Professional Documents
Culture Documents
DSM
DSM
Revised DSM rates under CERC order dated 06.02.2023(For Generators only)
Normal rate
Rs. 12/kWh
capped to
means (i) in respect of a general seller whose tariff is determined under Section 62 or Section
‘Reference 63 of the Act, Rs/ kWh energy charge as determined by the Appropriate Commission, or (ii) in
Charge Rate’ respect of a general seller whose tariff is not determined under Section 62 or Section 63 of the Rs. 5.00 to 8.00/ kWh
(RCR) Act, the daily weighted average ACP of the Day Ahead Market segments of all the Power
Exchanges, as the case may be;
COMPARISION OF DSM REGULATIONS
Clause Interpretation as per CERC DSM regulations 2022 and relevant orders Interpretation as per CERC Order dated 06.02.2023
Normal Rate of Charges: The normal rate of charges for deviation for a time block shall be Normal Rate of Charges:Normal Rate of Charges for Deviations for a time block as specified in Regulation 7 of the
equal to the highest of [the weighted average ACP of the Day Ahead Market segments of all DSM Regulations, 2022 shall be equal to the higher of [the weighted average ACP of the Day Ahead Market
the Power Exchanges; or the weighted average segments of all the Power Exchanges; and the weighted average ACP of the Real Time Market segments of all the
1 ACP of the Real Time Market segments of all the Power Exchanges; or the Weighted Average Power Exchanges, for that time block] subject to a ceiling of Rs 12 per kWh, until further orders.
Ancillary Service Charge of all the regions] for that time block.
NA In case of forced outage of a seller, the charges for deviation shall be @ the reference charge rate, for a maximum
2 duration of eight time blocks or until the revision of its schedule, whichever is earlier.
Normal frequency range, when frequency is 49.90 Hz>f<50.05 Hz Normal frequency range, when frequency is 49.95 Hz>f<50.03 Hz
i.Payable: @Reference charge for under injection upto 2% i.Payable: @Reference charge for under injection upto 10% or 100 MW whichever is less.
8 ii. Payable: @120% of Normal rate of charges for under injection from 2% to 10% ii. Payable: @120% of Normal rate of charges for under injection from 10% or 100 MW whichever is less to 15% or
150 MW whichever is less
iii. Payable: @150% of Normal rate of charges for under injection beyond 10% iii. Payable: @150% of Normal rate of charges for under injection beyond 15% or 150 MW whichever is less.