Technology Program Review
June 4, 2013
Agenda
Welcome and Agenda Review Julie Cernich 2:00 – 2:05 pm
6
Monthly Program Review: Focus Group Output
• Form Focus Group Ops Review / Updates Ops Review / Updates • Deliver/Deploy/Operate
• What’s working? structure?
Ops Readiness Overview MRC,
• Where can we Post Deployment Update Collision Calendar • PM Focus area?
improve? • Accenture (SPA) Update?
Natural Disaster Updates (snow
• Met bi-weekly storm, hurricane Sandy)
PPM Evolution Update
• Post-launch updates?
• Brainstorm agenda • Top 10?
Best in Class project overview and
ideas best practices
Olympus • App Dev Methodology?
• Deployment Framework?
Quarterly Release update Quarterly Release update • Architecture update?
Focus Group
Architecture - Frank Tom Project Reviews (specific projects
Project Reviews (specific projects
App Dev - Josh Nelson TBD)
TBD)
App Dev - John Olmstead
App Dev - Harold Anderson
App Dev - Jennifer York
Engineering - Mike Latino
Engineering - David Hicks
Engineering - Sesha Gubbala
Engineering - Rob Ames
Tech Ops -Scott Smith
TQC - Kay Taylor
TQC - Daniel Forester
TQC - Deigo Ballesteros
BRR CAM - Will Bracker
BRR CAM - Kevin Nichols
BRR PM - Lance Casey
Tell the project story – tell “cause & effect” and Put positive spin on Ops reviews (outages, prod
Record and send action items to PMs (they can't how we’re impacting end customer issues) - add lessons learned, but don’t let positive
take notes while presenting) • History of origination, capabilities, milestones & high level tasks, spin obscure the ugly truth either
where is project today, demos where applicable
Use break-out sessions or small task-teams to
Add SharePoint link in the project status slide Bring in projects that never went yellow or red discuss topics, i.e top 5 pain points in Technology
• Collect commonalities month to month of 'perfect' projects. or problem solving an issue for a particular project
Educate on best practices...
9
DHCP Cluster Down in Oklahoma City
Description: Storms in the area caused the AC Power to cycle, this activity affected a board within UPS-A
causing it to reboot. The UPS-A failure exposed the lack of AC power redundancy to the effected
equipment.
Description: A configuration change was applied to the Voice Portal Applications to enable more efficient use of
connections to the database. This action was a result of the incident on 12/24/2012. This configuration change
was tested within lower environments with Cox assistance. The change had to be backed out, and it did not go
successfully. The original file versions were not restored.
Description: A server switch at Duke Drive (Switch 14) had a configuration applied to the uplink interfaces
that isolated the switch from the rest of the network. This caused a loss of connectivity to hosts that were
directly connected to the switch and the services and applications that these hosts support.
13
MRC & Enterprise
Collision Calendar
Tim Cotter
Exec. Director, Technology Svc Mgmt & Client Support
June 4, 2013
14
Maintenance Readiness Committee (MRC) – Overview
The Maintenance Readiness Committee leads risk assessment, get well plans and
discussions around major errors & vendor engagement for major outages
Semi-Manual
• High Risk, High Impact ECR Tickets
are auto-fed
• Most other entries are manually
entered
Troy Meyers
Sr. Director, Technology Quality & Control
June 4, 2013
18
PPM Evolution – What is it and Why do it?
PPM Evolution includes an Upgrade, Improving current customizations, Simplifying
the user experience, Enabling new capabilities, & Launching resource management.
7 We need faster insight of project and program work plans, changes, risks, issues,
and interdependencies.
2014+
et to P PM Ev o lu tion?
How did we g 2013 Future Capabilities
Expansion of Resource
2012 Management
capabilities
Demand Management
2011 EPM Expansion
Get Healthy! Get Simple! Run Asset Revision
Financial Integration
2010 EPM Stand-Up with Sage, Oracle Get on the same page! Release Management
Enterprise focus Established PPM PPM upgrade to 9.2 Program Management
Existing PPM functionality Governance Board introducing numerous Timesheet / Actuals
UPF Introduced
was reconfigured / turned usability enhancements Integration
Basic PPM functionality off: EPM, Assured,
Improve financial summary
deployed to support the Proposal Technology Executive Scorecard
roll-out of UPF 1.0 Project Transformation & Proposal, Work Entry
Proposal
ALM/QC integration
Introduction of new PPM alignment integration
Projects concepts & PPM
PPM Roadmap Integration of Technology’s
Staffing Profiles functionality such as:
assessment started Assured process
POA
Budgets by stage Introduction of Resource
Investment categories Management functionality Pending
Enable PM Methodology
Funds
Guardrails, ensure data
accuracy
Ability to scale
100+ Projects 200+ Projects 400+ Projects
Portfolio-only Focus Portfolio & Project Focus
Proprietary and Confidential – BitByBit Solutions – for intended recipient(s) only.
20
PPM Evolution – PPM Strategic Roadmap
Work completed from Nov – Jan. Findings, recommendations reviewed in Jan with the PPM Governance
Board. Sponsor alignment in January. 2013 implementation planning activities started in February.
Key Inputs to Roadmap:
• Assessment of current implementation
• Stakeholder interviews to capture bus objectives, priorities
• EPM Technology Transformation 2013 Roadmaps
• PPM Maturity Model, Best Practices
• PPM Upgrade plan, approach
• User Adoption
Resource Mgmt - Pilot Q3, Launch Nov. Transformation Project Work Plans (EPM & Technology)
• Process for Technology employees, staff augmentation • Autonomous capabilities between project and
contractors, & professional service resources within PPM work-stream
• Core functionality of Resource management configured • Optional assignments of resources to work-plan
• Report on Technology Capacity at Organization, • MS Project interface capabilities (business process
Department, and Resource Pool level of this module is TBD)
• General usability enhancements
Info Graphic PPM Business PPM Technology PPM RFx WorkForce Logic
May 31 Road Show Road Show Deep Dive Training PPM War Room Deep Dive Training
Mon 6/10 - Fri 6/28 Mon 6/24 - Fri 7/12 Mon 7/15 - Fri 8/9 Mon 7/29 - Fri 8/9 Mon 8/12 - Fri 8/23
Dev. Methodology
Deep Dive Training
myAXis Table tents August Video Mon 8/12 - Fri 8/23
August 2013 September
June Project Tri-Fold July July EPM Technology Interview
Launch Technology
FastForward Update Hand Outs FastForward Newsletter FastForward Updates
Announcement PM & BA COE, Architecture FastForward
Jun 3-7 Jun 17 Jun 21 Jul 1-5 Jul 1-5 Aug 5-9 Aug 12-16
May 27 Deep Dive Training Sep 3-6
Aug 12-23
What we heard
Your benefits
Improved visibility into and portability of project and portfolio information across the organization
What we heard
PPM is difficult to navigate
Your benefits
Increased usability, reduced duplication, improved ability to plan and manage cross-functional projects
Program Governance
Key POCS
Julie Cernich CPMO & PM Methodology
Athena Costarides Technology Lead
Paul Dangel EPM & Business Processes
Shermillia Edmeade Assured & Gating
Bill Hulsey
VP, Field Engineering & Operations
June 4, 2013
28
Olympus – Aligning Multiple Program Dependencies and Ownership
Tight collaboration across programs will be necessary to ensure success and avoid duplication of
efforts. APM will provide the information to support all programs. Governance will align the
teams.
Collaboration across programs and with Field leadership will be necessary to ensure success.
Below is the program structure with key members of the leadership team.
Olympus will guide discovery and analysis across programs – driving to one IT roadmap.
Olympus IT Governance
• Governance Management • Risk Management • Scope Management • Financial Management
• Issue Management • Quality Management • Dependency Management • Business Case Management
EBI
APM - Troux
Infrastructure Discovery
• Usage
• Function
Application Discovery
• Mapping to Application
• Application Surveys
• Submitted to domain leads and Directors
• Pre-populated with previously collected data Data / Information Discovery
• Usage
• Function
• Mapping to Application
Dan Connolly
Sr. Director, Technology Quality & Control
June 4, 2013
33
Quarterly Release Update – Q2: PVE Friendlies Launch 6/27; GA on 8/5
QA Int
Environment Plan:
Environments can support delivery as planned assuming PVE 1.0 &1.0.1can exist in the same environment as stated by Cisco
Ask:
• Hold off on ALL non-essential environment changes between now and 8/15 that impact the Video QA environment
• All changes in the labs (Duke & P6) that touch QA Video environments follow the ERM environment change control process
• Development fix agent & environment support for nights & weekend testing including Cisco
QA3
CR34223 – 9 CR34384
CR34236 – 7 CR34731
hard launch dates
CR34255 CR34829
CR34291 – 313 VMRD Soft VMRD Hard
Launch Launch
QC3003
QC2876
Release B
QA1
IP-VPN
CR34417 display issues
CR35075
* Integration testing identified during
Alpha will impact
soft / hard launch
IPC MA 1.1
IPC MA & VV 1.2
COI
Release C
QA2
CR34255 QC3130 QC3166 – 68
CR34384 QC3138 QC3173 – 4
CR34731 QC3147 – 8 QC3176 – 84
CR34800 QC3150 – 1 QC3187
CR34803 QC3155 QC3190 – 94
CR34804 QC3159 – 63 QC3196 - 7
We are here
SVT
PVE
Env Release Solution Test UAT 2 SVT by Support
Dev Deploy
Build Candidate 4 – 6 Weeks Weeks TechOps 2 Weeks
Tech PM
Business Current facilitates Tech PM
Owner Review & Shares
Identify
Initiates Release Analysis Analysis with
Change (gathers CAM &
Request (CR) estimates) Release
in PPM with Tech Manager
Teams
Future
Determine
Approved Tech PM
appropriate Tech PM
timing to Disposition Communicates
Shares of Change
prepare to project team
Analysis Request
estimates & Builds
Results w/
Change into
CCRB
Not Plan
Approved
s s with
P roce Tech Lead Communicates & Provides
Ryan Meisenheimer
Sr. Manager, Technology Business Requirements & Relationships
June 4, 2013
37
CM IT^2 – What is it?
Key Drivers:
• 90% of current equipment beyond 5th year of service.
• Key applications require upgrades to SQL2K8.
• Microsoft support of SQL2000 expired April 2013.
Business Impact:
• Platform to support CMI objectives for the next several years and enable implementation
of CMI project roadmap.
• Platform designed and implemented to CCI standards to ensure enhanced support.
• SQL platform will include dedicated Dev, QA, Training, Staging, and Production
environments.
• Formal CCI support model and SLA’s (Hardware/OS only)
CMI
Project Management
Technology/Engineering
SQL / Application Support (ATL/PHX)
BRR
Project Management
QA (SQL Server / Application)
Finance
standards.
- CCI ownership of hardware and OS infrastructure support. CMI maintains
support of SQL platform and various applications (Novar, TIM, etc.)
- Formalized service model and creation of SLA’s for various environments.
in
Governance
• Cross organizational
• Cross functional Class
• Breaking down of barriers
• Partnership built on respect & trust
• LOTS OF COMMUNICATION
Current
J
Upgrading of hardw are and database platforms to improve system performance and
Brief Description (scope) Customer
employee productivity
Satisfaction
l
CAM: Ryan Meisenheimer
receiving the SAN storage. Further
delays related to configuration of SAN. Project Manager: Ryan Meisenheimer Non Labor Opex $224,784 $193,729 ($31,055)
Business Owner: Dan Garvel Capex Softw are $161,334 $154,136 ($7,198)
Scope Requirements have been established and
l
Technology Ow ner: Debbie Simmons Capex Hardw are $572,070 $566,000 ($6,070)
hardw are architecture constructed.
Detailed design is complete and approved. Employee Labor $33,124 $40,000 $6,876
Key Partners: CMI
Contractor Labor $16,905 $9,000 ($7,905)
Budget Funding has been secured and all Key Vendors: N/A
l
Other $0 $0 $0
hardw are and softw are licenses have
been procured.
Target Market(s): All markets Totals $1,008,217 $962,865 ($45,352)
Risks or Issues
Type Description Priority Owner Impact Date
Risk Microsoft terminates SQL Server2000 support High Tom Meyer 4/9/2013 43
Risk Complex support model betw een CCI and CMI High Ryan Meisenheimer 7/15/2013 41
Risk Lack of SQL2K8 experience Low Tom Meyer 3/1/2013 25
Risk Unpredictable IT production issues/escalations unrelated to IT^2 Medium Ryan Meisenheimer 2/4/2013 64
Risk Inadequate amount of SAN allocated to infrastructure High Tom Meyer 4/1/2013 52
Risk High 0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
0
0
14
21
7
13
Engineering Quality & Controls Tech Operations 0
0
0
0
0
0
43
Project Summaries
44
Traditional & Milestone Technology Delivered Project Gantt
Customer
# Project Name Schedule Scope Budget
Sat
1 Discoverer to OBIEE n n n n
3 BroadSoft R19 n n n n
4 Trio 2.1 n n n n
5 PVE n n n n
47
Discoverer to Oracle BI (OBIEE) – PSTAGE
Infrastructure • Cox’s Discoverer environment is limited to PSTAGE and offers end users a site
specific view for reporting and analysis purposes (Finance Oracle Discoverer instance is out
of scope)
Cost • Cox incurs annual support costs for the two reporting platforms, exceeding
$200K annually
ICOMS ODS
% of Discoverer/PSTAGE
Future Phase – Data Mirror % of Discoverer/PSTAGE Tables in EDW and Integrated
from ICOMS to ODS Tables in EDW with OBIEE Ad Hoc
At Project Inception
Other PSTAGE 133/274 tables exist in EDW 49% EDW 51% 0% OBIEE
X-Y Tables 700 Tables
PSTAGE-Discoverer
274 Tables
Project Objectives
ICOMS % of Discoverer/PSTAGE
Tables in EDW and Integrated
% of
Discoverer/PSTAGE with OBIEE Ad Hoc
Tables in EDW
At end of Phase 1
Other PSTAGE 226/274 tables in EDW 82% EDW 18% 82% OBIEE 18%
X-Y Tables Y Tables
PSTAGE-Discoverer
274 Tables
Projected Accomplishments
• 82% of in scope PSTAGE data will exist in the Enterprise Data Warehouse
Infrastructure • 82% of in scope PSTAGE data will be available for ad hoc reporting and business
analysis within OBIEE
User Experience • Users are one step closer to having a fully integrated reporting experience
through EDW-OBIEE for reporting and business analysis.
% of Discoverer/PSTAGE
% of Discoverer/PSTAGE Tables in EDW and Integrated
Tables in EDW with OBIEE Ad Hoc
Project Status
At end of
Other PSTAGE Phase 2 100% EDW 100% OBIEE
X-Y Tables Y Tables
PSTAGE/
Discoverer274 Tables
Projected Accomplishments
5
3
Proprietary and Confidential – BitByBit Solutions – for intended recipient(s) only.
