP141billion
• The displacement of 65million passengers over a 5-year period
will accrue a congestion loss of PhP7.4trillion • Cargo opportunity lost for Canlubang Inland Depot over 5
years: PhP226million
• Total additional travelling time of 94billion productive hours
lost over 5-years for the 65million PNR passengers over the 5- 60% of 2.3 million containers going to the Port of Manila comes
year period from the south of Metro Manila
Sustainable Rail Tie for the At-Grade Line
from Tutuban to Calamba Rail Line
• DOTr and Sec Lorenzo’s Team to coordinate in finalization of TOR in the engagement of Highly Specialized
Project Management Consultancy Service to Synchronize the 3 activities along the South Commuter Rail
Project Corridor (Section 49.1 Limited Source Bidding of the Government Procurement Reform Act
(GPRA) and GPPB Resolution 05-2011 Section 3.2 a)
Alternatively, secure the Technical Assistance from the Australian Embassy for the engagement of Highly
Specialized Project Management Consultancy Service to Synchronize the 3 activities along the South
Commuter Rail Project Corridor
• DOTr Team and Sec Lorenzo’s Team to coordinate in finalization of the TOR that incorporates Engineered
Bamboo Rail Tie in the Track Relocation Project
• DOTr Team and Sec Lorenzo’s Team coordinate in finalization of the TOR that promotes Filipino Branding in
the renovation of MRT3 Stations along EDSA by 2024.
THANK YOU
Simultaneous Development of Two Projects and Continued Passenger
Service
Bali Airport