BM-BC PLAN DEC 2020-

MAY2021
WORK DETAILS

TOTAL WORKS PLANNED TOTAL WORKS


TOTAL WORKS BALANCE
NOV 2019 - MAY 2020 COMPLETED

37 18 19

TOTAL WORKS
PLANNED IN THIS OLD WORKS (PARTIALLY
NEW WORKS
SEASON DONE + NOT STARTED)
DEC 2020 - MAY 2021

29 19 10
‫דׂ ‪ ֥֛ -‬דׂ ׋ ׫׍ כ ‪2019-2020 ؋‬‬
‫׉וכ ֵْ ׎ ד‬ ‫ח׫‪ ؋‬ׅד ׋ גֺׅ׫‪֛ ؋‬וד֫‬
‫׀ ׀‬
‫ ׋ ד׌ ּ ג ֛ ׌ ׹ ׭ ׀ ח׫‪ ؋‬ה֫ ׆ דׯ ג ־ וت ׋ ׅ וכ ֵ ׅ ֛ו §‬

‫ס‪2020‬‬ ‫׬ׄ כ ׅׄ‬ ‫׀ ח׫‪ ؋‬ג ׎ה֫ ‪ ؋‬׆ ד־דׯ גוتת ד‬

‫‪ ᅃ‬וؗ כ ְ ؛ ג ת‬
‫֞ד׆‪ ᅃ‬וـ‬
‫׉וכ ֵْ כ ֫ ‪ ٝ‬ؗ‬ ‫‪‡100‬‬
‫׀ ֛ ‪؉‬׋֥׫‪֫ %)؋‬ד‬ ‫‪34‬‬

‫‪ ᅃ‬؛ ג ת ׃ ֭ג ד֫ ׄ גׅ ד‬
‫׉וכ ֵْ ‪ ٝ‬כ ְ ‪ٝ‬‬ ‫׋ ׫‪֫ ؉ ֛ ؋‬ד ֥‬ ‫׀‬ ‫‪3‬‬

‫׭ْ ׀ ח׫‪ ؋‬ׅד גׅ ‪100%‬‬ ‫׀ ׋ ׫‪֫ ؋‬ד‬ ‫‪18‬‬

‫׭ْ ׎ ג ֽ ד׺ ׀ ח׫‪ ؋‬ׅד ג ׯ ג ת ׃ ֭ג ד֫ ׄ גׅ ד‬ ‫׀ ׋ ׫‪֫ ؋‬ד‬


‫‪3‬‬
‫‪ ᅃ‬؛ גת (‬
‫ˆ ׀ ֫ ג ׆ ْ֛ ‪ ٝ‬כ ְ ‪ٝ‬‬
PLANT AND MACHINARY ABSTRACT

TOTAL NO: OF PLANT : 5


TOTAL NO: OF PAVER: 9

2 STAND BY SP02 NORTH SIDE - PALAKKAD


SP05 SOUTH SIDE - TRIVANDRUM
TOTAL NO: OF ROLLER: 8
DIRECTOR WISE QUANTITY AND AMOUNT FOR THIS SEASON
Sl No: Director Works Quantity (m3) Amount Remarks

DBM 22235.907
1 AJI KTK 39.39cr
BC 16005.1
DBM 23950
2 ANANDAN BM 1767.385 22.60cr
BC 23308.49
3 PADMANABHAN MSS 2069 4.88lakh
DBM 20750
4 PRAKASHAN BM 6794.6 45.66cr

BC 13961.52
DBM 8827
5 RAJAN BM 2262.755 19.71cr
BC 6642.18
DBM 4230.85
6 SURENDRAN BM 3094.755 14.28cr
BC 7647.735
BM 100
8 SURESH BABU 1.14cr
BC 228
TOTAL 143.385cr
DIRECTOR WISE AMOUNT DETAILS FOR
BM - BC DEC 2020- MAY 2021
OLD NEW
SL NO: DIRECTOR TOTAL AMOUNT REMARKSNew works
WORKSAMOUNT WORKSAMOUNT