53
PROJECT: Discoverer to OBIEE PPM Number(s): 34522 Report as of: 5/29/13
Current
Brief Description (scope) Migrate Oracle Discoverer Metadata (ICOMS-PSTAGE) and Reports to OBIEE 11G. Customer
Satisfaction J
Overall Project Status: Technology
Category: Remaining
Development YTD Financials Actuals Budget
Schedule On target (phase 1 project end date Spend
l
CAM: n/a
targeted 10/18)
Project Manager: Greg Pascal Non Labor Opex $0 $0 $0
l
Technology Ow ner: Lionel Tamez Capex Hardw are $0 $0 $0
l
Other $0 $0 $0
Risks or Issues
Type Description Priority Owner Impact Date
Issue Issues identified w ith the existing data architecture. Weekly w orking sessions scheduled to prioritize key issues and enhancements
High for data clean
Anoop
up. Beena 4/11/2013 ##
Risk Project de-scoped due to funding and resource constraints. Additional budget amount requested to cover remaining scope is pending
High review andLisa
approval.
Coleman 4/19/2013 ##
Risk Gatew ay view conversion deployment delays may have dow nstream schedule impacts due to ETL dependencies Medium Salila Sharma 5/17/2013 ##
Issue Oracle issues impacting report functionality and data aggregation in the OBIEE Ad Hoc Environment. Service ticket opened w ith Oracle
High support for
Kevin
resolution.
Doherty 5/21/2013 ##
0
0
0
0
0
0
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
0
0
0
0
0
0
Engineering Quality & Controls Tech Operations 0
0
0
0
0
0
55
Oracle EBI Exadata
Build Out
56
Oracle EBI Exadata Build Out – Project Overview and Business Drivers
Infiniband Infiniband
Infiniband 10gE
Infiniband
Phase 1
• Enables high-bandwidth connectivity between existing 3 Exadatas via ZFS backup appliance
• Needed to establish daily full refreshes into Advanced Analytics Sandbox on V2
• Build new integrated lower environments
• Provides Rec Engine & Project B multiple Dev & Test envs to enable simultaneous changes
• Expected End Date 6/21
Infiniband Infiniband
Infiniband
Phase 2
• Install new X3 to host Production functionality
• More memory, CPUs, Storage (faster & more reliable)
• Install new ZFS backup storage appliance
• Existing ZFS not sufficient to backup all prod & non-prod env
• Repurpose x2 Full from Prod to non-Prod/move non-prod from ½ rack to x2
• Doubles current non - Prod capacity Projected end date: 9/1
• Phase 2
Phase 3
• Supplement X2 ½ rack w/ new X3 ½ rack, creating an X3 Hybrid Full & re-purpose for Prod Active Stand-By
• Projected End Date: 10/31
Current
J
Expand the existing Exadata platform to host 3 new low er environments, the Enterprise
Brief Description (scope) Customer
Analytics Sandbox, and add new Exadata and ZFS hardw are.
Satisfaction
l
CAM: N/A
Project Manager: Russ Johnson Non Labor Opex $8,142 $0 ($8,142)
l
Technology Owner: Lionel Tamez Capex Hardw are $1,859,442 $3,209,799 $1,350,357
environment Informatica servers. CR
pending approval to bring back to green. Employee Labor $75,097 $440,380 $365,283
Key Partners: Oracle
Contractor Labor $11,727 $223,639 $211,912
Budget Key Vendors: Prosys
l
Other $453,439 $0 ($453,439)
Risks or Issues
Type Description Priority Owner Impact Date
Risk V2 environments cannot backup to ZFS due to space shortage on ZFS (w ill be resolved w ith X3 buildout) Low David Blair ##
Risk Oracle does not support the connectivity from ZFS to the V2 using the Infiniband cables that w e currently ow n. Low Spencer Taft ##
Risk Converting INFA to Exadata connections from 10 GB to 1 GB; risk pending testing Medium Jim Prather 6/15/2013 79
Risk PM on vacation 6/6 - 6/16 Low Russ Johnson 6/16/2013 25
0
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
0
0
0
0
0
0
Engineering Quality & Controls Tech Operations 0
0
0
0
0
0
64
BroadSoft R19
Upgrade & Hdw Swap
65
BroadSoft R19 – Upgrade Path Overview
6
6
Proprietary and Confidential – BitByBit Solutions – for intended recipient(s) only.
66
BroadSoft R19 – What’s Changing?
Sequence Network What’s Changing Applications Potential Impacts to Testing
Component Impacted Other Services Recommendations
EMS BW Version 19.sp1 Alarm RPT/Event None PVE new servers; limited
Eng testing capability in PVE; trap
11 New Hardware (x2) verification in SVL
MS BW Version 17.0 to 19ap1 None All voice svcs requiring NSE: MS Regression, VOIP: SVT
CALEA & Media conf & Lite, 2 SDI & PVE 2 servers
New Hardware (x12)
3 announcements
NS BW Version 17.0 to 19.sp1 Vision CLI Trunks, IPC, Toolbar, NSE call through testing & NS
commands eMTA, RC, IPBM, AP, regression, Vision & EDGE /CG
New Hardware (x6) CLI regression, VOIP:SVT Lite,
MYA, EDGE/CG
Mkt env readiness verif, 2 SDI
4 & 2 PVE required
AS BroadWorks Version 17.0 to Vision, Billing, (CDRs), Trunks, IPC, Toolbar, NSE Full AS reg, Vision
19.sp1 (assumes AS swap is MA, EDGE/CG, Voice eMTA, RC, IPBM verify no API chgs, MA /
Mgr & Cox.com EDGE/CG verify no API and
clean & Prod is patch current) no edited EXSRs in use
6 CXSP BW Version 17.0 to 19.sp1 MYA (External Auth IPBM, Toolbar, RC, NSE: Included in AS testing,
for clients) IP, Phones MA: verify clients still auth
correctly
J
fortify BSFT framew ork and
Brief Description (scope) BroadSoft support contract reaching end of life in 2013. This effort includes both R19 Customer
understands implications to CB
server upgrades and patching as w ell as a hdw sw ap (EMS, MS & NS). Satisfaction
delivery schedules.
Overall Project Status: Category: Infrastructure Remaining
YTD Financials Actuals Budget
Schedule NSE Analysis & Design 75% Complete Spend
l
CAM: Darryl Foster/Rob Sundal
pending SDI testing; ETC 9/20
On track to complete 12/14/13 Project Manager: Dana Dawson Non Labor Opex $0 $0 $0
Business Owner: Jeff Adelmann Capex Softw are $2,548 $9,100 $6,552
Scope PS, AS & XSP softw are R19 upgrade
l
Technology Owner: Michael Latino Capex Hardw are $324,389 $384,701 $60,312
EMS, MS & NS hdw sw ap (R19)
$123,470 $522,006
Key Partners: Tech Ops Employee Labor $398,536
l
Other $0 $141,972 $141,972
Vendor labor & Materials; Add'l funding & Tech Ops
w ill be requested to cover cross-
enterprise activity and App labs. Target Market(s):
BroadSoft, EdgeWater Totals $495,574 $1,148,779 $653,205
Yes Align Gate -0Yes Align Gate -6Yes Tech Gate: Portfolio Alignment Launch Closeout
11/2/13 Launch - 11/02/13
0 Launch - 11/02/13
4
12/14/13 Project End 0- 12/14/13
Project End 2- 12/14/13 Entry Portfolio Align Launch Close
Current Completed 68
PROJECT: Voice Mgr – Broadsoft R19 PPM Number(s): 0 Report as of: 6/3/13
Risks or Issues
Type Description Priority Owner Impact Date
Risk Physical EDGE/CG & Cox.com dependency; Design assumes BSFT Portal screens customized off EXSP; leverage CG High Josh Nelson 6/27/2013 ##
Issue Additional funding w ill be requested for cross-enterprise labor and App Dev labs; approx. $215k ($1.4M total) High Dana Daw son 7/18/2013 ##
Issue Parallel Analysis, Design, Build, Test & Deploy activities require immediate and committed full lifecycle engagement High Dana Daw son 6/13/2013 ##
Issue CB & Technology 3Q13 prioritization and alignment; contends w ith VMRD, Fairfax County & UC for env & resources High Dana Daw son 6/13/2013 ##
0
0
0
0
0
0
Functional Dependencies 17
12
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 12
Modified w orkf low s, SRQ's, ORQ's Diff Scripts, Analysis, Design, Code/Conf ig changes Modified Reference Architecture 12
0
16
12
15
22
Engineering Quality & Controls Tech Operations 0
NSE Detailed Design, MOP's & Test Results Test Strategy & Plan, Screen Analysis, Regression and end SVT & MOP validation, Deployment Strategy & MW schedule
0
point testing
0
0
0
0
69
Trio 2.1
70
PROJECT: Trio 2.1 (Formerly VG 1.1) PPM Number(s): 33849 Report as of: 6/3/13
New release for the "Trio" video product family. The goal is to make more video content Current
L
Enterprise launch w ill not be
Brief Description (scope) available in more places w ith easier access and a "cooler", more enjoyable user Customer
completed by end of June.
experience. Key feature to be delivered is Personalized Video Experience. Satisfaction
l
CAM: Alyse Minsky
customer uprades on 6/26 and enterprise
complete on 7/30. Project Manager: Cheryl Redmond Non Labor Opex $16,227 $196,900 $180,673
l
Technology Owner: Rob Smallwood Capex Hardw are $0 $2,100 $2,100
Marketing, Prod Dev, Netw ork
Employee Labor $386,278 $513,272 $126,994
Key Partners: Security, QA, Provisioning,
SDS, and Prod Deploy Contractor Labor $2,217,457 $4,659,901 $2,442,444
Budget Extended timeline to implement Key Vendors: CPS, Cisco, SlingMedia
l
Other $11,054 $0 ($11,054)
contingency build may have budgetary
impacts.
Target Market(s): All Trio Markets Totals $2,631,016 $5,372,173 $2,741,157
Date MilestoneDummy
if any Milestone Height Define Analyze Design Build
SDLC Phase:
8/9/12 Project Start0- 8/09/12
Project Start10- 8/09/12 Test Trial Launch Stabilize
1/17/13 Portfolio Gate
0 - 1/17/13
Portfolio Gate
8 - 1/17/13
3/14/13 Align Gate -03/14/13
Align Gate -63/14/13 Tech Gate: Portfolio Alignment Launch Closeout
6/26/13 Launch - 6/26/13
0 Launch - 6/26/13
4
9/20/13 Project End 0- 9/20/13
Project End 2- 9/20/13 Entry Portfolio Align Launch Close
71 Curre nt Comple te d
PROJECT: Trio 2.1 (Formerly VG 1.1) PPM Number(s): 0 Report as of: 6/3/13
Risks or Issues
Type Description Priority Owner Impact Date
Risk Customer upgrade path from Trio 1.8 to Trio 2.0/2.1 not tested in Market UAT. Low Paxson 6/27/2013 77
Risk QA Market UAT an Solution Test Plan is aggressive and includes overtime/w eekend test execution. No room for slippage. Medium Paxson/Ferro 6/15/2013 ##
Risk Final QA Cycle reduces full coverage regression tests to risk-based cases only and force testing of targeted defects. High Gavin 6/14/2013 ##
0
0
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
Project Charter, Business Requirements, Functional Technical Engineering Specs, Release Notes, Application Conceptual Architecure Diagram, Technical Design 0
Requirements, End-to-End Project Schedule, End-to-End Code, Provisioning 0
Budget Forecast, Project Register, RACI, Issue-Action-
29
Decision Log, Risk Log, Meeting Minutes, Status Reports,
Lesson Learned 8
10
3
Engineering Quality & Controls Tech Operations 14
Test Strategy, Test Plans, Test Results Support Handoff Plan, Service Guide
3
0
0
0
0
72
Trio 2.1 – Timeline
6/26 7/30 8/5 8/15
Alpha Launch
Trio 2.1 Enterprise Launch Complete
Trio CD UAT
21.4 QA
Trio CD UAT
21.4.1 QA
Control Group CG
Testing in CA
All Enterprise
Employees and All
Enterprise MTCs
Customer
Upgrades OC/OKC
Customer
Upgrades
SD/SB/Tulsa
Customer
Upgrades
RI/Clev/BR/KS
Customer
Upgrades
Conn/FL/NOLA/Omaha
Customer
Upgrades
Hampton Rd/
MC/Roa/LV
Customer
Upgrades NoVa/GC
/AZ Consumer Alpha Launch
7
3
73 Proprietary and Confidential – BitByBit Solutions – for intended recipient(s) only.
Personal Video
Experience (PVE)
74
PROJECT: Personal Video Experience (PVE) 1.0 PPM Number(s): 34054 Report as of: 5/28/13
Current
J
This project w ill benefit Cox by providing customers a new , common interface across
Brief Description (scope) Customer
multiple devices for all their entertainment and communications services.
