Professional Documents
Culture Documents
Production Planning: Enza Zaden
Production Planning: Enza Zaden
Production Planning: Enza Zaden
Production Planning
ENZA ZADEN
Long-/Mid-/Short-term planning
Production requirements from DRP
RCCP – Production Planning
Production network and characteristics Stockseed requirements and plan
(i.e. capacity)
Agenda
What are the key solution requirements and how are we solving for it?
1. How are we bringing various data elements together to support production planning decisions
Yield
Purity Etc… • Complex puzzle to be made
Forbidden com. Etc…
Diseases • Many factors to be considered
Etc…
Risk spreading • Data in many different systems and/or not supported
Costs Etc…
• Risk of placing a production on a wrong or not optimal location
Phytosanitary Capacity Germination
• Poor visibility on demand related long term production
capacity requirements
• Poor transparency throughout the chain
• Data behind decision making
• Effect of a change in demand or supply both up- and downstream of the
supply chain
ENZA ZADEN
To produce 1 TP of a primary
This data is updated periodically using latest production data from field reports
ENZA ZADEN
Production Lead Times for various different production options at a grower for a primary variety
ENZA ZADEN
Standard / Organic
Create
What can be produced where Commercial, R&D and stockseed
the Available capacity at Producers Seeds, pollen, plant, bulbs, ….
network
Productio
n
Available constraint
capacity
ENZA ZADEN
Grower Costs for Selected Capacity Over-Under Util% Grower Scorecards for
Selected
TSW % % Disease
Yield Usable Free
ENZA ZADEN
Other Views
t h at
n d ev
i l t i
n b u
b ee
av e
at h d ed
t s t h e a d
p o r n b
e a
o t h er r c
Any
ENZA ZADEN