3 WH Drum Process Project

You might also like

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 28

MUTHA ENGINEERING PVT.LTD.

UNIT –I,OLD MIDC SATARA-415004

SUBJECT: PROJECT REPORT

Name : Mrs. Rupali Sachin Dixit


Qualification : Msc (physics)
Collage Name : Y.C.I.S.Satara.
Project : Bajaj 3 wheeleer Break Drum Process Analysis
PROJECT NAME

Bajaj 3 wheeleer Break Drum Process


Analysis
INPUT PROCESS TURNING OPERATION
INPUT PROCESS TURNING OPERATION

INPUT-PROCESS-OUTPUT SHEET
Part Operation
Model Part No. Part Name Operation No. Opn. Rev.
Mod. No. Description
3 Wheeler 22151106 Brake Drum Cast Iron 4 170 Boring & Facing 01' 04.09.2019
PRO
CESS

CLAMPING

RESTING
TURNING OPERATION SEQUENCE METHOD

3M - METHOD

3.1 -OPERATION SEQUENCE

SR. N Activity Cycle sequence Time in Sec

1 Open Door 2
Unloading
2 Press foot switch & Unload component 2

3 Clean Jaw & Resting face Cleaning 5

4 Load component & press foot switch 5

5 close door Loading 2


6 Press cycle start 2

7 Machining cycle Machining 42

CYCLE TIME 60
AFTER TURNING OPERATION
INPUT-PROCESS-OUTPUT SHEET
Part Operation Operation
Model Part No. Part Name Opn. Rev.
Mod. No. No. Description
Boring &
3 Wheeler 2.2E+07 Brake Drum Cast Iron 4 170 01' 04.09.201
Facing
OUTP
UT
AFTER TURNING MEASURING METHOD

OUTPUT CONDITION
SR.N Inspection Responsibil
Parameter Defect No. Specification Measured by Gauge No.
O. frequency ity
1 Inner Dia 44,45,46 52.00 +0.050 Plug Gauge ……….. 100%
Surface Finish on
2 41 Ra 6.3 Surface Tester ……….. 1 per Shift Inspector/
dia.52.0 Operator/
3 Inner Dia 52,53 90.0 +1.0 Paddle Gauge ……….. 1 per 20 CMM
Engineer
54,55,56,
5 Thickness 5.0 ±0.10 Snap Gauge ……….. 1 per 20
57
Dent, damage, free No Dent, damage,
6 from burr & - Visual ……….. 100% Operator
burr & patchmark
patchmark
INPUT PROCESS FINISH BORE OPERATION
INPUT-PROCESS-OUTPUT SHEET
Part
Model Part No. Part Name Mod. Operation No. Operation Description Opn. Rev.
No.
3 Wheeler 22151106 Brake Drum Cast Iron 4 180 Boring & Facing 01' 04.09.201

PROCESS
FINISH BORE OPERATION METHOD
3M - METHOD

3.1 -OPERATION SEQUENCE

SR. N Activity Cycle sequence Time in Sec

1 Open Door 10
Uploading
2 Press foot switch & Unload component 10

3 Clean Jaw & Resting face Cleaning 10

4 Load component & press foot switch 5

5 Press foot switch & Center clamp 5


Loading
6 close door 5

7 Press cycle start 5

8 Machining cycle Machining 42

CYCLE TIME 92
AFTER FINISH BORE OPERATION
FINISH BORE OPERATION INSPECTION
PARAMETERS
OUTPUT CONDITION

SR.NO Defect Inspection


Parameter Specification Measured by Gauge No. Responsibility
. No. frequency

1 Inner Dia 59,60 170.00 Paddle Gauge ……….. 1 per 20


+0.10
2 Depth 68,69 31.00 ±0.20 Flush Pin Gauge ……….. 1 per 20

Cylinder Bore Inspector/


3 Ovality max. 66 0.10 mm ……….. 1 per Shift Operator/ CMM
Gauge
TIR Gauge / 1 per 20 / Engineer
4 Total Runout 58 0.06 mm Mahar ……….. (Mahr)1 Per
Roundness Shift
5 Face Runout 43 0.10 mm Dial Gauge ……….. 1 per 20