Satisfaction
l
CAM: Alyse Minsky
8/5 Customer launch dates. Risks exist,
and there is no slack remaining in the Project Manager: Kashif Choudry Non Labor Opex $0 $329,000 $329,000
schedule
Business Owner: Charles Scarborough Capex Softw are $0 $267,931 $267,931
Scope Scope is baselined for PVE 1.0. The CR
l
Technology Owner: Joseph Ferro Capex Hardw are $139,935 $792,935 $653,000
process is being used to track any
changes. Some CRs have been slated for Converged Services, Video Employee Labor $317,302 $1,554,770 $1,237,468
Key Partners:
PVE 1.0.1 (8/15 launch date) Product, Marketing, Care
Contractor Labor $1,395,918 $7,832,248 $6,436,330
Cisco NDS, SeaChange,
Budget Budgets have been developed across all Key Vendors:
l
Accenture Other $0 $0 $0
areas at the resource level supporting the
2013 PVE and Trio roadmaps. CRs have
eaten into the budget. Target Market(s): All Markets Totals $1,853,155 $10,776,884 $8,923,729
Risks or Issues
Type Description Priority Owner Impact Date
Risk Complete solution testing w ill all tracks (VOD, CVM, Trio, PVE client) cannot begin until 6/3. Must complete in 1 cycle High Philip Preiser 6/3/2013 ##
Risk The impact of absorbing the enhanced metadata track has caused no slack in the CVM schedule High Tara Flack 6/15/2013 91
0
0
0
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
Complete Technical Requirements Complete Trio 2.1 Development & Fixes Complete Solution Segmentation Document (SSD) 0
Complete CVM 5.0 Development & Fixes 0
Complete VOD-Adrenalin Development & Fixes
13
Complete PVE Client Development & Fixes
7
17
18
Engineering Quality & Controls Tech Operations 25
Complete Netw ork Design - VOD, CVM, PVE Complete Test Strategy Complete Support Model Document
0
Complete Test Plan
0
0
0
0
76
PVE – Launch Timeline
6/27 8/5 8/15
May Jun Jul Aug Sep
QA Trio 2.0/2.1 Market Rollout 7/25
7
7
77 Proprietary and Confidential – BitByBit Solutions – for intended recipient(s) only.
Improving the Trio
Delivery Ecosystem &
Wrap-up
Kevin Hart
EVP and Chief Technology Officer
June 4, 2013
78
Improving the “Trio Delivery Ecosystem”
Dedicated DSG
Work Order Accuracy
80
PROJECT: Operations Excellence PPM Number(s): 32829 Report as of: 5/31/13
l
CAM: Al Briggs
Project Manager: Davis McKnight Non Labor Opex $146,618 $96,552 ($50,066)
l
Technology Ow ner: John Hunt Capex Hardw are $0 $0 $0
l
Other $1,255 $5,343 $4,088
Target Market(s): All Field Services Sites Totals $1,777,692 $1,844,735 $67,043
Date MilestoneDummy
if any MilestoneHeight Define Analyze Design Build
SDLC Phase:
11/8/11 Project Start0- 11/08/11
Project Start10- 11/08/11 Test Trial Launch Stabilize
3/22/12 Portfolio Gate
0 - 3/22/12
Portfolio Gate
8 - 3/22/12
12/20/12 Align Gate -012/20/12
Align Gate -612/20/12 Tech Gate: Portfolio Alignment Launch Closeout
2/25/13 Launch - 2/25/13
0 Launch - 2/25/13
4
4/18/13 Project End 0- 4/18/13
Project End 2- 4/18/13 Entry Portfolio Align Launch Close
81 Curre nt Comple te d 81
PROJECT: Operations Excellence PPM Number(s): 0 Report as of: 5/31/13
Risks or Issues
Type Description Priority Owner Impact Date
Risk Possible dependency on a minor amount of data output of Performance Management project - none know n at this time Low Davis McKnight ##
Risk Delay in inbounding to EBI and obtaining analysis w ill cause Alignment Gate date to move from 10/4 to 12/20 Low Shaw n Tresner ##
Risk Realignment of sub-regions in EDW is going to cause a CR to change the design of this project Low Davis McKnight 1/1/2013 93
0
0
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
0
0
0
0
0
0
Engineering Quality & Controls Tech Operations 0
0
0
0
0
0
82
PROJECT: ETA Direct Enhancements PPM Number(s): 32826 Report as of: 5/31/13
J
2. Priority #2: Upgrade ETAdirect
Brief Description (scope) Customer
3. Implement ETAdirect enhancements
Satisfaction
4. Identify and mitigate issues w ith current state routing
Overall Project Status: Category: Customer Experience Remaining
YTD Financials Actuals Budget
Schedule GREEN overall w ith no know n open major Spend
l
CAM: Al Briggs
issues.
Project Manager: Mike Horton Non Labor Opex $0 $0 $0
l
Technology Ow ner: BSS Capex Hardw are $0 $0 $0
issues.
Employee Labor $36,395 $0 ($36,395)
Key Partners: TOA, G7
Contractor Labor $662,197 $993,000 $330,803
Budget GREEN overall w ith no know n open major Key Vendors: TOA, G7
l
Other $1,764 $0 ($1,764)
issues.
Date MilestoneDummy
if any MilestoneHeight Define Analyze Design Build
SDLC Phase:
12/7/11 Project Start0- 12/07/11
Project Start10- 12/07/11 Test Trial Launch Stabilize
7/31/12 Portfolio Gate
0 - 7/31/12
Portfolio Gate
8 - 7/31/12
8/9/12 Align Gate -08/09/12
Align Gate -68/09/12 Tech Gate: Portfolio Alignment Launch Closeout
3/7/13 Launch - 3/07/13
0 Launch - 3/07/13
4
6/20/13 Project End 0- 6/20/13
Project End 2- 6/20/13 Entry Portfolio Align Launch Close
83 Curre nt Comple te d 83
PROJECT: ETA Direct Enhancements PPM Number(s): 0 Report as of: 5/31/13
Risks or Issues
Type Description Priority Owner Impact Date
0
0
0
0
0
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
0
0
30
0
0
0
Engineering Quality & Controls Tech Operations 0
0
0
0
0
0
84
PROJECT: CB Hospitality Wi-Fi Trial PPM Number(s): 32905 Report as of: 5/31/13
Provide Cox branded business grade Indoor Wi-Fi Internet Amenity model product for Current
Brief Description (scope) small and medium Hospitality customers. The scope of this trial is 1 property in each of
Phoenix and San Diego.
Customer
Satisfaction J
Overall Project Status: Category: Product Remaining
YTD Financials Actuals Budget
Schedule Jeopardy Notice 14-Ops Accept. Spend
l
CAM: Mike Emry
completing Core failover & alarm validation
for all 7 markets. JN 15 -CGN failover; Project Manager: Joseph Scially Non Labor Opex $128,691 $246,000 $117,309
CGN 1.1 is scheduled for 5.30
Business Owner: Jeff Adelmann Capex Softw are $0 $0 $0
Scope Product w ants to have 8 market launchs
l
Technology Ow ner: Matt Hayes Capex Hardw are $0 $0 $0
across the CORE regions for the market
launch (GA) Care, Local Markets, Tech Employee Labor $75,975 $40,000 ($35,975)
Key Partners:
Ops, Security.
Contractor Labor $27,138 $72,000 $44,862
Budget Key Vendors: Cisco
l
Other $412,200 $332,423 ($79,777)
Date MilestoneDummy
if any Milestone Height Define Analyze Design Build
SDLC Phase:
4/15/11 Project Start0- 4/15/11
Project Start10- 4/15/11 Test Trial Launch Stabilize
9/30/11 Portfolio Gate
0 - 9/30/11
Portfolio Gate
8 - 9/30/11
2/9/12 Align Gate -02/09/12
Align Gate -62/09/12 Tech Gate: Portfolio Alignment Launch Closeout
12/13/12 Launch - 12/13/12
0 Launch - 12/13/12
4
6/27/13 Project End 0- 6/27/13
Project End 2- 6/27/13 Entry Portfolio Align Launch Close
85 Curre nt Comple te d 85
PROJECT: CB Hospitality Wi-Fi Trial PPM Number(s): 0 Report as of: 5/31/13
Risks or Issues
Type Description Priority Owner Impact Date
Risk CGN f ailover testing completed for GA of CB Hospitality - target complete 5/30/13 High Matt Hayes 81
Risk Core failover and alarm validation for all 7 markets - Phx is still pending Medium Matt Hayes 75
Risk Service Delivery process supporting new customer requests from dev to QA to Productions. This is needed for GA High Thomas Liaw ##
Risk CB Hospitality w orkflow coordinator for all markets that w ould go to Atlanta Medium Thomas Liaw 76
0
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
OSS - Development of the splash pages f or CB Hospitality for 0
each new customer and w orking thru the low er environments. 0
0
0
0
0
Engineering Quality & Controls Tech Operations 0
Technology w orking w orking w ith QA team on maintenance Herman Layne is w orking w ith Las Vegas, Onaha, San
0
schedule for CBH for minor changes. Diego and Phoenix RDC for Operational Acceptance. The
target completion is for 4/15/13 0
0
0
0
86
PROJECT: Cox Media Business Intelligence (CMBI) PPM Number(s): 32780 Report as of: 5/31/13
J
performance indicators (KPIs) & daily health snapshots to drive business The customer remains satisfied w ith
Brief Description (scope) Customer
improvements. Helps streamline business for Cox Media (Sales, Marketing, Fulfillment, the EBI Cox Media Development team.
Satisfaction
Finance).
Overall Project Status: Category: Corporate Center Remaining
YTD Financials Actuals Budget
Schedule * 2Q 2013 Implementation in progress Spend
l
CAM: Ryan Meisenheimer
Project Manager: Pratik Shah Non Labor Opex $0 $0 $0
l
Technology Ow ner: Dan Garvel Capex Hardw are $0 $0 $0
* 2Q 2013 Development
* 3Q 2013 Requirements Employee Labor $15,618 $21,500 $5,882
Key Partners: Cox Media
* Ongoing support and training
Contractor Labor $414,008 $512,776 $98,768
Cognizant Technology
Budget * Program funded by through 1Q 2013 Key Vendors:
l
Solutions Other $0 $0 $0
* Burning on budget
Risks or Issues
Type Description Priority Owner Impact Date
Risk 0
0
0
0
0
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
0
0
0
0
0
0
Engineering Quality & Controls Tech Operations 0
0
0
0
0
0
88
PROJECT: Trio 2.0 (Formerly VG 1.0) PPM Number(s): 34153 Report as of: 5/30/13
Video Gatew ay utilizes new set top technology as a gatew ay w ithin the w hole home Current
L
Target w as Q1 2013 deployment.
Brief Description (scope) netw ork to provide video entertainment to TVs and ultimately other consumer Customer
Launching w ith Trio 2.1 in 2Q.
electronics (CE) platforms via IP delivery mechanisms. Satisfaction
l
CAM: Alyse Minsky
customer uprades on 6/26 and enterprise
complete on 7/30. Project Manager: Cheryl Redmond Non Labor Opex $1,344 $31,500 $30,156
l
Technology Ow ner: Josh Nelson Capex Hardw are $0 $0 $0
Project charter w ith scope is baselined. Marketing, Prod Dev,
No change requests submitted. Employee Labor $65,995 $110,325 $44,330
Key Partners: Netw ork Security, QA,
Provisioning, SDS, and Prod Contractor Labor $69,278 $300,861 $231,583
Budget Additional funds allocated at PRC. On Key Vendors: NDS, Cisco (Broadcom)
l
Other $14,205 $0 ($14,205)
target for remaining spend. Need to
ensure spend ends in July.
Target Market(s): All Trio Markets Totals $150,823 $442,686 $291,863
Date MilestoneDummy
if any MilestoneHeight Define Analyze Design Build
SDLC Phase:
10/13/11 Project Start0- 10/13/11
Project Start10- 10/13/11 Test Trial Launch Stabilize
12/1/11 Portfolio Gate
0 - 12/01/11
Portfolio Gate
8 - 12/01/11
4/5/12 Align Gate -04/05/12
Align Gate -64/05/12 Tech Gate: Portfolio Alignment Launch Closeout
6/26/13 Launch - 6/26/13
0 Launch - 6/26/13
4
6/30/13 Project End 0- 6/30/13
Project End 2- 6/30/13 Entry Portfolio Align Launch Close
89 Curre nt Comple te d 89
PROJECT: Trio 2.0 (Formerly VG 1.0) PPM Number(s): 0 Report as of: 5/30/13
Risks or Issues
Type Description Priority Owner Impact Date
Risk Customer upgrade path from Trio 1.8 to Trio 2.0/2.1 not tested in Market UAT. Low Paxson 6/27/2013 77
Risk QA Market UAT an Solution Test Plan is aggressive and includes overtime/w eekend test execution. No room for slippage. Medium Paxson/Ferro 6/15/2013 ##
Risk Final QA Cycle reduces full coverage regression tests to risk-based cases only and force testing of targeted defects. High Gavin 6/14/2013 ##
0
0
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
Project Charter, Business Requirements, Functional Technical Engineering Specs, Release Notes, Application Conceptual Architecure Diagram, Technical Design 0
Requirements, End-to-End Project Schedule, End-to-End Code, Provisioning 0
Budget Forecast, Project Register, RACI, Issue-Action-
12
Decision Log, Risk Log, Meeting Minutes, Status
12
13
13
Engineering Quality & Controls Tech Operations 23
Test Strategy, Test Plans, Test Results Support Handoff Plan, Service Guide
3
9
0
0
0
90
PROJECT: Cox Business Voice Manager Redesign PPM Number(s): 32803 Report as of: 5/29/13
A redesign of the Cox Business UI utilizing Edge APIs that separate interface from Current
K
CB supports Tech Product Validation
Brief Description (scope) application. Anticipated benefits enable timely BSFT platform maintenance, reduce UI Customer
Strategy; schedule to align
development cycles, and create an improved overall customer experience. Satisfaction
l
CAM: Venetta Bridges
activity delayed due to a variety of Env
Jun Whitehead/J
Config Mgt issues (page 2 for details) Project Manager: Non Labor Opex $0
Freeman
Business Owner: Jeff Adelmann Capex Softw are $0
Scope Nothing new to report
l
Technology Ow ner: Novarro Williams Capex Hardw are $0
Employee Labor $0
Key Partners: Cognizant
Contractor Labor $0
Budget NEW Tech Financial report continues WIP Key Vendors: Broadsoft
l
Other $810,225 $1,554,146 $743,921
Risks or Issues
Type Description Priority Owner Impact Date
Risk CG Teams needs to test alpha build in production prior launch Medium Daniel Mumford 5/1/2013 61
Risk Performance Testing completion Medium Doug Honikel 5/1/2013 30
Risk UAT Testing Medium Candi Kerst 4/26/2013 11
Risk March forecast overspend, results of additional cycles of QA, SVT, Performance testing required for defect remediation Medium 4/12/2013 ##
Risk Alpha launch blocking defects found in UAT expected to be completed/tested for 5/8 release Medium Nate Ow en 5/1/2013 90
Risk Production level certification needed betw een CS and MA Medium Daniel Mumford 5/1/2013 55
Risk Decision to move forw ard w ith 5/8 launch dependent outcome of continued UAT High Jeff Adelmann 4/26/2013 75
0
0
0
Functional Dependencies 10
3
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 16
10
23
16
27
4
3
Engineering Quality & Controls Tech Operations 6
3
0
0
0
0
92
PROJECT: Project Apollo PPM Number(s): multiple; tracked by work stream Report as of: 5/31/13
Current
K
Design and implement an Enterprise-w ide Technology Platform that w ill improve Call Tech and Cust Care have good
Brief Description (scope) Customer
Center functionality and reliability. partnership on delivery
Satisfaction
l
CAM: Jon Flack
remediation is fully validated
Project Manager: Tom Ryan Non Labor Opex $70,818 $209,984 $139,166
Business Owner: Scott Wise Capex Softw are $56,644 $8,323 ($48,321)
Scope
l
Technology Ow ner: Floyd Alcorn Capex Hardw are $1,914,013 $3,626,877 $1,712,864
l
Other $0 $0 $0
Risks or Issues
Type Description Priority Owner Impact Date
Issue Voice Portal degradation event on 4/15. Root cause determined to be 2 of 5 application servers in "hung" state due to Medium Woodson 5/18/2013 ##
excessive log file entries. Root cause determined to be incorrect logrotate file configuration. Mitigation in place. ##
Remediation steps planned. 26
Risk Communications Manager hardw are has been upgraded to improve CPU capacity. Version 6.3 of CM softw are High Woodson 5/13/2013 ##
has been loaded into Staging, w hich is designed to perform in a more optimal fashion and provide more CPU ##
headroom; Regression testing underw ay. 38
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
BSS - management/coordination of project activities 0
0
0
0
0
0
Engineering Quality & Controls Tech Operations 0
Management and execution of Market UAT Management and execution of infrastructure enablement;
0
"Day 2" / Managed Services activities
0
0
0
0
94
PROJECT: Cox Targeted Metro Wi-Fi PPM Number(s): 33108 Report as of: 5/31/13
Project w ill benefit Cox by providing CHSI customers access to Cox’s Internet Service Current
Brief Description (scope) outside of their homes. It is expected that this increased utility w ill lead to low er churn
rates.
