Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 1

Howden Property Integrated Water Management Features V1

Prepared by Encader Consulting and Foresight Advisory 1a. Major access road located above 1:100
Created: 23/06/2021 ARI
1b. Howden development located above
1:100 ARI
1c. Improvement of floodplain connectivity
and storage

4c

4e
4b
2a. Constructed swale to convey all
3e treated stormwater to Wimmera River
4d
2f 2b. Constructed swale to convey
3d stormwater runoff from Stage 1 (Latus)
3a urban area
3c
2c. Constructed wetland No 1 to detain
3b
and treat increased stormwater runoff
from Stage 1 urban area (Latus)
2d. Constructed wetland No 2 to detain
and treat stormwater runoff from Stage 2
urban area (Howden)
4a 2e. Constructed wetland No 3 to detain
and treat stormwater runoff from Stage 2
urban area (Pelchen)
2f. Existing likely line of flow

4a. Cycle/walking path from swing bridge to Island Link board walk 3a. Revegetation along degraded eastern
4b. Island link board walk river bank
4c. Northern section of cycle/walking path to Howden property 3b. Revegetation along pathway
boundary and future link 3c. Revegetation around Stage 1 Wetland
4.d. Cycle/walking path back to existing trail via Howden Wetland loop 3d. Revegetation around Stage 2 Wetland
4.e. Cycle walking path connection to Cameron Road 3e. Revegetation around stage 3 Wetland

You might also like