Terms of COD
Terms of COD
Terms of COD
Sirodzul Munir
PT. Indokoei International
June 19, 2023
5 Back feeding To be carried out after GH ready of all PSP, GH, GI Dolsa, 29 July 2023
equipment and instrumentations and ready SLO Consultant
for individual test
6 Synchronization of Grid To be carried out once GH for RR Test PSP, GH, GI Dolsa, 1 Agustus 2023
SLO Conmsultant
Note: ASE must drop a notification letter to PLN UID Sumut once backfeeding and RR Test are ready
06/26/2023 aek sibundong mhpp 2x4 mw 4
Terms of Commissioning – by GH
3 Individual Test (Dry and Wet Test) To be carried out once water and back GH, PSP, GI Dry: 18.08.2023
feeding are ready Dolsa, ASE, SLO Wet: 28.08.2023
Consultant
4 Run and Reliability (RR) Test 3x24 hrs To be carried out once grid GH, PSP, GI 06.09.2023
synchronization are ready Dolsa, ASE, SLO
Consultant
Terms of
Terms of
Transmission Line
Terms of Water Commissioning
• Back feeding
Readiness • Individual Test
• Grid
• RR Test
Synchronization