Customer
Satisfaction J
Overall Project Status: Category: Product Remaining
YTD Financials Actuals Budget
Schedule The w ork in 2013 has been broken into 2 Spend
l
CAM: Mike Emry
releases
Project Manager: Joseph Scially Non Labor Opex $49,145 $49,145 $0
l
Technology Ow ner: Matt Hayes Capex Hardw are $0 $0 $0
Cisco, EBI, OSS, CNS, Ops, Employee Labor $132,985 $199,775 $66,790
Key Partners:
Engineering, Unica
Contractor Labor $209,440 $209,440 $0
Budget Key Vendors: Cisco, Order Bridge
l
Other $1,436,965 $1,436,965 $0
Date MilestoneDummy
if any MilestoneHeight Define Analyze Design Build
SDLC Phase:
12/1/11 Project Start0- 12/01/11
Project Start10- 12/01/11 Test Trial Launch Stabilize
5/17/12 Portfolio Gate
0 - 5/17/12
Portfolio Gate
8 - 5/17/12
9/30/12 Align Gate -09/30/12
Align Gate -69/30/12 Tech Gate: Portfolio Alignment Launch Closeout
1/15/13 Launch - 1/15/13
0 Launch - 1/15/13
4
8/15/13 Project End 0- 8/15/13
Project End 2- 8/15/13 Entry Portfolio Align Launch Close
95 Curre nt Comple te d 95
PROJECT: Cox Targeted Metro Wi-Fi PPM Number(s): 0 Report as of: 5/31/13
Risks or Issues
Type Description Priority Owner Impact Date
Risk Upgrade to OS REL 5.8 and QNS 5.3.4 w ill break w ork-arounds in place w ith current versions Medium Rob Yeary 90
0
0
0
0
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
OSS - Development team (Captive portal) w ill bring in-house 0
the development of the captive portal splash pages and 0
connect to the API to Cisco AAA. OS 5.8 REL and QNS 5.3.4
0
upgrades
0
0
0
Engineering Quality & Controls Tech Operations 0
QA team w orking on release and maintenance schedule to Support of a new product and platform for Wi-Fi. Improving
0
support Wi-Fi the processes as the product matures
0
0
0
0
96
PROJECT: Retention PPM Number(s): 32901, 32900, 32902 Report as of: 5/30/13
Development of a CSR retention tool to support & optimize a national reactive retention Current
Brief Description (scope) strategy. The program w ill enable our ability to maintain market share and meet LRP
commitments.
Customer
Satisfaction J
Overall Project Status: Category: Customer Experience Remaining
YTD Financials Actuals Budget
Schedule Currently on schedule and target to Spend
l
CAM: Scott Nelson
complete deployments by Mid-May
Project Manager: Drew Everhart Non Labor Opex $46,089 $46,093 $4
l
Technology Ow ner: Floyd Alcorn Capex Hardw are $0 $0 $0
that w as agreed upon on 6/29.
Employee Labor $440,189 $522,439 $82,250
Key Partners: Marketing
Contractor Labor $2,255,164 $2,637,117 $381,953
Budget 2012 YTD: Actual spend is in line w ith Key Vendors: Pega Systems
l
Other $0 $0 $0
budget approved by PRC on 10/18/12.
Risks or Issues
Type Description Priority Owner Impact Date
Risk Risk: iNav/iKnow have quarterly releases that include multiple initiatives. If the other initiatives delivery timelines slip, it w ill impactLow
delivery for Retention
iNav/iKnow ##
Risk Risk: Significant dependency on EBI data for successful, on-time delivery Medium QA 73
Risk Risk: Business ow ner/process for Kana content management not yet fully def ined (resource necessary to build the solution) - Kickoff
Low scheduled for
Business
10/23 ##
Risk New England Leadership has some concerns on the offer matrix and losing PSUs. Low Business 77
Risk Ret. Leadership has concerns w ith the offer matrix goals, w hich could delay future deployments Low Business 94
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
0
0
0
0
0
0
Engineering Quality & Controls Tech Operations 0
0
0
0
0
0
98
PROJECT: CHS D3GW PPM Number(s): 32911 Report as of: 5/31/13
This project is intended to result in Cox’s ability to use approved DOCSIS 3 gatew ays Current
K
Business has requested a delay until
Brief Description (scope) as part of a COX Home Security installation, w ith secure WiFi setup supported through Customer
risks are mitigated.
an automated provisioning process. Satisfaction
l
CAM: Will Bracker
reschedule the technology launch to the
July timeframe to allow for further testing. Project Manager: Chad Quayle Non Labor Opex $0 $0 $0
l
Technology Ow ner: Kevin Hart Capex Hardw are $0 $0 $0
likely require further development by both
parties. Employee Labor $52,173 $63,000 $10,827
Key Partners: Tech Ops, BSS, OSS
Contractor Labor $35,504 $100,000 $64,496
Budget Key Vendors: iControl
l
Other $0 $0 $0
Risks or Issues
Type Description Priority Owner Impact Date
Issue Installation of IP Cameras is problematic, due to netw ork security contraints built as documented in the BRQs High Hales 4/25/2013 ##
Risk Progressing as-built w ill create more problems than it solves in installations that include IP cameras High Quayle 4/25/2013 ##
0
0
0
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
0
0
18
0
0
0
Engineering Quality & Controls Tech Operations 0
CHS Engineering and Project Management are w orking
0
together to mitigate the risks related to camera-pairing. We
are w orking w ith the vendor and partner MSOs to 0
determine a corrective course of action. 0
0
0
100
PROJECT: CTVC CB Combined PPM Number(s): 33875 Report as of: 5/23/13
TBYB w ill support onsite demonstrations of the Campus Cox TV Connect (CTVC)
Current
J
product (PC, Mac, iPhone, iPad, etc) for Cox Business. Supporting EAS/EAN,
Brief Description (scope) Customer
Advanced Reporting functionality for universities as w ell as Android devices for Cox
Satisfaction
Business.
Overall Project Status: Category: Products Remaining
YTD Financials Actuals Budget
Schedule Product Requirements baselined; TRD Spend
l
CAM: Alyse Minsky
review s completed
Project Manager: Jen Pham Non Labor Opex $0 $660,808 $660,808
Jay Langa, Jeff
Business Owner: Capex Softw are $0 $313,315 $313,315
Adelmann
Scope EAS/EAN, Android Devices/Smartphone,
l
Technology Ow ner: Josh Nelson Capex Hardw are $0 $360,865 $360,865
Adv Reporting, TBYB and Additional App Dev,Video Prod/Prod
Universities/LDAP Integration Employee Labor $24,421 $82,506 $58,085
Key Partners: Ops,Tech Ops,Care,QA,
Net/Sec Eng, Mktg Contractor Labor $46,912 $825,702 $778,790
Budget Technology spend of $1.9M from Mar to Key Vendors: NDS
l
Other $0 $0 $0
Dec
Risks or Issues
Type Description Priority Owner Impact Date
Risk SOW does not include Cisco SI&T in support of the project Low James/Jen 57
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
Develop/maintain technology schedule Support smoke and integration test activities N/A 0
Support smoke and integration test activities Support environment readiness activities for Q3 release 0
Support environment readiness activities for Q3 release Support product deployment
0
Support product deployment
0
0
0
Engineering Quality & Controls Tech Operations 0
Support product deployment Develop final test summary report Support product deployment
0
0
0
0
0
102
PROJECT: Avaya Day 2 PPM Number(s): 34906 Report as of: 5/31/13
Milestone 1 is the first IVR code release post Avaya deployment. It includes
Current
J
enhancements to increase the authentication rate. By increasing the authentication rate
Brief Description (scope) Customer
w e are able to provide more callers the ability to transact their business in the IVR
Satisfaction
alone.
Overall Project Status: Category: Customer Exp & Mktg Remaining
YTD Financials Actuals Budget
Schedule No know n issues Spend
l
CAM: Al Briggs
Project Manager: Brent Wenson Non Labor Opex $0 $41,250 $41,250
l
Technology Ow ner: Julie Porath Capex Hardw are $0 $0 $0
l
Other $0 $0 $0
Risks or Issues
Type Description Priority Owner Impact Date
Risk If the Targus w eb service response time is not fast enough, it may introduce latency in IVR application performance during authentication
Medium treatment.
Julie
This
Porath
w ould generate a negative caller ##
exp
Risk If the hosting and/or support model for the Targus w eb service is not adequate for a 24x7x365 application, prolonged outage conditions
Medium could occur,
Juliereducing
Porath the success rate and negatively
##
0
0
0
0
0
0
0
0
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
0
0
0
0
0
0
Engineering Quality & Controls Tech Operations 0
0
0
0
0
0
104
PROJECT: Long Distance Cost Optimization (LDCO) PPM Number(s): 32807 (2012+) : 31711 (2011) Report as of: 5/31/13
LDCO w ill create a nationw ide common voice interconnection to existing Cox LD net Current
Brief Description (scope) carriers via a low er cost IP based protocols (i.e., trunk side SIP) and enable the
aggregation of all Res/CB voice traffic from all markets over shared interconnections
Customer
Satisfaction J
Overall Project Status: Category: Product Remaining
YTD Financials Actuals Budget
Schedule Testing to complete on schedule Orange Spend
l
CAM: Kevin Nichols
County and OKC.
Project Manager: Daniel Paine Non Labor Opex $0 $0 $0
l
Technology Ow ner: Chris Draper Capex Hardw are $0 $0 $0
project inception.
NSE, Backbone Eng, Ops, Employee Labor $184,941 $228,479 $43,538
Key Partners:
Sec Eng
Contractor Labor $78,798 $108,933 $30,135
Sonus, Juniper, Empirix,
Budget Financials updated as of 5/29/13 PPM Key Vendors:
l
Anue, TEOCO Other $75,000 $75,000 $0
status. Budget code valid until end of
September.
Target Market(s): Initial New Orleans, then all. Totals $338,739 $412,412 $73,673
Date MilestoneDummy
if any Milestone Height Define Analyze Design Build
SDLC Phase:
3/24/11 Project Start0- 3/24/11
Project Start10- 3/24/11 Test Trial Launch Stabilize
2/1/11 Portfolio Gate
0 - 2/01/11
Portfolio Gate
8 - 2/01/11
3/17/11 Align Gate -03/17/11
Align Gate -63/17/11 Tech Gate: Portfolio Alignment Launch Closeout
9/10/12 Launch - 9/10/12
0 Launch - 9/10/12
4
9/18/13 Project End 0- 9/18/13
Project End 2- 9/18/13 Entry Portfolio Align Launch Close
105 Curre nt Comple te d 105
PROJECT: Long Distance Cost Optimization (LDCO) PPM Number(s): 0 Report as of: 5/31/13
Risks or Issues
Type Description Priority Owner Impact Date
Risk OKC storms may cause launch delay Low Daniel Paine 33
0
0
0
0
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
0
0
8
0
0
0
Engineering Quality & Controls Tech Operations 0
0
0
0
0
0
106
PROJECT: Advanced Analytics Platform PPM Number(s): 34452 Report as of: 6/3/13
Current
Brief Description (scope) Advanced Analytics Platform Customer
Satisfaction J
Overall Project Status: Category: Customer Exp & Mktg Remaining
YTD Financials Actuals Budget
Schedule On target. Spend
l
CAM: N/A
Project Manager: Jeff Whisnant Non Labor Opex $0 $0 $0
Business Owner: Scott Radcliffe Capex Softw are $780,000 $827,400 $47,400
Scope On target.
l
Technology Ow ner: Spencer Taft Capex Hardw are $191,941 $180,000 ($11,941)
l
Oracle Other $0 $0 $0
Risks or Issues
Type Description Priority Owner Impact Date
Risk Schedule risk due to resource constraints and project unknow ns. Working closely w ith Infrastructure, Storage and partners. High Jeff Whisnant ##
0
0
0
0
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
0
0
20
0
0
0
Engineering Quality & Controls Tech Operations 0
0
0
0
0
0
108
PROJECT: Cross MSO WiFi PPM Number(s): 33121 Report as of: 5/31/13
The goal of this project is to provide our CHSI customers access to Internet Service Current
Brief Description (scope) outside of their home markets on a large array of WiFi access points deployed by
several MSOs.
Customer
Satisfaction J
Overall Project Status: Category: Product Remaining
YTD Financials Actuals Budget
Schedule CVC target production date of 5/1 for UAT Spend
l
CAM: Mike Emry
may be late by a day because of issues
w ithin environment and the portal code. Project Manager: Joseph Scially, Mike R. Non Labor Opex $3,650 $3,650 $0
l
Technology Ow ner: Matt Hayes Capex Hardw are $0 $1,866 $1,866
l
Other $0 $0 $0
N. Virginia, Connecticut,
Target Market(s):
Partner markets
Totals $36,698 $226,224 $189,526
Date MilestoneDummy
if any MilestoneHeight Define Analyze Design Build
SDLC Phase:
12/1/11 Project Start0- 12/01/11
Project Start10- 12/01/11 Test Trial Launch Stabilize
8/30/12 Portfolio Gate
0 - 8/30/12
Portfolio Gate
8 - 8/30/12
1/31/13 Align Gate -01/31/13
Align Gate -61/31/13 Tech Gate: Portfolio Alignment Launch Closeout
5/28/13 Launch - 5/28/13
0 Launch - 5/28/13
4
11/21/13 Project End 0- 11/21/13
Project End 2- 11/21/13 Entry Portfolio Align Launch Close
109 Curre nt Comple te d 109
PROJECT: Cross MSO WiFi PPM Number(s): 0 Report as of: 5/31/13
Risks or Issues
Type Description Priority Owner Impact Date
0
0
0
0
0
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
AAA server integration w ith other MSOs VPN Connectivity betw een cable partners 0
Devleopment of Portal landing page 0
EBI integration w ith Cablelabs Wireless Service Locator (WSL)
0
0
0
0
Engineering Quality & Controls Tech Operations 0
Determine if a Release Program is necessary - Release The details surrounding support of customers and hand-off
0
Management to MSO partners w hen issues arise.
