Spring semester:2023 Entities .1 • The small detail: Total time in the system is 0.51h Within a variance of 0.7 Nothing was left out of the system because number in is equal to number out=20 • Middle detail
Entities .2 •Total time in the system is 0.76,within a variance of 0.02
•And nothin was left out of the system because number in is equal to number out=10 Entities .3 • Great detail •Total time in the system is 0.76,within a variance of 0.02 •And nothin was left out of the system because number in is equal to number out=10 Queues • Bending • Cutting We can see that waiting time for bending is longer than waiting time for cutting. The number of entities waiting to go through bending process is:5.93 The number of entities waiting to go through cutting process is: 2.03 Other queues • Grinding Utilization • Bending bench (process 1): utilization is 73 • Cutting bench (process 2): utilization is 18 • Grinding bench (process 3): utilization is 0
resources The number of resources busy on average is 0.73 for process 1, and for process 2 is 0.18.