B Y: T E K T O N S T R O N G B U I D E R S C O R P
SCOPE OF WORK
Preparation of Area
• Install tiles at the center axis base on the lay out plan.
WORK Leadman/Foreman will double check if the setting out plan
EXECUTION is followed correctly. Use of proper PPE is a must (gloves,
eye goggles, safety shoes and reflectorized vest)
• Spread the tile adhesive using notch trowel on the back of
the tiles, spread properly to avoid hollow sound “kapak” of
tiles. Make sure that the tools are inspected before and
after used.
• Put 3mm plastic tile spacer to maintain correct tile spacing
prior to grout application. Don’t forget to remove the tile
spacer before adhesive settled.
• Check installed tiles for unflushed / resalte tiles, incorrect
drain pattern and incorrect shade
3. WORK PROCEDURE
Application of Grout
• After tiles had sufficiently set, force a minimum
grout into joints by trowel, brush or finger
WORK application
• Fill all joints of square edge tiles flush with the
EXECUTION surface of tiles
• Fill all gaps or sips
• During grout application, wipe all excess grout off
with clean burlap, clothes or sponges
• Conduct testing of slope to drain to ensure that
there’s no water ponding
• Maintain cleanliness of the area and provide tile
protection cover (plywood or any available tile
protection).
T IL E A D H E S I V E
T IL E G R O U T
a) Used of approved materials. Using of electrical tools must have a a) Use approved materials.
color coded scheme as required by OSHA Electrical Cord Inspection
(quarterly inspection) additional must be in good condition.
b) Add approximately 500 ml of water for 2kg/bag of
approved tile grout. Mix thoroughly for several minutes
b) Add approximately 6-7 liters of water for 25kg/bag of approved tile
adhesive. Mix thoroughly for several times until it meets the desired until it meets the desired homogenous paste. Complete
homogenous paste. Complete PPE must worn by the assigned PPE must be worn before and during the activity.
workers. c) Allow tile grout to cure for 24-hours prior to light traffic.
c) Use of electrical mixer/mixing paddle with 300 to 600 rpm for 2 to 3
d) If alternative material to be use, follow the TDS of
minutes. Make sure they have color coded scheme and inspected by
warehouseman before and after use. material for the methodology of installation. Workers
d) Allow tile adhesive to cure for 7 – 15 days prior to entry of people. must be oriented before using any foreign material.
e) If alternative material to be use, follow the TDS of material for the Recommend appropriate PPE.
methodology of installation. Workers must be oriented before using
any foreign material. Recommend appropriate PPE.
CLEANING After completing tile
At the end of each work, installation, clean spattered
remove rubbish, empty surfaces from concrete mixed,
sacks, rags and other remove spattered concrete
discarded materials from mixed by wet foam or rags,
project site. Clean the area and other methods. Do not
before and after activity scratch or damage installed
tiles.
“resalte”