Professional Documents
Culture Documents
Definitioner KPI 20170523
Definitioner KPI 20170523
2 LWIR Lost hr *1
million/working hr
Production and
3 overhead efficiency Cost(RMB)/hour
8. FQC Defect rate - Produced defect quantity (end of line test) / Total
produced quantity
2. Defects found in the end of line control and
process audit and out of box audit
3. Supplier quality not included
4. Multiple defects in one machine should measure
as one defect
5. Safety and function related defects found in OOB
should be measured GQP-001
KPI Definition-3
9. IQC (PPM) - All incoming defect parts found in IQC or during
production, or from customer claims / All incoming parts x 1 000 000
1. Including bulk material (IDCO MCF)
2. 1 event divided with total received quantity (found in IQC)
3. Actual defect number divided with total received quantity
(if found in production line)
4. Rework, return, scrap =defect part
5. All incoming articles will be measured the same month
10. IQC (PPM) (excluding fasteners)- All incoming defect parts found
in IQC or during production, or from customer claims / All incoming parts x 1
000 000
6. Rework, return, scrap =defect part
7. All incoming articles will be measured the same month
excluding fasteners
KPI Definition-4