The document discusses the construction of a storm water pump house in Gazoldoba, Jalpaiguri, West Bengal. It summarizes the key components and status of the project. The pump house will have vertical turbine pumps, screens, flap valves, electrical equipment like transformers, panels, and a DG set. Installation of the pumps, delivery pipes, crane is complete. Electrical equipment installation will begin soon. The project is 75% physically and 61% financially complete, with an expected end date of October 2021.
The document discusses the construction of a storm water pump house in Gazoldoba, Jalpaiguri, West Bengal. It summarizes the key components and status of the project. The pump house will have vertical turbine pumps, screens, flap valves, electrical equipment like transformers, panels, and a DG set. Installation of the pumps, delivery pipes, crane is complete. Electrical equipment installation will begin soon. The project is 75% physically and 61% financially complete, with an expected end date of October 2021.
The document discusses the construction of a storm water pump house in Gazoldoba, Jalpaiguri, West Bengal. It summarizes the key components and status of the project. The pump house will have vertical turbine pumps, screens, flap valves, electrical equipment like transformers, panels, and a DG set. Installation of the pumps, delivery pipes, crane is complete. Electrical equipment installation will begin soon. The project is 75% physically and 61% financially complete, with an expected end date of October 2021.
The document discusses the construction of a storm water pump house in Gazoldoba, Jalpaiguri, West Bengal. It summarizes the key components and status of the project. The pump house will have vertical turbine pumps, screens, flap valves, electrical equipment like transformers, panels, and a DG set. Installation of the pumps, delivery pipes, crane is complete. Electrical equipment installation will begin soon. The project is 75% physically and 61% financially complete, with an expected end date of October 2021.
Tagging bundh by sheet piling etc. at country side and Construction of Storm water Pump House with its allied components at Gazoldoba in P.S.- Bhaktinagar,Dist-Jalpaiguri.” (Electro-mechanical part) Estimated Cost Estimated cost : Rs. 16.76 Cr Tendered Amount :Rs. 13.98 Cr (4.44% Less)
Cost for Electric power service connection &
security deposit: Rs. 1.75 Cr (WBSEDCL)
Executing Agency: Wilo Mather & Platt Pumps
Pvt. Ltd. , Pune, Maharastra
Work order issued on: 28.06.2019
Status of Fund
Cumulative Fund received till date:
Rs. 10.10 Cr
Fund Utilized:Rs 9.60 Cr
Necessity of SWD Pump House Entire Mega Tourism Park is located in a low level basin. Very high rainfall occurs during monsoon. Estimated storm discharge is around 10 Cumec. Capacity of existing cross drainage (CD) structure is only 1 Cumec. Construction of Additional CD structure is not a feasible solution. Construction of storm water drainage pump house is inevitable for quick disposal of accumulated water. Major Mechanical Components Vertical Turbine Pump (50 Cusec, 7.5 m head). CIDF delivery pipes. Screen & Accessories (Trash Rack, Bar Screen). Valves (Flap Valve, Air Release, etc). EOT Crane (15 T), Monorail Crane,Chain pulley block. Deep Tube Well with Submersible Pump. Cooling water Recirculating(CWR) Pump. Rader type water level sensor. Location of the SWD Pump House
Location of SWD PUMP HOUSE
Vertical Turbine (VT) Pump Pump- 8 Nos. (7 working + 1 standby) Discharge : 1.42 cum/sec (50 cusec) (+10%) Total Dynamic Head: 7.5 m (+5%) Efficiency : Not less than (88%) Speed: <600 RPM Type :Vertical Axial Flow Lubrication: Fresh water lubricated Type of impeller: Open type(propeller) Duty: Continuous EOT Crane Capacity: 15 M.T. Lift: 8 M Span: 7 M Double girder Trash Rack and Bar screen Flap Valve
Flap Valve – 8 nos.
size: 900 dia Single swing Disc non return type CWR Pump Horizontal Centrifugal Pump Fresh water lubrication Drive Motor rating :1.1 KW Head: 25 m Discharge: 25cum/hr 3 nos.( 2 nos.working and 1 no.spare) For fresh water lubrication and bearing cooling water of SWD Pump Submersible Pump Submersible Pump (for fresh water supply) Drive motor rating: 3.7 KW Head: 50 m Discharge: 25m3/hr Delivery pipe: 100mm dia Nos: 2 nos ( 1 working and 1 no kept as spare) Radar Type Water level indicator Major Electrical Components HT Panel at Sub-station. LT Panel ( 2 at Sub Station, 1 at Pump House) Transformer –Dry type, indoor ,resin cast(2 nos,1250 kVA) Capacitor Bank( 100 KVAR) SPDP Induction Motor (180 kW) 500 kVA DG set H.T Panel
Ratings : 11 KV, 1250 A Breaking capacity : 500 MVA for 11 KV Type: Cubical draw out type extensible on either side L.T Panels Type of L.T Panel: Rating of Incoming •Rating of Outgoings Cubical – vertical free Board 1(at S/S): 2000A, •Board 1 standing extensible TPN ACB - 1 No. •2000 A TPN ACB – 1 No. on either side Board 2(at S/S): (ACB) Nominal Voltage (V): 2000A,TPN ACB - 1 No •32A, TPN MCCB –1 No. 415 V, TPN •100A, TPN MCCB– 2 Nos. Board 3(Pump House): Fault level (MVA): 35 •63A TPN MCCB-5 Nos. 2000A,TPN ACB – 2 No. MVA Transformer Number of Transformers: 2 Rating : 2Nos 1250 KVA, 11KV, 433 V, 3 ph Type of Transformer: INDOOR air cooled cast resin Dry type Capacitor Bank • 8 nos • 100KVAR • Power Factor near to 1 • Delta connected • 425/440 VAC, 3 ph, 50Hz SPDP Induction Motor •Motor – 8 Nos. •Rating: 180 KW •Type: Vertical Sq. cage induction •Voltage: 415 V+-10% •Frequency: 50 Hz + -5% •Phases: 3 •Speed: 600 RPM •Class of insulation: B •Mounting: Vertical flange mounted •Duty cycle: Continuous •Cooling: Fan cooled DG SET •Rating (kVA):500 •Rated kW:400 •Rated Current (Amps):695 •Total Dry Weight (Kgs):6200 •BHP: 595 •No. of Cylinders: 12 •RPM: 1500 Present Status of M&E Works Supply of all Electro-Mech Equipments completed. Installation of 15 T EOT crane done. Installation of Pumps alongwith delivery lines,flap valves etc done. Installation of Electrical equipments viz Transformer, HT & LT panel, Capacitor Bank , DG set will be started soon. Progress of works Physical Progress: 75% Financial Progress:61%
Expected Date of completion: 31.10.2021
Installation of EOT Crane Pump Installation works Installation of Delivery pipes Removable screen & Trashrack THANK YOU