Entities .1
• The small detail:
Total time in the system is 0.51h
Within a variance of 0.7
Nothing was left out of the system
because number in is equal to
number out=20
• Middle detail

Entities .2 •Total time in the system is 0.76,within a variance of 0.02


•And nothin was left out of the system because number in is
equal to number out=10
Entities .3
• Great detail
•Total time in the system is
0.76,within a variance of
0.02
•And nothin was left out of
the system because number
in is equal to number
out=10
Queues
• Bending
• Cutting
We can see that waiting time for
bending is longer than waiting time for
cutting.
The number of entities waiting to go
through bending process is:5.93
The number of entities waiting to go
through cutting process is: 2.03
Other
queues
• Grinding
Utilization
• Bending bench (process 1): utilization is 73
• Cutting bench (process 2): utilization is 18
• Grinding bench (process 3): utilization is 0

resources The number of resources busy on average is 0.73 for process 1, and for process 2 is 0.18.