6 Radius - R1 Radius Gauge ……….. 1 per 20 Inspector

Surface Finish
7 67 Ra 6.3 Surface Tester ……….. 1 per Shift Inspector
on dia. 170.0
Dent, No Dent,
8 damage, free - damage, burr Visual ……….. 100% Operator
from burr & & patchmark
patchmark
INPUT PROCESS OF DRILLING TAPPING

INPUT-PROCESS-OUTPUT SHEET
Part
Model Part No. Part Name Mod. Operation No. Operation Descriptio Opn. Rev.

Brake Drum Cast No.


3 Wheeler 2.2E+07 4 190 6 Hole Drilling 01' 04.09.2019
Iron
PROCESS

LOCATING RESTING
(ID 52.0)
DRILLING TAPPING OPERATION METHOD

3M - METHOD

3.1 -OPERATION SEQUENCE

SR. NO. Activity Cycle sequence Time in Sec

2 Unload component . Unloading 5

3 clean Resting face. Cleaning 10

4 Load part on fixture. Loading 5

5 Press cycle start button. 5

8 Machining cycle Machining 32

CYCLE TIME 57
DRILLING TAPPING MEASURING
PARAMETERS

3.2 PROCESS PARAMETERS

Sr. Defect No. Cutting Insert / Drill Operation Cutting Feed in mm/min. Make
No. Tool Detail speed in
74,75,76, HSS Drill dia. 13.0 4 Hole Drilling Dia
1 Step Drill 649 192mm/min. SMITH
81,82 x 11.5 11.50
74,75,76, Counter HSS Drill dia. 9.0 2 Counter Drilling
2 649 192mm/min. SMITH
81,82 Step Drill x 4.70 x 90º Dia 4.70
AFTER DRILLING TAPPING

INPUT-PROCESS-OUTPUT SHEET
Part Operation
Model Part No. Part Name Mod. Operation Descriptio Opn. Rev.
No.
No.
3 Wheeler 22151106 Brake Drum Cast Iron 4 190 6 Hole Drilling 01' 04.09.2019

OUTPUT
DRILLING TAPPING MEASURING
PARAMETERS
OUTPUT CONDITION
Inspection Responsibilit
SR.NO. Parameter Defect No. Specification Measured by Gauge No.
frequency y
Dia 11.50+0.2
1 Hole dia. 74,75 Plug gauge ……….. 1 per 20
x4nos.
Dia 4.7+0.1
2 Hole dia. 81,82 Plug gauge ……….. 1 per 20
x2nos.

3 Counter 70,71 Dia 9 x 90° +0.1 Vernier Caliper ……….. 1 per 20


Inspector/
Counter Operator/
4 - 2.70 ±0.20 Flush pin Gauge ……….. 1 per 20 CMM
depth
Engineer
Angle
5 between 90°±0.30' Relation Gauge ……….. 1 per 20
two drill
Angle
6 between 45°±0.30' Relation Gauge ……….. 1 per 20
drill Dia
7 PCD 77,78,79 Dia 70.0±0.10 Relation Gauge ……….. 1 per 20
Dent, No Dent,
8 damage, - Visual ……….. 100% Operator
damage, burr
free from
TAPPING OPERATION
AFTER TAPPING OPERATION
INPUT-PROCESS-OUTPUT SHEET
Part Operation
Model Part No. Part Name Mod. Operation Descriptio Opn. Rev.
No.
No.
3 Wheeler ######## Brake Drum Cast Iron 4 200 2 Hole Drill Tap 01' 04.09.2019

