1.The anchoring of the base plate of the structure was not done
properly as the length of the nail was 610mm and 260mm
(average) nailed inside the ground.
2. The Iron nails been used are not of same size.
3. The anchoring was not been done on each hole of the base
plate (4 holes available in each base plate).
4. The nylon rope of 14mm diameter been used for tying of
tarpaulin cloth was not strength enough to bear the tensile load
as it tear out with the due course of time.
South Yard:
3
HWT : 1 no. rest shed
4
ASU : Paint shed (DAMAGED)
5
ASU : 2nd rest shed (Ongoing New Installation work)
6
RECOMMENDATIONS :
1. BASE OF THE SHED TO BE FIXED PROPERLY. NOT WITH LOOSE SOIL OR NAIL. IT SHOULD BE FIXED WITH RIGID
FOOTING/RCC FLOOR .
OR
MAY BE SMALL ISOLATED FOOTING TO BE PROVIDED FOR EACH COLUMN.
4. DESIGN WIND SPEED TO BE CHECKED FOR THE STRUCTURE. PROPER TIE REQUIRED AT THE TIME OF WIND.
5. STRUCTURE PLACED IN VAST OPEN AREA , TO BE DESIGNED WITH PROPER BRACING ARRANGEMENT & FIXING DETAILS.
A SINGLE LOOSE MEMBER OR CONNECTION CAN CAUSE SERIOUS DAMAGE.
6. IT IS BETTER TO REMOVE THE TARPOULIN AT THE TIME OF WIND SPEED ABOVE 50-60 Km/Hr.
10. WORKING UNDER THE SHED DURING THUNDER STROME/HEAVY WIND TO BE AVOIDED.