METHODS OF

EXECUTING
MRP
SAP S4 HANA PP 1

VW SAP Consultant
AGENDA: METHODS OF EXECUTION OF MRP
 Total MRP
 Online
 Background Job

 MRP Planning Sequence


 Single Item Planning
 Interactive Planning
 Scope of Planning
 MRP Live

VW SAP Consultant 2
METHODS OF PLANNING

VW SAP Consultant 3
MRP RUN – PLANT LEVEL

VW SAP Consultant 4
PLANNING SEQUENCE

VW SAP Consultant 5
SINGLE ITEM MRP

VW SAP Consultant 6
INTERACTIVE PLANNING MRP

VW SAP Consultant 7
MRP LIVE

VW SAP Consultant 8
SCOPE OF PLANNING IN MRP

VW SAP Consultant 9
CONTROL PARAMETERS FOR MRP RUN

VW SAP Consultant 10
AGENDA
 MRP control Parameters
 Processing Key
 MRP lists generation
 Planning mode
 MRP Live control parameters

VW SAP Consultant 11
CONTROL PARAMETERS FOR MRP

VW SAP Consultant 12
CONTROL PARAMETERS FOR MRP
 Processing key: you define the planning type as regenerative planning or net change
planning over the whole period or restricted to the planning horizon.
 The indicators "Create purchase requisition" and "Schedule lines" are only relevant
for materials that are procured externally. You can determine whether or in which
period purchase requisitions and schedule lines are required as the result of the
planning run.
 You can determine further whether the planning run is to generate MRP lists. It is
also possible to have the system generate MRP lists only when certain exception
messages have appeared for a material.
 The planning mode defines whether the existing planning data should simply be
adjusted, whether BOMs and routings should also be re-exploded or whether the
planning should be started from the very beginning again.

VW SAP Consultant 13
SCOPE OF THE PLANNING RUN

VW SAP Consultant 14
MRP LIVE CONTROL
PARAMETERS

VW SAP Consultant 15
THANK YOU

VW SAP Consultant 16