Mari Rail Competition

GUJARAT MUNDRA PORT-


KUTCH POWER PLANT
Adani Institute Of Infrastructure Management
MUNDRA PORT
• It is the biggest private port of India Owned by APSEZ (Adani Ports Special
Economic Zones).
• It has 10 terminals and 24 berths available.
• It is India’s first multi product port-based special economic zones.
• Commodities handled are fertilizers, liquid cargo, agri commodities and container
cargo (coal, steel , automobiles etc.)
• Mundra port offers inland connectivity via rail, track, road network, airport and cross
country pipelines.
• Annual Cargo handling capacity is 144.4 million tonnes
• Annual container Volume 5,650,000 TEU

Adani Institute Of Infrastructure Management


MUNDRA POWER PLANT
• Plant type – 4620 MW (now over 10000 MW) coal based thermal power plant,
biggest in India.
• First supercritical technology based thermal power plant approved as CDM project
by UNFCCC.
• Mundra power plant was developed in 4 phases
• Phase I – has 2 units 1 and 2 – 330 MW
• Phase II – has 2 units 3 and 4 – 330 MW
• Phase III and IV – has 2 and 3 units respectively 5,6 7,8 and 9 – 660 MW

Adani Institute Of Infrastructure Management


MUNDRA POWER PLANT
ANIMATION VIDEO
• https://www.youtube.com/watch?v=W3ofHIqY-pA

Adani Institute Of Infrastructure Management


IMPORTS
• The Mundra power plant uses coal imported from a mine in Bunyu Island, Indonesia, under
a 15 year fuel supply agreement signed with Adani Entrprises.
• Phases I and II are supplied with 4.8 mtpa of coal and Phase III with 4.24 mtpa.
• Phase IV imports 6.4 mtpa of F grade coal from Mahanadi Coalfields in Orissa, India
• The seawater from Gulf of Kutch is the source of water for closed-cycle induced draft
circulating cooling water system of the plant.
• The seawater for cooling purpose is transported using large- diameter glass reinforced pipes,
making Mundra first project plant to use such pipes.

Adani Institute Of Infrastructure Management


DISTRIBUTION / SUPPLY
• Adani Power evacuates approx, 1000MW from Phase 1 to Gujarat Vitran Nigam. Similar
contract is shared between the two companies for Phase 2.
• Additional power of 221MW from Phase 2 is sold to AEL under a 15 year purchase
agreement.
• Other purchase agreement includes the supply of 1424MW from Phase4 to Uttar Harayana
Bijli Vitran under 25 year PPA’s.
• Approx 1000MW from Mundra Power is transmitted to Power Grid Corporation of India at
Dahegam, Gujarat, via 433 km long 400Kv tansmission line
• A dedicated 989 km long and 550 KV bipole, high voltage line was constructed from
Muundra to Mohinergarh Haryana with capacity of 2500MV from Phase 4.

Adani Institute Of Infrastructure Management


TATA MUNDRA ULTRA MEGA
POWER PLANT

Adani Institute Of Infrastructure Management


Adani Institute Of Infrastructure Management
Adani Institute Of Infrastructure Management