ELECTRICAL WIRING PLAN Demo
ELECTRICAL WIRING PLAN Demo
PLAN
-IS A TECHNICAL REPRESENTATION OF
ELECTRICAL SYSTEM PROPOSED TO BE
INSTALLED IN A BUILDING OR HOUSE.IT
INCLUDES MATERIALS,DEVICES AND EQUIPMENT.
Sample of electrical plan
PARTS OF ELECTRICAL PLAN
FLOOR PLAN-is a plan of a room or floor of a
building drawn to scale as if viewed from above.
Lighting lay out
LEGEND- shows the meaning of each
symbols used in the electrical plan.
LOAD SCHEDULE
• The following details can be seen in the schedule of load:
• Number of branch circuit of electrical wiring system
• Number of light outlet, power outlet
• Total wattage rating of the load per circuit branch
• Total current load per circuit and size of wire used
• Computation of the total power and current of each circuit branch.
• Size of conduit used for feeder line and branch circuits.
LOAD SCHEDULE
CKT NO. DESCRIPTION W V VA CKT BRKR. Size of Wire & Couduit
1 L.O (10)x 100 1,000 230 4.34 15 2.0 mm2 @PVC 15mm2
3 ACU (1.5) 746 1,119 230 4..86 30 5.5 mm2@ PVC 15mm2
Spare
Total 15,898 230 69.12 100 30 mm2 @ PVC 32 mm2
Guidelines
• 1. The Philippine Electrical Code provides that 100 watts be the
maximum load light outlet. Thus, for 9 light outlets at 100 watts,
multiply:
• 1. All electrical works herein shall be executed in accordance with the provision of the latest edition of
Philippine Electrical Code (PEC). The rules and regulations of locality and requirements of the power
company. 2.
All electrical works herein included shall be executed by experienced men under supervision of full time
licensed electrical engineer. Works shall be neatly placed, securely and properly finished.
• 3. All conduit shall be protected against damages by the entrance of water and foreign matter during
construction. All ends on conduits shall be plugged to exclude moisture and dust immediately after conduits
are placed. 4. Single conductor insulated THHN
thermoplastic shall be used. The min. size of wires shall be 3.5mm2 THHN for all lighting and power outlet.
5. Contractor must submit shop drawing of all panel board to the engineer prior for fabrication. Only one
brand of circuit breaker and only the approved panel board fabricator shall be utilized in the entire
project requirement. Use copper for circuit breaker and backyard fabricator of panel board is not acceptable.
6. Mounting height of devices shall be approved by RME and or as follows Panel board – 1800mm above
finished floor level to top of panel Wall switches – 1300mm above finished floor level to center of devices
Power outlet – 300mm above finished floor level to center of box
7. Upon completion of electrical works, the following tests shall be performed by the contractor inclusive of
the installation to be reported in details and in forms approved by _____. a. Insulation resistance phase
d. phase sequence test b. Phase balancing test e. functional test c. Voltage test
8. All dimensions are in millimeters unless noted otherwise. For exact dimensions refer to the architectural
plans.
LOCATION MAP
DIMENSIONS POINTS
1. Accuracy of Electrical lay-outs 20
4. Speed 5
ASSIGNMENT :
• Bring your tools tomorrow and we will have an installation of 3-way switch