Glico

18/05/2012

C2 General
Executive Summary
• 17/05/2012 – A high number of alarms was observed on
the Node A, as a result it was reconfigured.
• 18/05/2012 – A follow up visit confirms no new alarms.
• 18/05/2012 – Repeater no longer locks onto locks onto cell
with BCCH 54 (Please refer to handover doc). New sites
including 57 and 53, were observed. This suggest that
some changes has been made to the serving site. Same
phenomenon was observed at UT Bank before the solution
was put in there.
• 18/05/2012 – A lot of dirt has accumulated on the
repeater.

C2 General
Alarm Summary 17/05/2012

C2 General
Status after reconfiguration 17/05/2012

C2 General
Alarm Summary 18/05/2012

C2 General
Status 18/05/2012

C2 General
Different Servers on the same call

C2 General
Node A

C2 General
Node A

C2 General
Node A

C2 General
End of Report