220kv GIS Maintenance and Operation 1
220kv GIS Maintenance and Operation 1
252kV GIS
-1-
门 ABB 华电高压开关有限公司
-26-
Contents
SF6 Properties
Advantages of GIS
ABB GIS Products
ELK-14
GIS Operation
GIS Maintenance
Sulphur hexafluoride SF6
The properties
Inert, non-toxic
Electro-negative (electron-capturing)
Six times heavier than air
Global Warming
SF6 as Quenching Medium
Ball-plate-arrangement, 50 Hz ac
12.5 mm ball, 12.5 mm distance
HV - GIS: The compact substation solution
Advantages:
Reduced Space
System planning with high flexibility
Best for novel, creative solutions
More sites available
Power distribution on HV level
Reduced transmission losses
Fully metal-enclosed, safe
Prefabricated, factory-tested units
Fast installation
ABB GIS product portfolio
Rated breaking
current (kA) 40 50 50 63 63 50
ABB GIS Focus Factories In Europe
Output: Output:
GIS from 170kV GIS up to 170kV
up to 550kV
Another ABB GIS Focus Factory In Xiamen, China
Scope of activities:
Development, Manufacturing,
Engineering and Sales Support
Modules:
CB & Operating Mechanism
Disconnector & Earthing Switch
CT & VT
Connecting Elements
Local Control Cubicle
Circuit Breaker (50 kA)
ELK-14 CB Operating Mechanism - HMB4
ELK-14 CB Operating Mechanism - HMB4
Advantages of HMB-4
Energy
Stroke
Integrated Current Transformer
Voltage Transformer
Combined Disconnecting and Earthing Switch
Fast Acting Earthing Switch
Functional diagram
SF6 Gas Monitoring
CB
Other Compartments
Filling Pressure
Alarm Pressure
Blocking Pressure
220 kV GIS Engro Energy Power Plant
2
1. Alarm annunciator
3
2. Local/Remote control
3. LOGO
4. Interlocking/release switch
5. Push button
6. Position indicator
6
4
Alarm Annunciator
Interlocking/Release Switch
Using this switch to release the interlocking condition one must be very
CAREFUL.
After energizing please put the Interlock/Release and Local/Remote control
key in safe place by authorized person.
Manual operation of Disconnector and Earthing switch-ELK-14
Adjust position
2 1 3
1. Padlock
2. Crank opening
3. Interlocking magnet
Manual operation of Disconnector and Earthing switch-ELK-14
Daily inspection
First time after 1 year
Second time after 5 year
Third time after 8 year
Overhaul based on its health
condition
Maintenance-first time
After 5 year
Check the gas pressure
Dew point testing
Local Control Cabinet
Remote control
Insulation of the secondary control cable
Manual operation of DES,FES
Visual inspection of mechanism
CB characteristic
Primary DC resistance
Maintenance-third time
After 8 year
Check the gas pressure
Check the density monitor
Dew point testing
Local Control Cabinet
Remote control, check the remote signal and
protection
Insulation of the secondary control cable
Manual operation of DES,FES
Visual inspection of mechanism
CB characteristic
Primary DC resistance
Check the earthing
High voltage testing optional
Overhaul
3. Others
ABB will provide professional support when you need
and Please contact with ABB as soon as possible
Gas Tightness and Moisture Test