Test Strategy 0
0
0
0
110
PROJECT: Recommendation Engine 1.1 & 2.0 PPM Number(s): 33760 Report as of: 5/29/13
K
Expectation is to collapse schedule
Brief Description (scope) recommendations on companion devices and extending consumption history and Customer
into September launch.
metadata collection on entire netw ork of Set Top Boxes & non trio endpoints Satisfaction
l
CAM: Elizabeth Coffey
planning, schedule is pushing into a late
October QA complete (launch to follow ) Project Manager: Ben Shugart Non Labor Opex $0 $48,271 $48,271
Business Owner: Charles Scarborough Capex Softw are $18,847 $461,840 $442,993
Scope Removed Rovi Consumption from RE 2.0
l
Technology Ow ner: Elizabeth Coffey Capex Hardw are $10,756 $264,956 $254,200
scope, but CR pending to include Rovi
customers' PVE learn actions in scope for Converged Services, Video Employee Labor $242,110 $589,763 $347,653
Key Partners:
mid-August delivery Ops
Contractor Labor $1,441,019 $3,274,927 $1,833,908
Cisco, ThinkAnalytics,
Budget Key Vendors:
l
Cognizant Other $0 $0 $0
Risks or Issues
Type Description Priority Owner Impact Date
Issue Frequent scope churn causing delays in ability commit to a set of detailed requirements and schedule. High Ben Shugart 5/3/2013 ##
Issue ThinkAnalytics' dedicated, onsite development environment delayed. Could delay development for RE 2.0 Web Services. High Mat Thom 5/24/2013 ##
0
0
0
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
1. Close revised requirements analysis based on scope 1. Close revised solution segmentation document 0
changes distributed by Charles Scarborough on 4/09 and 0
replan.
6
17
3
9
Engineering Quality & Controls Tech Operations 0
0
0
0
0
0
112
PROJECT: Unified Communications CB Voicemail PPM Number(s): 32806 Report as of: 5/31/13
Current
K
Upgrade the current Movius Voice Mail Platf orm to Acision Unified Communications Not yet deployed to Cox business
Brief Description (scope) Customer
SP08 platform, migration of Cox business customers by end of 2012. customers.
Satisfaction
l
CAM: Venetta Bridges
planned migration schedule.
Samson Tong/J
Project Manager: Non Labor Opex $8 $0 ($8)
Freeman
Business Owner: Jeff Adelmann Capex Softw are $0 $0 $0
Scope Direct dial pager support is exclusion.
l
Technology Ow ner: Rob Yeary Capex Hardw are $0 $0 $0
Initial launch w ill not include automated
Fax-to-Email and Voice-to-Text. Employee Labor $125,697 $72,803 ($52,894)
Key Partners: VM Operations
Contractor Labor $101,741 $69,000 ($32,741)
Budget Financials are through February 2013. Key Vendors: Acision, HP, EMC
l
Other $717 $0 ($717)
Date MilestoneDummy
if any Milestone Height Define Analyze Design Build
SDLC Phase:
1/1/11 Project Start0- 1/01/11
Project Start10- 1/01/11 Test Trial Launch Stabilize
2/25/11 Portfolio Gate
0 - 2/25/11
Portfolio Gate
8 - 2/25/11
8/10/11 Align Gate -08/10/11
Align Gate -68/10/11 Tech Gate: Portfolio Alignment Launch Closeout
6/12/13 Launch - 6/12/13
0 Launch - 6/12/13
4
12/1/13 Project End 0- 12/01/13
Project End 2- 12/01/13 Entry Portfolio Align Launch Close
113 Curre nt Comple te d 113
PROJECT: Unified Communications CB Voicemail PPM Number(s): 0 Report as of: 5/31/13
Risks or Issues
Type Description Priority Owner Impact Date
Issue Start of QA pending prioritization for QA environment and PVE resources. High BRR 7/8/2013 72
Risk Platform Stability w ork can negatively impact SME resources for CB Migration schedules. Supllemental contractor funding. High Team 7/8/2013 ##
Risk Financial support commitment for Movius during 2014 (pending migration to Acision). Medium Cox Business 12/31/2013 83
0
0
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
MyAccount, Vision Voice, Edge ICOMS, Service Broker, Vision Tool, PAWS Acision Architecture, Enterprise Storage 0
0
0
27
22
0
Engineering Quality & Controls Tech Operations 0
Voicemail Engineering, Enterprise Storage, Acision/HP QA, Perf ormance Testing VoiceMail Operations, Enterprise Storage
0
0
0
0
0
114
PROJECT: Cox Business IP-VPN PPM Number(s): 32804 Report as of: 5/31/13
Launch new Cox Business Netw orking Service, IP-VPN, leveraging the Alcatel-Lucent Current
Brief Description (scope) MPLS platform. Standardized design, implementation and operational processes are
required.
Customer
Satisfaction J
Overall Project Status: Category: Product Remaining
YTD Financials Actuals Budget
Schedule Launch date pushed out due to Spend
l
CAM: Venetta Bridges
introduction of additional testing (E2E)
during trial phase Project Manager: Ira Ralph Non Labor Opex $0 $0 $0
l
Technology Ow ner: Guy McCormick Capex Hardw are $0 $500,000 $500,000
OSS, BSS, TechOps, TQC,
Employee Labor $105,948 $601,574 $495,626
Key Partners: BBR, CB-Product, CB-
Product Ops Contractor Labor $107,405 $320,906 $213,501
Budget Key Vendors: IBM, ALU, Jabian
l
Other $6,043 $15,000 $8,957
Target Market(s): Trial Markets: LV and OKC Totals $219,396 $1,437,480 $1,218,084
Date MilestoneDummy
if any Milestone Height Define Analyze Design Build
SDLC Phase:
2/1/11 Project Start0- 2/01/11
Project Start10- 2/01/11 Test Trial Launch Stabilize
9/30/12 Portfolio Gate
0 - 9/30/12
Portfolio Gate
8 - 9/30/12
2/1/11 Align Gate -02/01/11
Align Gate -62/01/11 Tech Gate: Portfolio Alignment Launch Closeout
6/6/13 Launch - 6/06/13
0 Launch - 6/06/13
4
12/4/13 Project End 0- 12/04/13
Project End 2- 12/04/13 Entry Portfolio Align Launch Close
115 Curre nt Comple te d 115
PROJECT: Cox Business IP-VPN PPM Number(s): 0 Report as of: 5/31/13
Risks or Issues
Type Description Priority Owner Impact Date
Risk Use of the same 3rd Party vendor for Portal and data collection;implemented as part of IP-VPN Portal Project Medium Ira Ralph ##
0
0
0
0
0
0
0
0
0
Functional Dependencies 9
11
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 3
0
0
17
21
0
0
Engineering Quality & Controls Tech Operations 0
0
0
0
0
0
116
PROJECT: CB Ethernet Performance Mgt Reporting PPM Number(s): 32805 Report as of: 5/31/13
K
To provide Cox business customers access to the performance metrics on circuits that
Brief Description (scope) Customer to move to bridge solution but not
they lease from Cox.
Satisfaction overall satisfied w ith the progress
l
CAM: Venetta Bridges
Yellow due to impacts outlined in "At Risk"
PRC update Project Manager: Ira Ralph Non Labor Opex $1,048 $0 ($1,048)
l
Technology Ow ner: Josh Nelson Capex Hardw are $0 $5,000 $5,000
Yellow due to impacts outlined in "At Risk" Tech Ops, Enterprise
PRC update Employee Labor $88,703 $386,044 $297,341
Key Partners: Engineering, Field
Engineering, CB-Product Contractor Labor $101,209 $254,750 $153,541
Local Backhaul Netw orks,
Budget 5/7/13: Budget changed from Green to Key Vendors:
l
ALU, Accedian Other $60,193 $212,900 $152,707
Yellow due to impacts outlined in "At Risk"
PRC update First (OKC, AR, LA, VA &
Target Market(s): AZ) markets; All markets to Totals $251,153 $858,694 $607,541
follow
Date MilestoneDummy
if any Milestone Height Define Analyze Design Build
SDLC Phase:
6/29/09 Project Start0- 6/29/09
Project Start10- 6/29/09 Test Trial Launch Stabilize
2/24/10 Portfolio Gate
0 - 2/24/10
Portfolio Gate
8 - 2/24/10
8/9/12 Align Gate -08/09/12
Align Gate -68/09/12 Tech Gate: Portfolio Alignment Launch Closeout
2/8/13 Launch - 2/08/13
0 Launch - 2/08/13
4
12/30/13 Project End 0- 12/30/13
Project End 2- 12/30/13 Entry Portfolio Align Launch Close
117 Curre nt Comple te d 117
PROJECT: CB Ethernet Performance Mgt Reporting PPM Number(s): 0 Report as of: 5/31/13
Risks or Issues
Type Description Priority Owner Impact Date
Issue TechOps contractors currently serve as EPMR solution ow ners funded via the project; need to ensure funding post Warranty High Vernon Walker ##
Risk Long term sustainability and ability to ramp service offering to additional customers w /out B/OSS integration/automation Medium Becky Snape ##
Risk Interim, manual reports until portal development complete Medium Vernon Walker 57
Issue Business requirements for the content of the monthly EPMR report for AT&T have not been w ell defined. High Vernon Walker ##
Risk CB Product management resource backfill High Brian Rose 39
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
n/a; hosted 3rd party solution 0
0
6
6
0
0
Engineering Quality & Controls Tech Operations 0
Device Configurations Design & Test is Complete n/a for QA Org Support Escalation Model defined;communication in progress
0
Configuration Guide is Published Technology Admin Testing is Complete Process to exclude maintenance events – in progress
OSS Requirements for Device Configuration Guide is HA Testing in OKC is complete Manual discrepancy reporting to ensure netw ork data 0
Open/In Progress User Acceptance Testing in Field in Progress integrity across NMS/OSS/BSS – in Progress 0
P6 QA Lab set up (for future testing) complete
0
0
118
PROJECT: Aurora Phase 2.0 PPM Number(s): 34056 Report as of: 5/31/13
Aurora’s focus is providing trusted netw ork data to Tech staf f via existing OSS tools. Current
Brief Description (scope) Phase 2 adds on automated OSS capabilities (Netw ork Discovery & Reconciliation) to
deliver netw ork & topology data. This supports later enhancements to monitoring tools.
Customer
Satisfaction J
Overall Project Status: Category: Enabling Platforms Remaining
YTD Financials Actuals Budget
Schedule Spend
l
CAM: N/A
Project Manager: Taz Lake, Becky Snape Non Labor Opex $0 $8,000 $8,000
l
Technology Ow ner: Mark Kaish Capex Hardw are $0 $0 $0
l
Other $0 $63,000 $63,000
Date MilestoneDummy
if any MilestoneHeight Define Analyze Design Build
SDLC Phase:
11/1/12 Project Start0- 11/01/12
Project Start10- 11/01/12 Test Trial Launch Stabilize
1/31/13 Portfolio Gate
0 - 1/31/13
Portfolio Gate
8 - 1/31/13
7/14/13 Align Gate -07/14/13
Align Gate -67/14/13 Tech Gate: Portfolio Alignment Launch Closeout
Risks or Issues
Type Description Priority Owner Impact Date
Risk Aggressive schedule to complete business requirements and consolidate estimates for Analysis and Design Medium Becky Snape 1/31/2013 ##
0
0
0
0
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
0
0
0
0
0
0
Engineering Quality & Controls Tech Operations 0
0
0
0
0
0
120
PROJECT: Cox Verizon Program PPM Number(s): 34724-34728 (5 ind. numbers) Report as of: 5/31/13
Verizon Cox Venture to offer integration of Verizon Wireless subscribers w ith their Current
Brief Description (scope) home broadband, TV and phone services. Technologies Program Management of 4
Workstreams: (1) CCS (2) IIR (3) Reconciliation/Bounty (4) JMC Hub
Customer
Satisfaction J
Overall Project Status: Category: Product Remaining
YTD Financials Actuals Budget
Schedule (1) CCS - On Target (2) IIR: EBI - On Spend
l
CAM: Elizabeth Coffey
Target (3) IIR: BSS - On Target
(4) Recon/Bounty - On Target Project Manager: Alison Millsaps Non Labor Opex $0 $0 $0
(5) JMC Hub - On Target
Business Owner: Judy Train Capex Softw are $0 $0 $0
Scope (1) CCS - On Target (2) IIR: EBI - On
l
Technology Ow ner: Johannes Eckert Capex Hardw are $0 $0 $0
Target (3) IIR: BSS - On Target
(4) Recon/Bounty - On Target Employee Labor $359,066 $1,350,510 $991,444
Key Partners: Verizon
(5) JMC Hub - On Target
Contractor Labor $701,876 $3,506,105 $2,804,229
Budget On Target Key Vendors: Accenture and Cognizant
l
Other $0 $0 $0
Risks or Issues
Type Description Priority Owner Impact Date
Issue IIR-Contract amendment needed for official Pilot Launch date. Medium Michelle McCoy 61
Risk All-Long-Term Roadmap: BIC not yet defined. CCS, IIR, JMC Hub not defined w ith VZW. Medium Susan Brow n 83
Issue Service code mapping w /in CNS must be updated to ensure Order Processed emails include timeslot information. High A. Millsaps ##
0
0
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
0
0
0
0
0
0
Engineering Quality & Controls Tech Operations 0
0
0
0
0
0
122
PROJECT: FS Mobile Device Strategy - Tech Enablement PPM Number(s): 32827 Report as of: 5/31/13
Define and implement a new mobile solution for CCI Field Technicians, replacing existing Current Delay in architecture specification
Brief Description (scope) iWerks and TOA platforms Customer
Satisfaction K has caused signif icant delay in
project schedule
l
CAM: Al Briggs
Mike Ramsey (IT);
Project Manager: Non Labor Opex $0 $0 $0
Aaron Ripley (Field
Business Owner: Mike Horton Capex Softw are $0 $0 $0
Scope No know n issues
l
Technology Ow ner: Todd Dean / Stephan Els Capex Hardw are $0 $0 $0
Employee Labor $0 $0 $0
Key Partners: BSS/OSS App Dev
Contractor Labor $2,470,792 $3,720,997 $1,250,205
Budget No know n issues Key Vendors: TOA
l
Other $0 $0 $0
Date MilestoneDummy
if any MilestoneHeight Define Analyze Design Build
SDLC Phase:
12/1/11 Project Start0- 12/01/11
Project Start10- 12/01/11 Test Trial Launch Stabilize
3/8/12 Portfolio Gate
0 - 3/08/12
Portfolio Gate
8 - 3/08/12
12/20/12 Align Gate -012/20/12
Align Gate -612/20/12 Tech Gate: Portfolio Alignment Launch Closeout
8/19/13 Launch - 8/19/13
0 Launch - 8/19/13
4
12/31/13 Project End 0- 12/31/13
Project End 2- 12/31/13 Entry Portfolio Align Launch Close
123 Curre nt Comple te d 123
PROJECT: FS Mobile Device Strategy - Tech Enablement PPM Number(s): 0 Report as of: 5/31/13
Risks or Issues
Type Description Priority Owner Impact Date
Risk Technical Operations must operationalize a new technology to Cox IT (XML Gatew ay) as the Security appliance. Medium Tech Ops (Rich Schumann) 8/16/2013 ##
Issue Delays w ith XML Gatew ay vendor contractual negotiations have the ability to delay timelines if they persist. Medium Supply Chain 5/31/2013 ##
Risk Need to determine ongoing Contractor Support (Who do they call for help, how w ill they be trained, etc?) Low Field Services 8/16/2013 ##
Risk Need to determine if / how MobileIron can be utilized for Contractors Low Tech Ops 8/16/2013 69
Issue Looking at enterprise solution to balance accounts in ICOMS. Previous strategy does not have corporate IT approval. Medium FS Mobility 8/16/2013 ##
0
0
0
0
0
Functional Dependencies 15
3
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 3
4
0
0
0
0
0
Engineering Quality & Controls Tech Operations 0
0
0
0
0
0
124
PROJECT: IBN PPM Number(s): 33522 Report as of: 5/31/13
Current
J
Sustain & Enhance the messaging platform throughout the year to support Advisory Working w ith all stakeholders to
Brief Description (scope) Customer
Board approved notifications for 2013. def ine 2013 platform roadmap.
