Boston Market – TX/CX Sync

Agenda
• H-Frame Layout
• Fiber Provider Requirements
⮚ Crown Castle
⮚ Comcast
⮚ Cox
⮚ Verizon
⮚ Consolidated
⮚ FirstLight
• Questions

©2022 DISH Wireless L.L.C. All Rights Reserved | 8/18/2022 | Prepared by Jacques Young 2
H-Frame Layout
NOTE: PPC MUST be installed on LEFT side of H-Frame

Free for fiber provider (5)

TOP of PPC (4)

Free for fiber provider (3)

PPC
TOP of TELCO Box – BOTTOM of PPC (2)

TELCO Box BOTTOM of TELCO Box (1)

©2022 DISH Wireless L.L.C. All Rights Reserved | 8/18/2022 | Prepared by Jacques Young 3
Crown Castle Requirements
Crown Castle
1. One 10A -48DC Breaker
2. 2” schedule 40 PVC conduit to MMP
3. Pull string (mule tape) from TELCO box
to MMP

©2022 DISH Wireless L.L.C. All Rights Reserved | 8/18/2022 | Prepared by Jacques Young 4
Comcast Requirements
Comcast
1. Two 5A -48VDC breaker
2. 2” schedule 40 PVC
conduit to MMP
3. Pull string (mule tape)
from TELCO box to
MMP
4. 14 AWG wire breaker
hand off to Comcast
NID
Outside Inside

©2022 DISH Wireless L.L.C. All Rights Reserved | 8/18/2022 | Prepared by Jacques Young 5
COX Requirements
COX
1. Two 10A -48VDC breaker
2. 2” schedule 40 PVC conduit to
MMP
3. Pull string (mule tape) from TELCO
box to MMP

©2022 DISH Wireless L.L.C. All Rights Reserved | 8/18/2022 | Prepared by Jacques Young 6
Verizon Requirements
Verizon
1. One 5A -48VDC breaker
2. 2” schedule 40 PVC
conduit to MMP
3. Pull string (mule tape)
from TELCO box to
MMP
o Verizon NID installed in Dish Telco
Box
o Verizon will be installing a separate
NID enclosure in the future (30A
breaker will be required)
o Verizon allowed One (1) 10A breaker Outside Inside
in BDL but will require One (1) 5A
going forward ©2022 DISH Wireless L.L.C. All Rights Reserved | 8/18/2022 | Prepared by Jacques Young 7
Consolidated Communications Requirements
Consolidated
1. Two 5A -48VDC breaker
2. 2” schedule 40 PVC conduit to
MMP
3. Pull string (mule tape) from TELCO
box to MMP

©2022 DISH Wireless L.L.C. All Rights Reserved | 8/18/2022 | Prepared by Jacques Young 8
FirstLight Requirements
FirstLight
1. One 10A -48VDC breaker
2. 2” schedule 40 PVC conduit to
MMP
3. Pull string (mule tape) from TELCO
box to MMP

©2022 DISH Wireless L.L.C. All Rights Reserved | 8/18/2022 | Prepared by Jacques Young 9
Questions ?

©2022 DISH Wireless L.L.C. All Rights Reserved | 8/18/2022 | Prepared by Jacques Young 10

You might also like