Professional Documents
Culture Documents
ProceraPlus Training
ProceraPlus Training
Power Protection
Procera Plus
Design, Drawing and calculation software for
industrial low voltage installations
including distribution circuits
ProceraPlus
2
GE Consumer & Industrial
Industrial Components Team
ProceraPlus
• Complete documentation on the project for the engineering, panel builder, electrical
contractor, control body, maintenance services.
3
GE Consumer & Industrial
Industrial Components Team
ProceraPlus
• Fault levels
• Switchgear selection
4
GE Consumer & Industrial
Industrial Components Team
ProceraPlus
Sources Circuits
- Number of sources: 6 normal + emergency source - Distribution board
(upto 6300A) in parallel + standby power unit
- Terminal circuit
-Earthing systems: TN(-C-S), TT and IT with and
Motor, socket-outlet, lighting, heating,
without neutral
transformator LV/LV, capacitor bank (pro
- Public distribution starting from Ik distribution board), miscellaneous
In Procera Plus a project is entered starting at the Upstream device (source supply ) moving to
Downstream (end-user circuits)
This method is used to determine the protective devices and cable cross-sections
First the source must be defined, then the distribution circuits and finish by end-user's circuits.
In Procera Plus, any circuit, distribution board or end-user circuit can be changed at any time.
6
GE Consumer & Industrial
Industrial Components Team
ProceraPlus
Software Interface
Menu
Network tree
Results window
Report
7
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Pull Down Menus
8
GE Consumer & Industrial
Industrial Components Team
ProceraPlus
Software Interface
9
GE Consumer & Industrial
Industrial Components Team
ProceraPlus
Software Interface
Easy control of data entry, parameters and results
Protection
Length
Consumption
Calculate
10
GE Consumer & Industrial
Industrial Components Team
ProceraPlus
Software Interface
A software which automaticaly prints a complete file
11
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Buttons
12
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Getting Started
13
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project Started – Type of Source
14
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project Started – Source Characteristics
Transformer
They can be entered:
15
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project Started – Source Characteristics
Genset:
They can be entered :
16
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project Started – Source Power
17
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project Started – Number of Sources
18
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project Started – Network Parameters
19
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project Started – Link Parameters
•Length
•Installation method
•Copper , aluminum
•Cable type
20
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project Started – Link Parameters
•Length
•Installation method
•Copper , aluminum
•Cable type
21
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project Started – Link Parameters
22
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project Started – AS/NZ adjustments
24
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project Started – Getting First Results
Getting results:
Press Calculate to get results
•cable cross section
•Fault levels
25
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project Started – Getting First Results
Result window
Result Window
Press OK to go further 26
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project Started – Getting First Results
Results window
Cable Cross-section
Criterion
Design Circuit current
Theoretic Cross Section
Voltage Drop
Max Short Circuit Current
Max 1Ph SC Current
Min Short Circuit Current
Ph-E Fault Current Calculated for minimum
(needed for human number of sources
protection)
Calculated for minimum
number of sources
27
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project Started – Getting First Results
Diagram
Diagram with results for first part of circuit is available
Colours of diagram
Green- OK
Red- must be calculated
Purple- NOK
28
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Creating Project– Reading Information
Distribution Consumption
Active Source Active board Available current
Project single line
diagram
Results
Project Tree
29
GE Consumer & Industrial
Calculation report Industrial Components Team
ProceraPlus Creating Project – Using Tabs
Using Tabs
Defining Source the “ Source”
Tab was used.
What other Tabs can we use?
30
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Creating Project – Using Tabs
Impedance Tab
31
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Creating Project – Using Tabs
Impedance Tab
R0 Phase-Phase - Loop resistance Phase to Phase (equals to 2 times one phase resistance), calculated at
20°C conductors temperature. This value is used to determine the maximum short circuit currents (Ik Max).
R1 Phase-Phase Loop resistance Phase to Phase (equals to 2 times one phase resistance), calculated at
operating temperature. This value is used to determine among others the minimum short circuit currents (Ik
Min).
X Phase-Phase Loop reactance Phase to Phase. This value is used to determine minimum short circuit
currents (Ik Min).
X Phase Phase reactance. This value is used to determine maximum short circuit currents.
R0 Phase-Neutral Loop resistance Phase to Neutral, calculated at 20°C conductors temperature. This
value is used to determine the maximum short circuit current (Ik Max SIngle).
