02 BUILDER CONSTRUCTION ROUTINES (Autoguardado)

You might also like

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 15

Routines of a

builder in a
construction
BUILDER CONSTRUCTION ROUTINES

2023
Ground: 3. The builder does the
flattening.
1. The builder traces the area
where it will be built.

4. The builder digs the trenches


that will serve for the
2. The builder removes stones,
foundations.
branches, garbage and brush.
Foundation:
5. The builder pours the 6. The builder applies a
concrete into the holes and waterproofing membrane.
trenches.
Sewer system:
7. The builder prepares the
installation of the Sewer,
water faucet, and
everything that connects to
the drain.

8. The builder fills in to


cover it.
Structure:
9. The builder begins to 10. The builder assembles
erect the skeleton of the the column.
house.
11. The builder assembles 12. The builder fills
the formwork. columns.
13. The builder mixes the 14. The builder disassembles
concrete for the floor. the formwork.
16. The builder builds the
15. The builder builds
roof.
walls.
17. The builder installs exterior doors and windows.
Finishes:
18. The builder prepares the 19. The builder installs the
mix for facing. frames.
20. The builder places the 21. The builder installs the
interior doors and windows. tiles.
22. The builder performs 23. The builder installs the
textures on the walls. baseboards.
24. The builder installs bastions on railings.