Main purpose to develop this procedure is to avoid any PURPOSE nonconformance and more OF INR coordination between Metito’s different PROCEDU departments like RE Construction, Quality, Survey, Safety, Environment and Traffic. • INR Submission should be done as per approved Inspection Test Plan of respective activity. • Construction Team make sure INR all the completed activities INR SUBMISSIO being raised and approved. N • Subsequential activities are only allowed after the approval of previous activity INR by WSP. • No activities ‘mentioned in the BOQ’ shall be left uninspected. • Construction team should ensure in coordination with quality team that every excavation activity should be followed by Inspection Request. • Before starting excavation and trial pits setting out INR should be submitted and approved. • Before starting any excavation; trial pits, IMPORTAN existing services scanning, identification and marking to be done with INR.
T INRs • Trail pits, existing services scanning,
identification and marking INRs to be followed by OHSS team with WSP for approval. • Survey team should provide proposed survey data to QC for the respective work, QC team should raise the inspection along with proposed survey data to WSP, actual survey data will be provided by surveyor after inspection with GEC to the surveyor of WSP. Inspection Request received from construction team 24hrs in advance before 12:00
QA/QC to check for details & attachments e.g.,
drawings, survey data, checklist etc.
PROCESS CHART QA/QC to perform internal inspection before raising INR to GEC
FOR INR If Internal Inspection satisfactory, QA/QC to submit
INR to DC for submission to GEC 24hrs in advance
SUBMISSI Daily INR Submission schedule shall be circulated to
ON AND whole project team by DC by 3PM
CLOSEOU QA/QC to coordinate with respective GEC
representative for scheduling and inspection. During the inspection, owner of the work shall be available .
T In case of any noncompliance, owner of the work to
eliminate it immediately in full coordination with GEC to avoid official comments on INR
Incoming INRs to be distributed on daily bases by DC
to whole project team for their information about the approval status of INR MANDATOR Y DETAILS FOR INR • Inspection Date (Const Team) • Inspection Time (Const Team) • Previous INR (QC) • Description of work to be inspected (Const Team) • Discipline code (QC) • Method statement ref (QC) • ITP ref (QC) • BOQ No (QC) • MIR Reference (QC) INTERNAL INR PROCEDURE • INR request shall be received from site team along with the mandatory details and highlighted drawings on dedicated WhatsApp group or physically, along with internal inspection form filled. • The information/details received shall be verified by QC and if any information is missing should be completed by QC in coordination with respective site team. INTERNAL INSPECTION REQUEST FORM As per the instruction of Project Director Mr. Ashraf any activity caused loss of IMPORTANT money due to non NOTIFICATI inspection, the person ON responsible will face consequences and it may lead to salary deduction or even termination. THANKS