OUTPUT
TAPPING OPERATION INSPECTION
PARAMETERS

OUTPUT CONDITION

SR.N Paramete Inspection


Defect No. Specification Measured by Gauge No. Responsibility
O. r frequency
Ø5.00±0.1- 2
1 Hole dia. Plug gauge ……….. 1 per 20
Hole
M6 x 1.0 mm - 2 Thread Plug Inspector/ Operator/
2 Tapping ……….. 1 per 20
Hole gauge CMM Engineer
Relation 1 per
3 PCD Ø 66.0±0.1 ………..
Gauge/CMM 20/1/Shift
Dent,
damage, No Dent,
4 Visual ……….. 100% Operator
free from damage, burr
burr
GROOVING OPERATION PROCESS
INPUT-PROCESS-OUTPUT SHEET
Part
Model Part No. Part Name Mod. Operation No. Operation Descripti Opn. R
No.
Face Grooving
3 Wheeler 2.2E+07 Brake Drum Cast Iron 4 210 01' 04.0
& Chamfering
PROCESS

CLAMPING

RESTING
LOCATING(ID
GROOVING OPERATION SEQUENCE
METHOD
3M - METHOD

3.1 -OPERATION SEQUENCE

SR. NO Activity Cycle sequence Time in Sec

2 Press foot switch & Unload component Unloading 5

3 Clean Locator & Resting face . Cleaning 10

4 Load component with clamp plate. 10

5 Press foot switch for Center clamping. Loading 10

7 Press cycle start 10

8 Machining cycle Machining 90

CYCLE TIME 135


GROOVING OPERATION MESURING
PARAMETERS
3.2 PROCESS PARAMETERS
Sr. Defect Cutting Cutting Feed in
Tool Detail Operation speed in Make
No. No. Tool mm/min.
m/min.
1 85,89 Brazed Tool BRZ TOOL ISO7 RH 2516 5.5MM Grooving 80 R.P.M 24 mm/min. ASHOK
2 85,89 Brazed Tool BRZ TOOL ISO 2 LH 2020 45˚ K 20 Chamfering 182.0 x 45 Deg 80 R.P.M 24 mm/min. ASHOK

3 85,89 Brazed Tool BRZ TOOL CHAMFER BT45X8X60 R/H Chamfering 0.5 x 45 Deg 80 R.P.M 24 mm/min. ASHOK

3.3 PROCESS CONDITION

METH Hydraulic clamping pressure in Pressure M/c


91 15-25 kg /cm2 Daily JH
OD Kg/cm2 gauge operator

TOOLI Cleanliness of part resting & Finish & clean By hand / M/c
………… Daily JH
NG clamping surfaces Resting Face visual operator
AFTER OPERATION
INPUT-PROCESS-OUTPUT SHEET
Part
Model Part No. Part Name Mod. Operation No. Operation Description Opn. Rev.
No.
Face Grooving &
3 Wheeler 22151106 Brake Drum Cast Iron 4 210 01' 04.09.2019
Chamfering
OUTPUT
AFTER TAPPING OPERATION INSPECTION
PARAMETERS
OUTPUT CONDITION
SR.N Inspection Responsibilit
Parameter Defect No. Specification Measured by Gauge No.
O. frequency y
Dia 202.0 ±
1 Groove ID Paddle Gauge ……….. 1 per 20
0.20
Dia 192.0 ±
2 Groove OD Paddle Gauge ……….. 1 per 20
0.20

3 Depth 14.0±0.2 Flush pin Gauge ……….. 1 per 20


Inspector/
Operator
4 Radius R 0.5 Visual ……….. Every tool change.

Chamfer
5 182.0 +1.0 Vernier Caliper ……….. 1 per 20
dia.
Groove
6 Chamfer 0.5x45' Visual ……….. 1 per 20
dia.
Bevel Protector/Std.
7 Angle 45°±30' ……….. 2 Per Shift Operator
Template
Dent, damage, No Dent,
8 free from burr damage, burr & Visual ……….. 100%
& patchmark patchmark
THANK YOU

You might also like