Satisfaction
l
CAM: Kevin Nichols
Project Manager: Kimberly Ford Non Labor Opex $0 $0 $0
l
Technology Ow ner: Bryan Edney Capex Hardw are $0 $0 $0
enhancements and new use cases as
needed in 2013. BRR; OSS-Dev; Eng; Tech Employee Labor $14,899 $80,000 $65,101
Key Partners:
Ops; Prod Strategy
Contractor Labor $30,418 $0 ($30,418)
Budget Approved Budget = $80K rollover + Key Vendors: Front Porch
l
Other $0 $0 $0
$420K driver (use case level approval w ill
be required to secure funding from the
'driver' bucket) = $500K Target Market(s): All Totals $45,317 $80,000 $34,683
Risks or Issues
Type Description Priority Owner Impact Date
Risk Visibility Services Platform Stabilization: 1) Grow th Deployments 2) Legacy Replacements 3) Grooming Deployments Medium Engineering/Procera 6/30/2013 ##
- 2013 VS hardw are agreement reached and PO submitted as temporary risk mitigation strategy. 92
Risk Anue/Ixia port license pricing agreement and M&S agreement renew als are pending. Medium Supply Chain 5/31/2013 80
0
0
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
PM; BA IBN - Lead Developer BSS Architecture 0
CNS - Lead Developer OSS Architecture 0
26
19
13
16
Engineering Quality & Controls Tech Operations 16
Solution Engineer Lead Tester IBN Operations
3
Sustaining Engineering CNS Operations
0
0
0
0
126
PROJECT: PCI Compliance 2.0 Remediation PPM Number(s): 33761 Report as of: 5/29/13
Current
J
This program consists of 13 w ork streams required for CCI to become compliant w ith
Brief Description (scope) Customer
the new PCI DSS v2.0 standard.
Satisfaction
l
CAM: none
Project Manager: Rob Isaac Non Labor Opex $1,693 $145,463 $143,770
l
Technology Ow ner: Phil Agcaoili Capex Hardw are $133,611 $1,400,000 $1,266,389
time.
Ernst & Young, Saf eNet, Employee Labor $278,656 $213,338 ($65,318)
Key Partners:
NetCracker, Stach & Liu
Contractor Labor $1,894,836 $5,775,743 $3,880,907
Budget Budget estimates to complete being Key Vendors: Palo Alto
l
Other $7,935 $218,888 $210,953
managed.
Risks or Issues
Type Description Priority Owner Impact Date
Risk 4.1 SZ - Need to find a solution around securing/managing all Lit hold files. Low Russell E. 10/25/2013 77
Issue 2.3 CCDDR - Last access timestamps for files are being updated on select servers. Medium Michael Deal 6/30/2013 81
Issue 2.3 CCDDR - Scanning of databases does not scan all row s w ithin the database. Medium Michael Deal 6/30/2013 77
Risk 4.1 SZ – Possible resource constraint on availability of ICOMS QA testers Low Tim Campbell 5/31/2013 73
Risk 3.1 WRDP – AP installation costs validation High James LeMaster 5/20/2013 43
Risk 3.7 Security Monitoring - Window s Server 2003 machines w ithin the CDE are not presently forw arding their OS logs High Zachary Julian 6/28/2013 ##
Risk 4.1 SZ – IVR system is processing CC data and is not segmented from rest of netw ork Medium Tim Campbell 10/31/2013 83
Risk 4.1 SZ – Kerberos authentication for detokenization process not in place for RWS and ICOMS GUI High Tim Campbell 6/30/2013 94
Risk 3.7 Security Monitoring – RWS application log format needed for ArcSight High Joe Binkow ski 6/30/2013 72
Risk 2.3 CCDDR - All DLP scanning has stopped & all ECRs cancelled per National CCB leadership High Michael Deal 6/5/2013 89
Functional Dependencies 4
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
• John Olmstead for BSS intake. • Rod Echols idientified as a point of contact for 0
• Mark Patsy for BSS design and build. Architecture review 0
6
0
0
0
Engineering Quality & Controls Tech Operations 0
• Engineering w ill not be involved for Secure Zone. • We are w orking w ith Diego Ballesteros & Erica Turner as • Steve Williams & Scott Tanke for Security Operations.
0
our contact for Tech QA. • Scott Smith & Tim Cotter from Technology Operations.
• Emily Buffington 0
0
0
0
128
PROJECT: STAR 2013 PPM Number(s): 35137 Report as of: 5/30/13
l
CAM: Scott Nelson
delivery.
Project Manager: Erin Greene Non Labor Opex $0 $0 $0
l
Technology Ow ner: Lional Tamez Capex Hardw are $0 $0 $0
standardizations, the Eloquent Solution,
and Call Virtualization. Sales, Field Services, Employee Labor $19,172 $132,200 $113,028
Key Partners:
Customer Care
Contractor Labor $82,970 $581,100 $498,130
Budget Budget codes for 2013 enhancements Key Vendors: Accenture, Cognizant
l
Other $0 $0 $0
have been delivered. Items are being
reclassed from the 2012 code to the new
code. Target Market(s): All Markets Totals $102,142 $713,300 $611,158
Risks or Issues
Type Description Priority Owner Impact Date
Issue Hierarchy History Reporting - Solution failed in UAT. Fix is in development. Medium EBI 76
Issue Current Hierarchy Logic - Incorrect hierarchy logic is being used in STAR OBIEE reports. Fix is in development. High EBI ##
Risk App Dev bandw idth limitations may impact ability to deliver Q2 w ork streams. Medium App Dev 7/1/2013 76
Risk Call Virtualization - Design w ill not be completed until the end of June. The impact on the 1/1/2014 deliver date is not determined.
Medium App Dev 1/1/2014 ##
Risk Eloquent Solution - Currently established SLAs may not be met due to additional processing time. High App Dev, EBI 9/1/2013 96
Risk Eloquent Solution - ICOMS and EDW historical data w ill be misaligned for w ork orders created prior to USID. Low EBI 10/1/2013 ##
Issue QA Environment preparation is delayed due to resource constraints and w ill impact QA resource availability High ICOMS, QA 6/1/2013 ##
0
0
0
Functional Dependencies 10
3
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
0
0
0
0
0
0
Engineering Quality & Controls Tech Operations 0
0
0
0
0
0
130
PROJECT: Target State Web PPM Number(s): 34719 34720 34721 34868 Report as of: 5/31/13
This program w ill develop a Target State Web experience for Cox customers allow ing Current
Brief Description (scope) for easier interaction across channels, create consistent and relevant experiences,
and increase a customer’s overall enjoyment of Cox product / services.
Customer
Satisfaction J
Overall Project Status: Category: Products Remaining
YTD Financials Actuals Budget
Schedule Release 1.0 - On Track Spend
l
CAM: Elizabeth Coffey
Release 1.1 - On Track
Release 2.0 - On Track Project Manager: Ben Samuel Non Labor Opex $0 $0 $0
Release 3.0 - On Track
Business Owner: Lewis Simons Capex Softw are $0 $0 $0
Scope Q2 - Planned
l
Technology Ow ner: Johannes Eckert Capex Hardw are $0 $0 $0
Q3 - Planned, New Items Being Added
Q4 - Currently in Release Planning Employee Labor $453,010 $6,425,947 $5,972,937
Key Partners:
Contractor Labor $3,154,921 $8,774,053 $5,619,132
Slalom Consulting,
Budget TSW Core - $2,630,279.86 Key Vendors:
l
Cognizant, Accenture Other $0 $0 $0
Order and Fulfillment - $5,070,446.09
Sales and Marketing - $1,806,287.88
Self Service - $5,692,992.54 Target Market(s): All Totals $3,607,931 $15,200,000 $11,592,069
Risks or Issues
Type Description Priority Owner Impact Date
Issue UXD Vision - Determining strategic direction based on solution options being defined by Technology. High Elizabeth C 99
Risk Cox Rebranding Efforts - Rebranding may have a significant impact on scope and team; Dates for potential rebranding being determined.
Low Elizabeth C ##
Issue Enhanced Shop - Complete Market Launch Delay from 5/23 to 5/30 High Elizabeth C 62
0
0
0
0
0
0
0
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
0
0
0
0
0
0
Engineering Quality & Controls Tech Operations 0
0
0
0
0
0
132
PROJECT: Visibility Services (PNI-VA) PPM Number(s): 34756 Report as of: 5/31/13
1) KTLO & Grow th - Platform remains aligned w / current BB and Netw ork capacity
Current
K
grow th activities. HW perf & acquisition issues
Brief Description (scope) Customer
2) Platform Legacy Replacements - HW standardization (CNs; SNs & DBs) w ill optimize impacting program commitments
Satisfaction
operational activities and Product Strategy netw ork/service/device trends.
Overall Project Status: Category: Infrastructure Remaining
YTD Financials Actuals Budget
Schedule Very Aggressive. Q2-Q4 2013 proposed Spend
l
CAM: Kevin Nichols
schedule complete. RDC sign-offs in
progress. Project Manager: Kimberly Ford Non Labor Opex $0 $0 $0
2012 - stabilization activities continue in
Business Owner: Guy McCormick Capex Softw are $0 $0 $0
Scope Scope changed w eek of 2/04 to include
l
Technology Ow ner: Guy McCormick Capex Hardw are $0 $7,300,000 $7,300,000
new 8820 grooming activities. Cross
functional acceptance/alignment BRR; Sust. Eng.; SecOps; Employee Labor $0 $0 $0
Key Partners:
achieved. Product Strategy; NT-EMO
Contractor Labor $0 $0 $0
Procera, Anue, Interface
Budget $7.3M requested & approved. Key Vendors:
l
Masters Other $4,900,000 $0 ($4,900,000)
2013 VS Program funded from tw o
separate PPM profiles (#33208 &
#34756). Target Market(s): All Totals $4,900,000 $7,300,000 $2,400,000
Risks or Issues
Type Description Priority Owner Impact Date
Issue Platform continues to encounter hardw are/softw are issues preventing Ops/Eng from stabilizing the platform. Low Procera 1/1/2013 ##
Issue Platform hardw are scalability concerns/issues raised to Cox & Vendor executive leadership for mitigation/resolution. High Cox/Procera 1/31/2013 ##
Issue Macon and Phoenix are hot and Procera deployments in this market should be managed quickly. High BB Capacity 3/31/2013 91
Risk New deployment schedule w ill be even more aggressive than the first pass. Medium Team 6/30/2013 73
Closed - Finance team confirmed that the VS Program is being f unding across tw o (2) separate PPM profiles (#34756 & #33208). Total approved budget
Finance
= $7.3M ##
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
N/A N/A Strategic Architecture 0
0
29
29
34
34
Engineering Quality & Controls Tech Operations 20
Sustaining Engineering N/A Security Operations
27
Security Engineering NOC
26
0
0
0
134
PROJECT: Split Signal 2013 PPM Number(s): 32881 Report as of: 5/30/13
Initiative to expand projects started in Phoenix and San Diego to enable split broadcast Current
Brief Description (scope) signals sent out by key partner netw orks in 5 additional markets (Las Vegas, Hampton
Roads, Oklahoma City, Providence, New Orleans).
Customer
Satisfaction J
Overall Project Status: Category: Customer Experience Remaining
YTD Financials Actuals Budget
Schedule This project is continued in 2012 and Spend
l
CAM: Scott Nelson
each field w ill have each ow n schedule
of launches. Schedule getting behind on Project Manager: Noel Opitz Non Labor Opex $63,171 $90,513 $27,342
signing contracts
Business Owner: Mark Greatrex Capex Softw are $0 $0 $0
Scope Adding equipment in the each market
l
Technology Ow ner: Johannes Eckert Capex Hardw are $1,451,819 $4,267,777 $2,815,958
station to split the signal betw een Cox
customers and Non-Cox customers for Employee Labor $2,203 $17,510 $15,307
Key Partners: Broadcasting stations
marketing and advertising purpose.
Contractor Labor $177,870 $181,120 $3,250
Budget We are w ithin the budget but need to re Key Vendors: Mega Hertz, Vernick
l
Other $0 $0 $0
evaluate forecasting 2013 w ith
anticipated spend on equipment based on Tucson, SAN, OKC, BTR,
the contracts that are signed Target Market(s):
Providence, HRD, LAS
Totals $1,695,063 $4,556,920 $2,861,857
Date MilestoneDummy
if any Milestone Height Define Analyze Design Build
SDLC Phase:
9/22/11 Project Start0- 9/22/11
Project Start10- 9/22/11 Test Trial Launch Stabilize
9/28/12 Portfolio Gate
0 - 9/28/12
Portfolio Gate
8 - 9/28/12
9/22/11 Align Gate -09/22/11
Align Gate -69/22/11 Tech Gate: Portfolio Alignment Launch Closeout
3/8/12 Launch - 3/08/12
0 Launch - 3/08/12
4
1/19/14 Project End 0- 1/19/14
Project End 2- 1/19/14 Entry Portfolio Align Launch Close
135 Curre nt Comple te d 135
PROJECT: Split Signal 2013 PPM Number(s): 0 Report as of: 5/30/13
Risks or Issues
Type Description Priority Owner Impact Date
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
0
0
0
0
0
0
Engineering Quality & Controls Tech Operations 0
Escalated issues to ATL engineering. James Keslso's team
0
for assistance- in December.
0
0
0
0
136
PROJECT: Sales Analytics PPM Number(s): 32909 Report as of: 5/30/13
Overview : Sales Channel Reporting provides the foundational data that enables Current
Brief Description (scope) leadership to quickly analyze and modify channel-specific decisions dow n to the
representative level.
Customer
Satisfaction J
Overall Project Status: Category: Customer Experience Remaining
YTD Financials Actuals Budget
Schedule April deployment activities on schedule. Spend
l
CAM: Scott Nelson
Interim Solution history loads in progress.
July release technical requirements in Project Manager: David Lawrence Non Labor Opex $0 $0 $0
progress
Business Owner: Dot Stith Capex Softw are $0 $0 $0
Scope Phased quarterly w ork into monthly
l
Technology Ow ner: Lionel Tamez Capex Hardw are $0 $0 $0
releases. May release includes Video Sell
In, Close rate, Edit to "per call" metrics, Employee Labor $122,919 $315,763 $192,844
Key Partners: Sheila Hicks
and removal of ETC A7
Contractor Labor $2,970,360 $3,510,275 $539,915
Budget Proposed budget through Jul 2014 w as Key Vendors: Cognizant
l
Other $0 $0 $0
approved at 2/14 PRC Milestone review .
