IP CN Weekly Report - W38
IP CN Weekly Report - W38
Weekly Report
Week 38
NE Name NE Count
Switches 28
Routers 1
BRAS 6
Firewall 1
Servers 7
IP Core Network Activities, Results & Achievements
SN Domain Activity Result/Achievements
4 Link POP NYALLA, YASSA, NDOGPASSI Down due to Fiber repaired to restore services but this link is not redundant.
IP fiber link cut
7 Followup of TV channel cracking issues. Description of interfaces are going to be done on the switch.
Capacity Management KPI
- Link between Switch TV and Kotto Switch still saturated. (proposed to change the
architecture)
- Interface 1/0/11 to decoder on Buea switch is saturated
- Interface 1/0/20 on Buea switch is saturated
Capacity Management KPI
- Interface congestions (port-channel1) on the core switch akwa is causing a lot of packet discards.
NE CPU/Memory Utilization KPI