Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 2

Key Description

1 Hot water to preheat


parts and rinse
2 Hot ND10/Water
3 Insulate jacket and lid

900 litre IBC


1 2 with verified
ND10/water
New Method
• 1 –Make 900 litres bulk batch of ND10/water at 25%/75%
• 2- Add titration checks to control plan to verify ND10 ratio
is correct for each batch
• 3 -Buy and install additional water boiler to preheat
ND10/water mix and supply 22.5 litres to barrel
• 4 – Insulate barrel and lid to optimise heat retention in
current process and verify the effect with a further
temperature survey on heat loss
• All the above action points will be completed by 22/01/16

Theo Speller SQE 15/01/16