Sales and Market
Target Market(s):
Leadership
Totals $3,093,279 $3,826,038 $732,759
Date MilestoneDummy
if any MilestoneHeight Define Analyze Design Build
SDLC Phase:
12/1/11 Project Start0- 12/01/11
Project Start10- 12/01/11 Test Trial Launch Stabilize
5/17/12 Portfolio Gate
0 - 5/17/12
Portfolio Gate
8 - 5/17/12
5/17/12 Align Gate -05/17/12
Align Gate -65/17/12 Tech Gate: Portfolio Alignment Launch Closeout
3/1/12 Launch - 3/01/12
0 Launch - 3/01/12
4
1/31/14 Project End 0- 1/31/14
Project End 2- 1/31/14 Entry Portfolio Align Launch Close
137 Curre nt Comple te d 137
PROJECT: Sales Analytics PPM Number(s): 0 Report as of: 5/30/13
Risks or Issues
Type Description Priority Owner Impact Date
Risk Maintaining alignment w ith business on prioritization and timing of key initiatives Medium Sales Operations, BRR 83
Issue Current net revenue definition in reporting is utilizing data that counts some package discounts tw ice, leading to an underreporting
High
of net revenue
Sales
by an
Operations
estimated 2% ##
0
0
0
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
0
0
5
5
14
18
Engineering Quality & Controls Tech Operations 35
0
0
0
0
0
138
PROJECT: VoD Transformation PPM Number(s): 33098 Report as of: 5/31/13
The VoD Transformation program comprises tracks to allow VoD assets to be Current
K
Weekly calls w ith Louisiana on hold
Brief Description (scope) streamed through Legacy Trio/Rovi STBs, customers' iPads and other devices via PVE Customer
until September.
(Cox TV Connect), and TiVo (managed as a separate project). Satisfaction
l
CAM: Alyse Minsky
assets, and stream. Red: against dates
from PRC in February, w hich have since Project Manager: Ashley Bowling Non Labor Opex $58,298 $412,000 $353,702
been recast.
Business Owner: Jay Langa Capex Softw are $1,942,901 $2,624,064 $681,163
Scope
l
Technology Ow ner: Louise Wasilewski Capex Hardw are $243,454 $333,400 $89,946
l
Concurrent, Netcracker Other $17,650 $0 ($17,650)
PVE prioritization and push out Legacy
deployment
Target Market(s): All (STBs), Global (PVE) Totals $3,594,186 $9,646,844 $6,052,658
Risks or Issues
Type Description Priority Owner Impact Date
Issue For a pre-trial in multiple sites, w ould need to finish product rules and provisioning interfaces 3 w eeks early. (PVE 509) Medium Kashif Choudry ##
Issue What fields w ill be supported in Adrenalin and exposed to CDWH (PPM 34412) Medium Ray Killick 74
Issue Rate at w hich Adrenalin accepts provisioning messages may not be sufficient to sustain standard operations. (35207) Low Jeff Miller ##
Issue Client launch sequencing. Reprioritizing PVE over Legacy STBs. (34139) Low Jay Langa 70
Issue AssetFlow code quality is less than desirable (35209) Medium Carissa McCann 53
Issue Adrenalin code quality is less than desirable (34902) High L. Wasilew ski 53
Issue Timeline for reconciliation function w ill be after the soft launch (35344) Medium Ray Killick 74
Issue PVE Root approach entails additional w ork for Content Team (35208) Medium M. Sidahmed 66
Issue QA Lab not ready for IPv6, a prerequisite for VOD design, and required for multi-market testing. Dev lab has. (34846) Low Munsterman ##
Issue The PVE deployment Sprint of Adrenalin does not include development for dynamic folders or PVE-specific reporting. (35343) Medium L. Wasilew ski ##
Functional Dependencies 25
3
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 3
Working w ith PVE team to clarify scope, requirements, and Held a VOD Design Review Update on 4/15. Held Netw ork 4
dependencies. Design review on 4/17. 4
12
27
33
3
Engineering Quality & Controls Tech Operations 8
Def ining roles and responsibilities amongst Content, Tech
9
Ops, and Local Sites. Tech Ops, Content, and Provisioning
teams have lab access. Adrenalin training for Ops held in 28
mid-March. 0
0
0
140
PROJECT: Tech Performance Management PPM Number(s): 32828 Report as of: 5/31/13
Current
J
The purpose of this project is to create a consolidated performance management tool Customer is satisfied w ith scope,
Brief Description (scope) Customer
(e.g. tech scorecards, metrics association to technician, direction, and effort.
Satisfaction
l
CAM: Al Briggs
and re-clarifications from the Sponsor
Project Manager: Shawn Tresner (acting) Non Labor Opex $11,254 $0 ($11,254)
l
Technology Ow ner: John Hunt Capex Hardw are $0 $0 $0
Will know impact after estimate is
completed. All Field Sites Management, Employee Labor $98,830 $157,813 $58,983
Key Partners:
Care Mgt, & EBI
Contractor Labor $755,656 $1,153,502 $397,846
Budget No know n issues. Key Vendors: Cogizant
l
Other $4,488 $0 ($4,488)
Date MilestoneDummy
if any MilestoneHeight Define Analyze Design Build
SDLC Phase:
11/8/11 Project Start0- 11/08/11
Project Start10- 11/08/11 Test Trial Launch Stabilize
8/22/12 Portfolio Gate
0 - 8/22/12
Portfolio Gate
8 - 8/22/12
1/31/13 Align Gate -01/31/13
Align Gate -61/31/13 Tech Gate: Portfolio Alignment Launch Closeout
1/1/14 Launch - 1/01/14
0 Launch - 1/01/14
4
2/28/14 Project End 0- 2/28/14
Project End 2- 2/28/14 Entry Portfolio Align Launch Close
141 Curre nt Comple te d 141
PROJECT: Tech Performance Management PPM Number(s): 0 Report as of: 5/31/13
Risks or Issues
Type Description Priority Owner Impact Date
Risk Business has informed us that they are going to add metrics shortly, but they are not sure w hat they are yet. High Walter Jones ##
0
0
0
0
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
0
0
0
0
0
0
Engineering Quality & Controls Tech Operations 0
0
0
0
0
0
142
PROJECT: Usage Billing Platform PPM Number(s): 33873 Report as of: 5/31/13
The Usage Billing project scope is to complete the RBM platform configuration, ICOMS Current
K
New schedule agreed to w ith
Brief Description (scope) integration, and UAT testing in 1 market. Achieving 99% accuracy on the Data Usage Customer
Product, but risks remain.
Meter along w ith IP Tagging are prerequisites to commercial launch. Satisfaction
l
CAM: Kevin Nichols
start date on 6/4. IPDR softw are
readiness not complete until after solution Project Manager: Bill Reed Non Labor Opex $0 $0 $0
test start date
Business Owner: Philip Nutsugah Capex Softw are $0 $0 $0
Scope Multiple CRs creating unplanned w ork to
l
Technology Ow ner: Mike Emry Capex Hardw are $60,990 $1,000,000 $939,010
Release 1. Project resources for analysis
of CRs are constrained by current project BSS App Dev., Tech Ops, Employee Labor $352,998 $1,689,230 $1,336,232
Key Partners:
activities. Enterprise QA, BRR, EBI
Contractor Labor $1,224,878 $5,983,679 $4,758,801
Budget Large variance due to unexpected journal Key Vendors: NetCracker
l
Other $0 $0 $0
entries for NetCracker services.
Accounting is researching all NetCracker
entries Target Market(s): All Markets Totals $1,638,866 $8,672,909 $7,034,043
Date MilestoneDummy
if any Milestone Height Define Analyze Design Build
SDLC Phase:
6/28/12 Project Start0- 6/28/12
Project Start10- 6/28/12 Test Trial Launch Stabilize
2/8/13 Portfolio Gate
0 - 2/08/13
Portfolio Gate
8 - 2/08/13
5/23/13 Align Gate -05/23/13
Align Gate -65/23/13 Tech Gate: Portfolio Alignment Launch Closeout
11/5/13 Launch - 11/05/13
0 Launch - 11/05/13
4
3/14/14 Project End 0- 3/14/14
Project End 2- 3/14/14 Entry Portfolio Align Launch Close
143 Curre nt Comple te d 143
PROJECT: Usage Billing Platform PPM Number(s): 0 Report as of: 5/31/13
Risks or Issues
Type Description Priority Owner Impact Date
Risk IPDR vendor softw are w ill not be GA ready w hen end to end testing begins. High Lance Casey 73
Risk Funding for FTEs to support RBM/ICOMS High Mike Emry 37
Risk iBill w ill not be QA ready until mid July High Tiffany M. 41
Risk Additional scoping requested of Project Team via multiple CRs from Product. Medium Mike Emry 75
Risk Resource constraint on EBI to finish dev/int environment. EBI resources focused on usage cycle issue. High Scott Gatlin ##
Issue All RBM environments require additional disk space to accommodate new version of RBM. Medium Harold Reed 85
Issue Paper Bill w ill not be ready for QA testing until early July. Medium Lisa Gore 61
Risk UDL Testing Approach not defined. It w ill impact the budget and may impact the schedule Low Tiffany M. 87
0
0
Functional Dependencies 15
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
None For BSS, w e are dependent on the NetCracker code drops for Revised architecture design. High level is complete. 0
RBM 6.0.3, ICOMS 8.2.6, paper bill changes. For OSS, w e are 0
dependent on successful testing of the IPDR vendor platform.
4
10
0
0
Engineering Quality & Controls Tech Operations 0
QA testing of RBM/ICOMS/Paper Bill/CNS/PAWS/Internet Need additional headcount to support RBM at launch.
0
Tools/iNAV and EBI
0
0
0
0
144
PROJECT: Next Generation Comm Center PPM Number(s): 34718 Report as of: 5/31/13
The Comm Center through the use of technology, tools and enhanced skill, w ill provide
Current
J
technician and customer related support through a single point of contact to maximize
Brief Description (scope) Customer
effectiveness w hile providing value added support to optimize the Customer
Satisfaction
Experience.
Overall Project Status: Category: Customer Exp & Mktg Remaining
YTD Financials Actuals Budget
Schedule No know n issues Spend
l
CAM: Al Briggs
Project Manager: Kasey White Non Labor Opex $14,861 $60,000 $45,139
l
Technology Ow ner: Al Briggs, Floyd Alcorn Capex Hardw are $0 $0 $0
l
Other $1,615 $5,000 $3,385
Date MilestoneDummy
if any Milestone Height Define Analyze Design Build
SDLC Phase:
1/13/13 Project Start0- 1/13/13
Project Start10- 1/13/13 Test Trial Launch Stabilize
5/23/13 Portfolio Gate
0 - 5/23/13
Portfolio Gate
8 - 5/23/13
9/26/13 Align Gate -09/26/13
Align Gate -69/26/13 Tech Gate: Portfolio Alignment Launch Closeout
Risks or Issues
Type Description Priority Owner Impact Date
Risk Technology (Al/Kasey) recommended NGCC be reclassed due to likely underspend of the forecasted amount communicated atMedium
entry gate. The Business
Kasey White
(Mike Horton) objected.
5/3/2013 ##
0
0
0
0
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
iNav/CMS w ill have a functional dependency on IVR and 0
Avaya in fulfilling the tech authentication requirement. 0
15
0
0
0
Engineering Quality & Controls Tech Operations 0
0
0
0
0
0
146
PROJECT: TiVo IP Solution PPM Number(s): 32876 Report as of: 5/29/13
Current
K
This program w ill deliver traditional VOD to TiVo set tops using the new IP delivery Cox and TiVo are w orking on the
Brief Description (scope) Customer
system and a TiVo-supplied client. Master Agreement.
Satisfaction
l
CAM: Alyse Minsky
SOW's are outstanding. New scope
related to Service Composer has further Project Manager: Ryan Meisenheimer Non Labor Opex $89 $0 ($89)
delayed timeframes.
Business Owner: Steve Necessary Capex Softw are $30,000 $30,000 $0
Scope Contract draft to sw itch to an IP-based
l
Technology Ow ner: Louise Wasilewski Capex Hardw are $32,672 $30,000 ($2,672)
system is under review . Scope has
increased w ith Service Composer Employee Labor $31,936 $79,600 $47,664
Key Partners: TiVo
requirement.
Contractor Labor $48,916 $701,600 $652,684
TiVo, SeaChange, CPS
Budget Cardio funds to assess feasibility w ith Key Vendors:
l
(NDS), Microsoft Other $0 $0 $0
TiVo. Decision on TiVo's proposed
architecture w ill impact the budget. Revised from 12 metro
Target Market(s):
areas to all markets.
Totals $143,613 $841,200 $697,587
Date MilestoneDummy
if any Milestone Height Define Analyze Design Build
SDLC Phase:
7/15/10 Project Start0- 7/15/10
Project Start10- 7/15/10 Test Trial Launch Stabilize
12/6/12 Portfolio Gate
0 - 12/06/12
Portfolio Gate
8 - 12/06/12
7/18/13 Align Gate -07/18/13
Align Gate -67/18/13 Tech Gate: Portfolio Alignment Launch Closeout
1/6/14 Launch - 1/06/14
0 Launch - 1/06/14
4
3/31/14 Project End 0- 3/31/14
Project End 2- 3/31/14 Entry Portfolio Align Launch Close
147 Curre nt Comple te d 147
PROJECT: TiVo IP Solution PPM Number(s): 0 Report as of: 5/29/13
Risks or Issues
Type Description Priority Owner Impact Date
Risk TiVo master agreement (Extended negotiations) High Yousef Nijim 11/28/2012 45
Risk TiVo, SeaChange, Verimatrix, & NDS SOW's (Extended negotiations; incomplete scope) High L. Wasilew ski 11/28/2012 82
Risk Cox / NDS prioritization of w ork in relation to other key projects (VOD Transformation; PVE) High Meisenheimer 12/31/2012 92
Risk Changes to defined architecture; development of service composer High Meisenheimer 3/20/2013 64
Risk Lead engineer's contract expiring in July High L. Wasilew ski 7/1/2013 41
Risk 0
0
Risk 0
Risk 0
Risk 0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
Requirements revisions need to take into account the new Updates to the DRAFT Conceptual Architecture are in process Further engagement w ith Strategic Architecture is needed 0
UI and delivery mechanism. as it relates to a Verimatrix/HLS implementation. to explore intellectual property rights issues. 0
18
7
22
3
Engineering Quality & Controls Tech Operations 0
Working w ith NDS to prioritize w ork requests for TiVo Working w ith QA on release calendar.
0
related components.
0
0
0
0
148
PROJECT: Rovi Passport 3.7 with EBIF PPM Number(s): 32877 Report as of: 5/31/13
J
Cox is adding value to our Advanced TV services w ith a new menu for navigating approved by Product and EPM.
