Routine Checks

Boiler

July 23, 2023 PMI Revision 00 1


Main Boiler
 BOTTOM ASH HOPPER
SEAL TROUGH & HOPPER CONDITION
 FIRING FLOOR

 FIRING ARRANGEMENT

 BURNER TILT MECHANISM

 SECONDARY AIR DAMPERS

 FLAME CONDITION

 PEEP HOLE/MANHOLES

 PF LEAKAGE

 MULSIFIER SYSTEM
July 23, 2023 PMI Revision 00 2
 BOILER TUBE LEAKAGE (INTERNAL OR EXTERNAL)

 BOILER SUPPORTS

 BOILER EXPANSIONS

 SAFTY VALVE PASSING

 WATER WALL SOOT BLOWERS & LRSB ‘S

 ECONOMISER HOPPERS

July 23, 2023 PMI Revision 00 3


Boiler Auxiliaries
AIR PRE HEATERS
 DRIVES
 ANY ABNORMAL SOUND
 OIL LEVEL
 AIR MOTOR STAUS
 SOOT BLOWERS

 GUIDE & SUPPORT BEARINGS


 OIL SUMP LEVEL
 OIL COOLING SYSTEM
 HOT AIR LEAKAGE
 OIL FLOW & PRESSURE

 INFRA. RED DETECTION SYSTEM

July 23, 2023 PMI Revision 00 4


Boiler Auxiliaries
INDUCED DRAFT FAN
 LUBE OIL SYSTEM
 OIL LEVEL
 OIL PRESSURE, ADJUST IF REQD.
 FILTER CHOKING & OIL COOLERS
 ANY ABNORMALITY IN RUNNING PUMPS
 HYDRAULIC COUPLING
 WORKING OIL LEVEL
 W.O. PRESSURE
 FILTER CHOKING & OIL COOLER STATUS
 BEARING / OIL COOLER TEMP.
 ANY ABNORMAL SOUND

July 23, 2023 PMI Revision 00 5


Boiler Auxiliaries
FORCED DRAUGHT FAN

 LUBE OIL SYSTEM


 OIL PRESSURE & FLOW
 OIL COOLERS & FILTERS
 CONTROL OIL PRESSURE (Blade Pitch Control)
 ANY ABNORMALITY

July 23, 2023 PMI Revision 00 6


Boiler Auxiliaries
PRIMARY AIR FAN
 LUBE OIL SYSTEM
 OIL LEVEL & PRESSURE
 FILTER CHOKING & OIL COOLERS
 ANY ABNORMALITY IN RUNNING OIL PUMPS
 HYDRAULIC COUPLING
 WORKING OIL LEVEL
 W.O. PRESSURE
 FILTER CHOKING & OIL COOLER STATUS
 BEARING / OIL COOLER TEMP.
 ANY ABNORMAL SOUND IN FAN/MOTOR

July 23, 2023 PMI Revision 00 7


Boiler Auxiliaries

MILLING SYSTEM
 LUBE OIL SYSTEM – PUMP ,FILTERS, OIL LEVEL
 OIL COOLING SYSTEM
 MILL ROLLER SYSTEM
 MILL REJECTION STATUS
 ANY INTERNAL ABNORMAL SOUND
 ANY P.F. LEAKAGE
 MILL FIRE FIGHTING SYSTEM

July 23, 2023 PMI Revision 00 8


Boiler Auxiliaries
GRAVIMETRIC FEEDER
COAL FEEDING THRU’ VIEW GLASS
CLEAN OUT CONVEYOR
INTERNAL LIGHT
ANY ABNORMAL SOUND

SCANNER AIR FAN


SUCTION & DISCHARGE DAMPERS
PHYSICAL ABNORMALITY
EMERGENCY DAMPER STATUS

SEAL AIR FAN


SUCTION & DISCHARGE DAMPERS
ABNORMAL SOUND
DISCHARGE HDR. PRESSURE.

July 23, 2023 PMI Revision 00 9


Boiler Auxiliaries
BOILER CHEMICAL DOZING
 PREPARATION & STORAGE CHEMICAL TANK LEVELS
 PUMPS
 ANY CHEMICAL LEAKAGE
 LINE FLUSHING

BOILER BLOW DOWN


BLOW DOWN TANKS
BLOW DOWN LINES (CBD , IBD, EBD )

July 23, 2023 PMI Revision 00 10


Boiler Auxiliaries
ELECTROSTATIC PRECIPITATOR
 FIELD CHARGING

 FIELD CURRENT, VOLTAGE & SPARK RATE

 COLLECTOR & EMMITTER RAPPING MECH.(INT. & CONT. MODE)

 RECTIFORMER HEALTHINESS

 HOPPER EMPTYING STATUS

 DE ASHING STATUS

July 23, 2023 PMI Revision 00 11