Plan FO Restoration

Sumbagteng Region
Segmen R. Baso Payakumbuh <> HOS Cokroaminoto
Root Cause Analysis & Mitigation

Segment name :
R. Baso Payakumbuh <> HOS Cokroaminoto

Segment Length :
± 44 Km

Root Cause Analysis :


Impact Cable cut get bitten by Squirrels and Rats, Location in hilly and forest
area around 4 Km

Action Plan Improvement :


Replace Cable Anti Rodent around 4 KM from Pole 01 site R Baso going to Pole
101 direction to site Hos Cokroaminoto

Impacted to :
Repetitive trouble ticket and unstable performance

Detail Mitigation Plan


No Mitigation Action Status Timeline
1 Cutting tree around the Cable Done 4 July 2023 
Restoration Temporary Plan & Timeline
A. Survey Result B. Restoration Activity
• The existing cable from site to Pole 101 has impact bitten by squirrels and Rats
(Red line in KMZ)
• Propose replace to cable Anti Rodent (Gray Line in KMZ)

C. Formation Actual Team


• Corrective Team (1 jointer, 1 helper using blind van)
• Civil Team for replace cable activity (4 PIC, using pickup)
• Civil Team for patrol activity (2 PIC using motorcycle)

D. Restoration Timeline
No. Work Item July 2023 August 2023
    6 7 8 9 10 11 12 13 14 15 16 24 25 26 31 1 2 3 14 15 16 17 18
1Replace Cable Anti Rodent From site Baso to Pole 101 around 4 Km         Batch 1 : 2Km               Batch 2 : 2Km
2Pole Elevation : 2 Pole                                              
3Permanent Closure : 2 unit                                              
4Replace Cable Anti Rodent 200m near of main road Raya Bukit Tinggi                                              
5Replace Cable Anti Rodent 300m infront of Padang Panjang Station                                              
6Replace ODP to Closure and Connected to OTB site                                              
7Insert 1 Pole between Pole 101                                              
8Insert 1 Pole at distance 500m from site Hoscokroaminoto                                              
9Repair 1 Pole at distance 200m from site Hoscokroaminoto                                              
10Additional 1 Pole 9m at distance 800m from site Hoscokroaminoto                                              
Action & Evidence at cable from Site Baso to Pole 101 goes to Site Cokro
Plan Replace to Cable Anti Rodent
A. Condition Before B. Condition After
Cable cut due to bitten by Squirrel Evidence on Progress

Pole 101
Action and Evidence at Closure Temporary
A. Condition Before B. Condition After
Action temporary closure by cassette Evidence on Progress