Brief Description (scope) Customer
betw een the various view s used to brow se, search, and customize program listings. Moving forw ard w ith QA and ORT
Satisfaction
testing
Overall Project Status: Category: Product Remaining
YTD Financials Actuals Budget
Schedule Project schedule has been revised due to Spend
l
CAM: Alyse Minsky
Trio v2.0 verification testing.
Project Manager: Tom Johnson Non Labor Opex $9,738 $217,535 $207,797
Business Owner: Kelly King Capex Softw are $133,298 $102,918 ($30,380)
Scope Whole Home VoD feature has been
l
Technology Ow ner: Eric Maender Capex Hardw are $0 $34,167 $34,167
removed. Still moving forw ard w ith EBIF Marketing, Prod Dev, Net
User Agent. Adrenalin support added. Employee Labor $103,782 $579,601 $475,819
Key Partners: Sec QA, Provisioning,
OTAC, Product Deployment Contractor Labor $157,242 $761,817 $604,575
Budget Project cost currently below Alignment Key Vendors: Rovi, SeaChange and Cisco
l
Other $35,209 $306,722 $271,513
Gate budget. Rovi schedule impact is
severe at this point. Rebudgeted and
rescheduled for Adrenalin support. Target Market(s): All Cisco Markets Totals $439,269 $2,002,760 $1,563,491
Date MilestoneDummy
if any Milestone Height Define Analyze Design Build
SDLC Phase:
8/1/11 Project Start0- 8/01/11
Project Start10- 8/01/11 Test Trial Launch Stabilize
8/11/12 Portfolio Gate
0 - 8/11/12
Portfolio Gate
8 - 8/11/12
12/15/11 Align Gate -012/15/11
Align Gate -612/15/11 Tech Gate: Portfolio Alignment Launch Closeout
9/20/13 Launch - 9/20/13
0 Launch - 9/20/13
4
6/26/14 Project End 0- 6/26/14
Project End 2- 6/26/14 Entry Portfolio Align Launch Close
149 Curre nt Comple te d 149
PROJECT: Rovi Passport 3.7 with EBIF PPM Number(s): 0 Report as of: 5/31/13
Risks or Issues
Type Description Priority Owner Impact Date
Issue DCRM issue w ill not allow recording on STBs. Rovi to address w ith hidden flag. (Issue) (High Impact) High Eric Maender 6/24/2013 ##
Issue Next test cycle for lab space scheduled in Q3 (issue) Medium Impact) Medium Eric Maender 68
Issue Bookmarking issue w ith 3.7 client code - w hen you purchase and asset bookmarking is not w orking on certain STBs High Derrick Turner ##
Risk QA test cycles could be delayed due to Q2 testing High Tom Johnson 7/3/2013 49
0
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
0
0
0
0
0
0
Engineering Quality & Controls Tech Operations 0
0
0
0
0
0
150
PROJECT: Trio 2.2 PPM Number(s): 35449 Report as of: 6/3/13
Current
J
The purposes of this Trio release are to meet federal regulations, address significant Desired key features identified.
Brief Description (scope) Customer
operational issues and improve the user experience for existing functions. Teams w orking to vet details.
Satisfaction
l
CAM: Alyse Minsky
baselined. Impacts to completion of
deliverables for Portfolio Gate. Project Manager: Cheryl Redmond Non Labor Opex $0 $20,000 $20,000
l
Technology Ow ner: Josh Nelson Capex Hardw are $0 $20,000 $20,000
cross-functional review /approval.
Marketing, Product, QA, Employee Labor $4,254 $143,500 $139,246
Key Partners:
Operations
Contractor Labor $16,170 $71,200 $55,030
Budget Budget approved through Portfolio. Key Vendors: CPS, Pandora, Music Choice
l
Other $0 $0 $0
Date MilestoneDummy
if any Milestone Height Define Analyze Design Build
SDLC Phase:
5/9/13 Project Start0- 5/09/13
Project Start10- 5/09/13 Test Trial Launch Stabilize
6/6/13 Portfolio Gate
0 - 6/06/13
Portfolio Gate
8 - 6/06/13
8/29/13 Align Gate -08/29/13
Align Gate -68/29/13 Tech Gate: Portfolio Alignment Launch Closeout
3/27/14 Launch - 3/27/14
0 Launch - 3/27/14
4
6/30/14 Project End 0- 6/30/14
Project End 2- 6/30/14 Entry Portfolio Align Launch Close
151 Curre nt Comple te d 151
PROJECT: Trio 2.2 PPM Number(s): 0 Report as of: 6/3/13
Risks or Issues
Type Description Priority Owner Impact Date
Issue CPS costs being deferred to 2014 and not included in allocated funds. Guidance needed on CPS charges for 2013. High Ferro/Cloud 5/1/2013 ##
Risk BRs and Scope not finalized/approved. Impacts to deliverables for Portfolio Gate Readiness. Medium Carnegie/Redmo 6/6/2013 91
Risk Project estimates provided out of standard process. Reforecasts may not align w ith approved budget. Medium Redmond 6/30/2013 99
0
0
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
Project Charter, Business Requirements, Functional Technical Engineering Specs, Release Notes, Application Conceptual Architecure Diagram, Technical Design 0
Requirements, End-to-End Project Schedule, End-to-End Code, Provisioning 0
Budget Forecast, Project Register, RACI, Issue-Action Item
0
Log
0
0
0
Engineering Quality & Controls Tech Operations 0
Test Strategy, Test Plans, Test Results Support Handoff Plan, Service Guide
0
0
0
0
0
152
PROJECT: LDCO Phase 2.0 PPM Number(s): 33796 Report as of: 5/31/13
LDCO 2.0 expands the LDCO 1.0 Sonus netw ork for Cox LD to support tw o-w ay Current Team is attempting to accelerate the
Brief Description (scope) exchange of voice traffic betw een Cox and select service providers. It establishes an
interconnection-specific netw ork that overlays existing CDT and CB voice sw itches.
Customer
Satisfaction J schedule as much as possible to take
advantage of cost savings.
l
CAM: Kevin Nichols
slip. The project is progressing very w ell
despite the color being reported because Project Manager: Daniel Paine Non Labor Opex $0 $0 $0
of EPM guidelines.
Business Owner: Chris Draper Capex Softw are $0 $0 $0
Scope Scope and business requirements
l
Technology Ow ner: Chris Draper Capex Hardw are $930,417 $1,083,987 $153,570
defined using BPA process. No changes
to scope. NSE, Backbone Eng, Ops, Employee Labor $117,444 $278,090 $160,646
Key Partners:
Sec Eng
Contractor Labor $30,423 $104,100 $73,677
Sonus, Juniper, Empirix,
Budget Budget tracked by month, trending on Key Vendors:
l
Anue, TEOCO Other $126,482 $62,500 ($63,982)
target.
Date MilestoneDummy
if any Milestone Height Define Analyze Design Build
SDLC Phase:
7/16/12 Project Start0- 7/16/12
Project Start10- 7/16/12 Test Trial Launch Stabilize
12/6/12 Portfolio Gate
0 - 12/06/12
Portfolio Gate
8 - 12/06/12
6/14/13 Align Gate -06/14/13
Align Gate -66/14/13 Tech Gate: Portfolio Alignment Launch Closeout
1/15/14 Launch - 1/15/14
0 Launch - 1/15/14
4
7/24/14 Project End 0- 7/24/14
Project End 2- 7/24/14 Entry Portfolio Align Launch Close
153 Curre nt Comple te d 153
PROJECT: LDCO Phase 2.0 PPM Number(s): 0 Report as of: 5/31/13
Risks or Issues
Type Description Priority Owner Impact Date
Issue Timeline for dev lab installation and integration are based on estimates. This w ork has never been performed before. Low Daniel P. ##
Risk Timeline for dev lab testing is based on estimates. This w ork has never been performed before. Low Daniel P. 94
Risk DB design may be more completex than originally anticipated High Daniel P. 6/14/2013 59
0
0
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
Business requirements (BPA) Event Engineering Design review /input to NSE, Backbone, and Security. 0
0
8
0
0
0
Engineering Quality & Controls Tech Operations 0
Functional requirements Database design
0
Design Lab testing (Dev & SVL)
Lab testing (Dev & SVL) Production launch and support 0
Production 0
0
0
154
PROJECT: IP Video Provisioning PPM Number(s): 33990 Report as of: 5/31/13
J
provisioned to customers that do not have an associated video CPE. i.e. CB Bulk IP
Brief Description (scope) Customer
Video customers w ith different channel lineups & individual upsell behind a bulk
Satisfaction
account.
Overall Project Status: Category: Products Remaining
YTD Financials Actuals Budget
Schedule Project w as started in Oct/2012, Project is Spend
l
CAM: Alyse Minsky
in requirements/design phase currently.
Project Manager: Non Labor Opex $0 $15 $15
l
Technology Ow ner: Tara Flack Capex Hardw are $0 $0 $0
development and architecture w ork. In Carrie Moore (Tech
2014, w e w ill be doing integration and Employee Labor $200,000 $1,800,000 $1,600,000
Key Partners: Ops);Debbie Walters and
deployment. Fari Kurtz (BSS) Contractor Labor $0 $1,110,000 $1,110,000
Budget Plan to spend 1.6 in 2013 and 1.3 in 2014 Key Vendors: Netcracker
l
Other $0 $0 $0
Date MilestoneDummy
if any MilestoneHeight Define Analyze Design Build
SDLC Phase:
10/1/12 Project Start0- 10/01/12
Project Start10- 10/01/12 Test Trial Launch Stabilize
3/14/13 Portfolio Gate
0 - 3/14/13
Portfolio Gate
8 - 3/14/13
8/15/13 Align Gate -08/15/13
Align Gate -68/15/13 Tech Gate: Portfolio Alignment Launch Closeout
10/1/14 Launch - 10/01/14
0 Launch - 10/01/14
4
10/1/14 Project End 0- 10/01/14
Project End 2- 10/01/14 Entry Portfolio Align Launch Close
155 Curre nt Comple te d 155
PROJECT: IP Video Provisioning PPM Number(s): 0 Report as of: 5/31/13
Risks or Issues
Type Description Priority Owner Impact Date
Risk This feature must be implemented before w e launch more than 7 universtiies w ith IPTV Lee McLure 84
Risk ICOMS release 8.2.7 must be delivered for this feature to be implemented. There are only one to tw o ICOMS releases Lee McLure ##
(cont'd) a year, so if this does not roll w ith 8.2.7, the project w ill be delayed signficantly. 95
Risk We are the only customer coding against ICOMS Version 8 - if w e upgrade to version 9, w e may have to do this again. ##
0
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
ICOMS Version 8.2.7 0
0
0
0
0
0
Engineering Quality & Controls Tech Operations 0
0
0
0
0
0
156
PROJECT: Email Platform PPM Number(s): 33710 Report as of: 5/31/13
Current
J
Program to improve and monetize Cox email service for residential CHSI customers and
Brief Description (scope) Customer
segments of the Cox Business customer base.
Satisfaction
l
CAM: Kevin Nichols
baselined.
Project Manager: Phillip Casper Non Labor Opex $0 $0 $0
l
Technology Ow ner: Robert Yeary Capex Hardw are $0 $0 $0
UI/UX Prod Tech, Cust Care, Field
Environment and Labs Employee Labor $114,788 $30,000 ($84,788)
Key Partners: Services, Web Strategy,
Migration Tech Ops Contractor Labor $77,524 $84,351 $6,827
Budget Residential Project Budget has been Key Vendors: Open Wave
l
Other $0 $0 $0
baselined
Risks or Issues
Type Description Priority Owner Impact Date
Risk Slippage in OpenXchange GA (target 4/1) Medium Product 39
Risk CB integration Medium App Eng 14
Risk Technology resource constraints High All groups 31
0
0
0
0
0
0
0
Functional Dependencies 0
0
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 0
none identif ied to date None identified to date Storage 0
0
0
0
0
0
Engineering Quality & Controls Tech Operations 0
0
0
0
0
0
158
PROJECT: Atlas PPM Number(s): 33588 Report as of: 5/31/13
Current
K
Cox Business SFA/CRM and Order Management solution. Development of reference Alignment Gate and overall project
Brief Description (scope) Customer
architecture and 3 to 5 year BSS/OSS transformation roadmap. delays are a concern.
Satisfaction
l
CAM: Scott Nelson
time, leading do a delay in the Alignment
Gate until August. Project Manager: Frank Tom Non Labor Opex $330,010 $626,790 $296,780
l
Technology Ow ner: Johannes Eckert Capex Hardw are $0 $0 $0
has been approved by both Cox and
NetCracker, w ith no increase in Scope CB: Atl Ops, Sales, Service Employee Labor $1,004,817 $1,648,500 $643,683
Key Partners:
identified. Delivery, Supply Chain
Contractor Labor $4,905,376 $6,295,710 $1,390,334
NetCracker, Accenture,
Budget Additional budget w ill be needed to get to Key Vendors:
l
Jabian Other $0 $60,000 $60,000
the delayed Alignement Gate. 2013
Spend w ill be reduced, but overall project
costs w ill increase. Target Market(s): All Totals $6,240,203 $8,631,000 $2,390,797
Date MilestoneDummy
if any Milestone Height Define Analyze Design Build
SDLC Phase:
5/1/12 Project Start0- 5/01/12
Project Start10- 5/01/12 Test Trial Launch Stabilize
12/6/12 Portfolio Gate
0 - 12/06/12
Portfolio Gate
8 - 12/06/12
8/29/13 Align Gate -08/29/13
Align Gate -68/29/13 Tech Gate: Portfolio Alignment Launch Closeout
5/12/14 Launch - 5/12/14
0 Launch - 5/12/14
4
3/28/15 Project End 0- 3/28/15
Project End 2- 3/28/15 Entry Portfolio Align Launch Close
159 Curre nt Comple te d 159
PROJECT: Atlas PPM Number(s): 0 Report as of: 5/31/13
Risks or Issues
Type Description Priority Owner Impact Date
Issue Application Specification Methodology needs further clarifications Medium Frank Tom 1/7/2013 66
Issue Length of Analysis Phase longer than planned for at Portfolio Gate High Frank Tom 1/7/2013 66
Risk The hybrid SaaS-Managed Services operating model requires close monitoring and oversight High Davind Maharaj 2/4/2013 88
Risk External systems (ICOMS, BI) may be impacted by integration or design decisions High Rod Echols 1/27/2014 79
Risk ICOMS Interface Complexity and potential impacts High Floyd Alcorn 5/1/2013 48
Risk Data Migration Complexity High Greg Usiskin 5/1/2013 25
0
0
0
0
Functional Dependencies 10
6
App Dev - BRR App Dev - BSS, OSS, CSS Architecture 3
Develop Traceability Plan Complete System Requirements (Functional, Technical, Conduct Architecture Review s 11
Operational) Conduct Design Review s 13
Define Process and Data Flow s
6
Define Trial Strategy
Define Launch Strategy 3
11
0
Engineering Quality & Controls Tech Operations 0
Define Test Strategy Initiate Support Documentation
0
Develop Test Plans Initiate Support Hand-of f plan development
Initiate Test Case Development 0
0
0
0
160