R1 Phase-Neutral Loop resistance Phase to Netral, calculated at operating temperature. This value is used
to determine among others the minimum short circuit current (Ik Min Single).
X Phase-Neutral Loop reactance Phase to Neutral. This value is used to determine minimum short circuit
current (Ik Min
32
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Creating Project – Using Tabs
Board Tab
34
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Creating Project – Using Tabs
UPS Tab
•A UPS can be connected either on a Normal or
Standby distribution.
•A comparison between Ik is done to keep the
least favorable one (Ik max on the network, Ik
min on the UPS). The process is inverted when
Normal source Ik Min become less than UPS
ones.
UPS are considered as current generators. Due to
that, Ik are unchanged along the network tree. The
UPS is always considered as connected in "By-
Pass"mode.
35
GE Consumer & Industrial
. Industrial Components Team
ProceraPlus Creating Project – Using Tabs
Ik/dU Tab
•Normal and standby short circuit currents at board level.
•IK2/3 Max Maximum three-phase short circuit current.
Maximum value between Normal and standby if it exists.
IK1 Max Maximum single-phase short circuit current if
neutral is present. Maximum value between Normal and
standby if it exists.
•Ik1/2Min Minimum single-phase short circuit current if
neutral is present. biphase (phase to phase) if neutral is
absent.
•If Phase-PE default short circuit current at line end.
Minimum value between Normal and standby if it exists.
•dU Cumulated voltage drop (in %) at board level from
source of
36
. GE Consumer & Industrial
Industrial Components Team
ProceraPlus Creating Project – Using Tabs
Currents Tab
•I Allowed -allowed current downstream board. This value is
equal to the current of the circuit feeding the board.
•I available -available current downstream board : available
design current for new circuits which can still be fed from the
board.
•S Intensities -design current IB sum of all circuits issued
from the board multiplied by the board simultaneity factor.
•Mean cos phi -mean power factor phi at board level, taking
into account downstream circuits and eventual capacitors.
•R=S IZ cables / Irth board -ratio between:
sum of currents of downstream circuits (current calculated
without taking into account group factor) and upstream thermal
relay setting.
37
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Creating Project – Using Tabs
Board Tab
Board Tab
You can display the Board window by:
.
38
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Creating Project – Source Has Been
Defined
39
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Creating Project – Types of Source
(Mains and Stand-by)
40
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Creating Project – Types of Source
(Mains and Stand-by)
Next step:
Adding next subboards
41
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Creating Project – Types of Source
(Mains and Stand-by)
42
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Creating Project – Types of Source
(Mains and Stand-by)
43
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Creating Project – Types of Source
(Mains and Stand-by)
44
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project Adding– Link Switches and
Breakers
45
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project Adding– Link Switches and
Breakers
46
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project Adding– Link Switches and
Breakers
Link switches,
Breakers are added
47
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project Adding– New Circuits
how to
1
Five ways of adding
Circuit
48
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project Adding– Different types of circuits,
loads
49
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project Adding New Circuits– Different
types of circuits, loads
50
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project Adding New Circuits - values which
must be specified
and “Calculate”
51
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project Adding New Circuits - selection of
breakers protection circuit
52
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project New Circuit is Added
53
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project New Circuit is Added
– Is the result OK?
Results
The circuit is “ green”- OK
But:
In result window there is
written:
Discrimination – I<8.33kA
54
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project New Circuit is Added
Project total discrimination
To choose breakers
assuring total
discrimination/
selectivity
press button as on
drawing or F12
55
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project New Circuit is Added
Project total discrimination
56
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project New Circuit is Added
Project total discrimination
57
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project New Circuit is Added
Project total discrimination
The total
discrimination is
assured
58
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project - building up project
59
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project – back up protection
FD 25kA
60
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project finished – generating report
To generate a complete
report ( printout)
choose Folder
All. Otherwise results
can be got 1 by one
61
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project finished – generating report
Folios List
62
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project finished – generating report
Supply sheet
63
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project finished – generating report
Network single line
64
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project finished – generating report
Protection settings
65
GE Consumer & Industrial
Industrial Components Team
ProceraPlus Project finished – generating report
Circuit specification
66
GE Consumer & Industrial
Industrial Components Team