• Wi • Fire action
• Machine breakdown notification slip
• Daily operator checksheet
• Machine history card
• Patrol inspection report
• Monthly material consumption report
• Control plan
• Planned vs actual production data
• Ppe matrix • Production docket
• Insert life record • Process setup sheet
• Skill matrix • Daily maintenance sheet
To record Operator change, machine change, tool change, new operator, operator on leave, New
machine, new gauge & new instrument) and unexpected changes Tool breakage, power failure,
machine breakdown etc.
CHANGE √
LEGENDS =
NO CHANGE
6
WORK INSTRUCTIONS (WI)
7
DAILY OPERATOR CHECK SHEET
8
PATROL INSPECTION REPORT
9
CONTROL PLAN
10
PPE MATRIX
PURPOSE : The matrix directs users to which types of PPE to wear based on
certain work activities.
11
INSERT LIFE RECORD
12
SKILL MATRIX
A skill matrix is important because when it is set up well it can help you organize your
teams easily, identifying any skill sets that you need based on the project requirements
13
MAJOR DEFECT ANALYSIS
Defect analysis focuses on developing solutions to attack root causes of different commonly
occurring defects. The fact that a defect was found is the trigger to an improvement action with
the purpose to prevent such errors from happening again.
14
REJECTION MONITORING SHEET
15
KAIZEN SHEET
Kaizen philosophy is
developing a culture for
people engagement in
improving the organization
through small-small
continuous improvement in
daily work rather than one
large improvement at once.
16
QUALITY ALERT
17
DAILY POKA YOKE STATUS REPORT
MONTH
IDENTIFY 1 2 3 4
19
MACHINE BREAKDOWN NOTIFICATION SLIP
The breakdown
report create
when machine
completely
breaks down
and then
repairing it to
working order.
And write down
the timing of
accepting of
problem by
maintaince
dept.
20
MACHINE HISTORY CARD
21
MONTHLY MATERIAL CONSUMPTION REPORT
22
PLANNED VS ACTUAL PRODUCTION DATA
23
PRODUCTION DOCKET
PRODUCTION DOCKET
DATE
SR. NO. MACHINE NO. OPERATION OPERATOR PLAN ACTUAL MACHINE BREAKDOWN reason BREAKDOWN HOURS OTHERS
Sign. Shift
incharge
24
PROCESS SETUP SHEET
process parameters
machine parameters tools
1
2
3
25
Sign.
DAILY MAINTENANCE CHECKSHEET
A preventive maintenance
checklist details the tasks that
your technicians must complete
during a maintenance check.
26
DAILY WASTAGE FOOD MONITORING
27
PPM GRAPH CHART
REJ. PPM –
28
LINE PERFORMANCE BOARD
The board show the daily line performance , its include actual production ,
breakdown hours, rejections , reworks quantity, reasons etc
29
30