Additional Control Measures for Accident Prevention

S. Non Additional controls By who By when Status

EHS reinduction for all team members. EHS & Site Team Closed
1 13/03/2023

Awareness-raising in villages and schools. Admin/Site Team/EHS Ongoing


2 15/03/2023

Chaque fois que


Section length KEC shall limit the maximum length to 6 km Site Team /EHS la situation se Closed
3 présente

For close surveillance and to restrict the movement of local


villagers/vehicles/animals, additional local maneuvers/safety commissioner
equipped with red flags, binoculars/walkie-talkies will be mobilized on the Admin/Site Team/EHS Closed
4 access roads crossing the line and each span of the section when the driver is 17/03/2023
firing and pilot firing is in progress.

The speed of the tractor will be limited to 10 km/h during the pilot pulling
Site Team/EHS Ongoing
activity.
5 15/03/2023
Evidence on the Action Plan
Evidence on the Action Plan
Evidence on the Action Plan
Evidence on the Action Plan
Evidence on the Action Plan