This document summarizes the drainage design for a 0.225 hectare commercial area with an 89.88 meter long drainage channel. It calculates the peak runoff of a 10-year return period storm using the rational method and confirms the capacity of the drainage system is sufficient to handle the estimated peak runoff. Design details like drainage dimensions, land use type, and time of concentration are provided to support the runoff estimation and capacity check.
This document summarizes the drainage design for a 0.225 hectare commercial area with an 89.88 meter long drainage channel. It calculates the peak runoff of a 10-year return period storm using the rational method and confirms the capacity of the drainage system is sufficient to handle the estimated peak runoff. Design details like drainage dimensions, land use type, and time of concentration are provided to support the runoff estimation and capacity check.
This document summarizes the drainage design for a 0.225 hectare commercial area with an 89.88 meter long drainage channel. It calculates the peak runoff of a 10-year return period storm using the rational method and confirms the capacity of the drainage system is sufficient to handle the estimated peak runoff. Design details like drainage dimensions, land use type, and time of concentration are provided to support the runoff estimation and capacity check.
Sub Area: 0.225 ha Type of landuse: Commercial and Business Centre Length: 89.88 m Lo = 26.87 m Ld = 89.88 m N = 0.015 (paved)
Time concentration = Overland Flow, to + Drain Time, td
Min time concentration = 5 minutes Design location: Setor JPS Kajang (nearest to the location project) Table 2B (MSMA) (got the fitting constant) Main Drainage: F-12 (800 mm x 800 mm) Drainage: G-12 (600 mm x 600 mm) Intensity, i – get constant value from table 2.B1 in appendix 2.B Quantity design Storm ARIs (commercial and business center – minor system – 10 years. Use rational method to get runoff peak estimation, Qp • Qcap > Qp – OK!