Professional Documents
Culture Documents
Common Rail Diagnostics: Hitachi Construction Machinery Asia & Pacific Pte. LTD
Common Rail Diagnostics: Hitachi Construction Machinery Asia & Pacific Pte. LTD
NB: This harness can only be used on ZX-3 models with fitted with
common rails.
Page 3
(2) Voltage Measurement : Preparation
Page 4
(2) Voltage Measurement: Procedure
Page 5
(2) Voltage Measurement: Procedure
Page 6
(3) Common Rail Location for 6WG1 Engine
Page 7
(4) Wire Harness Diagram
NB:
Page 8
Common Rail Voltage check
• Check if connection of wire harness are not so proper first.
• check Common Rail Sensor out-put voltage using multi tester as
attached photo.
Blue/White: Ground
Brown: Out put Signal
Blue: Power Supply
Page 9
Common Rail Voltage check
Blue/White: Ground
Brown: Out put Signal
Blue: Voltage Supply
Procedure
1. Slow Idle 900 rpm (P mode) without load. Voltage should be #.# to #.# V
2. Fast idle 1650 rpm (P mode) without load. Voltage should be #.# to #.# V
3. Fast idle with Relief position. Voltage should be #.# to #.# V
Page 10
End
Page 11