Rules To Manage Claims From Renault and SMART 18122019
Rules To Manage Claims From Renault and SMART 18122019
CLAIMS ANSWERS
EXPECTATIONS
RENAULT SUB-BU
December 18th, 2019
Rev0/
MUST FOR EACH CO-CI-RE-YI-WR-PIA
Steps Expectation Records Who Due date
2 Similar Risky Products/Projects within YAZAKI. Projects / Products name Plant Immediate
If no or yes, Why ? Plant
Securisation in each SIPOC step. Instruction of sorting / Quality alert sheet with Operators signature each shift. Plant/QRE
SUPPLIER Record of sorting in Supplier / Plant / Warehouse / FGS / Customer. Plant/QRE
INCOMING Copy of the claim sent to our Supplier / Good Job Number. Plant
4 PROCESS Expected date of delivery of first OK parts. Plant First 24 hrs
OUTPUTS Defect reproduction video or picture Plant
CUSTOMER Picture of Marking on parts. Plant
Picture of Secured boxes identification (Green Label). Plant
Test equipment /paper records : to confirm or not issue already happen. Plant
Analysis : - History, For occurrence & non detection: Plant
- Non-detection, 5Why + Ishikawa for each of them. Plant
5 - Non-occurrence, Plant First 24 hrs
Simulations evidences.
- Non-prevention. Explanation of each potential W or M and confirmation or not. Plant
Answer to why issue could not be prevented (FMEA/CP/Technical Reception / Design reviews). Plant/QRE
Capitalization and transversalization Copy or screens shoot of each document updated (not share complete DFMEA of PFMEA) Plant Maximum 30
8 Flow chart, Control plan, procedures, Instructions, Layout, FMEA extract, … Plant days
Show evidences of transversalization in other processes, projects. Plant/CSC
Customer expect high level of analysis. GQRS/GQE will not be accepted by QRE if above expectations not met.
© 2018 YAZAKI Europe Limited. All Rights Reserved. Confidential – Do Not Distribute 2
QRE REPORT EXAMPLE
Issue Information Photos OK/NOK condition
Carline: Eng. Level:
Product Name:
Product Number + serial:
Manufacturing Date / Plant:
Component type:
Component details:
Defect Category:
GQRS numbers:
GQE number:
Expected / Confirmed Ranking and/or PPM:
Defect description
When it happens (date)?:
Where it happens (FGS, RSA warehouse, FAB, AVES, CSCS, TCM, CAT)?:
Who detected it (Opes, Rew, TQF, AVES Team, Dealer, Final cust) ?:
How much (cost estimation, stock available, quantity on NOK, potential risks)?:
© 2018 YAZAKI Europe Limited. All Rights Reserved. Confidential – Do Not Distribute 4