1 AJI KTK 25.95cr 13.44 cr 39.39cr Thampuattikkal phase 1 and 2

2 ANANDAN 19.20cr 3.95cr 23.16cr Periodical Renewal

3 PADMANABHAN 4.88lakh 4.88lakh Valiyzheekkal

16.16cr 45.66cr Kodanjeri,Kuttyadi,Bankroad,Koolima


4 PRAKASHAN 29.50cr
d

5 RAJAN 17.20cr 2.51cr 19.71cr Meenangadi ambalavayal

6 SURENDRAN 13.04cr 1.24cr 14.28cr Korappuzha,chalikkara

7 SURESH BABU 1.14cr 1.14cr Mathrubhumi

TOTAL 106.085cr 37.3cr 143.385cr


PAVER AND ROLLER DETAILS
PAVER MODEL YEAR ROLLER REMARKS
SP01 IR TITAN 4360 2003 VRR 2 Nadukani
Naduvannur,Anelakkadav,Villia
SP02 AP600 2005 VRR 12 ppalli,MP Road,Manandavady
SP03 AP800 2015 VRR 15 Hill highway kolichal

SP04 AP800 2017 VRR 5 Karamana

SP05 AP800 2017 VRR 6 Kattampalli

Tirur Kadalundy,Coastal
SP06 WIRTGEN SUPER 1400 2018 VRR 13
Highway
SP07 AMMANN AFT500 2018 VRR 12 Nattukal Thanau

SP08 WIRTGEN SUPER 1400 2019 VRR 1 Hill highway kolichal

Kakkat kaiveli
SP09 WIRTGEN SUPER 1400 2019 VRR 16
֩‫ ؛ ג ת ־ דؗ ֛ו ؛ ג ת ׇ ד׬ ל ׆ ג‬ᅃ ְ ‫כ‬ ᅃ
, ‫֛ו‬
‫ ה֫ ׆ ד׺ ֺ ו ׄ ג ׅ‬؋‫׉ ו כ ֵْ ׀ ח׫‬ ‫ ׹ ד֫׭‬؋‫׫‬
‫׀׋ ד׌ ּ ג ֛׋ ׌‬

‫ל ׀ ׆ ס؛ ג ־ ׇ ס ד־ כס ׇ‬
‫ ؛ ג ת‬ᅃְ ‫ כ‬ᅃْ‫׭‬ ‫ד׺ ֫ד‬؋‫ ׀ ֫ה ׋ ׆׫‬؋‫׭ْ ׀ ח׫‬ ‫ ֫ד‬؋‫׀ ׋ ׫‬
SL No: ‫סׇ‬٧ ‫׫ع‬ ‫ׄד ג‬
ׂ‫׎ ס‬ ‫ג׈ ת‬
100% ‫ד‬ ‫ׄ גׅ‬ ֫‫ד‬ ֭‫׃ ג‬ 100% ‫ד‬ ‫ׄ גׅ‬ ֫‫ד‬ ֭‫׃ ג‬

Utility shifting issue,Not achieving


subsoil improvement as planned,
rain, Unavailability of mix vehicle,
corona lockdown : Hill highway
1 3 2 2 2 3 kolichal and kattampalli
֛‫כ ׀ ׆ דל ׹ ג‬ Approach road issue :
Mambaram bridge work not
started

Ayancheri - temporarily stopped


MP Road - Utility shifting issue
Balance 8 works was not able to
2 ֺ‫ג ׄ ׆ לد ׆ ד‬ 19 1 9 7 11 complete due to corona
lockdown

3 ֵ‫׆ ؚــــــ‬ ֧‫ד‬ ‫ׯ‬ 8 0 7 1 1 Nadukani final level submitted


but only 300m BC balance
‫ל ׀ ׆ ס؛ ג ־ ׇ ס ד־ כס ׇ‬
‫ ؛ ג ת‬ᅃְ ‫ כ‬ᅃْ‫׭‬ ‫ ֫ד‬؋‫ ؛ ג ת׀ ׋ ׫‬ᅃְ ‫ כ‬ᅃْ‫׭‬ ‫ ֫ד‬؋‫׀ ׋ ׫‬
ׂ‫׎ ס‬ ‫ג׈ ת‬ ‫סׇ‬٧ ‫׫ع‬ ‫ׄד ג‬
SL No:
‫ד‬ ‫ׄ גׅ‬ ֫‫ד‬ ֭‫׃ ג‬ ‫ד‬ ‫ׄ גׅ‬ ֫‫ד‬ ֭‫׃ ג‬
100% 100%

Tirur kadalundi, Coastal


highway : Utility shifting
4 ‫׀ ג׈ׯ גֵ ס‬ 3 0 0 3 3 issue, Rain, Corona
lockdown
Palakkad :

5 ֺ֛ ‫ד׆ ו ׋ ־ ؓ ׀ ו׆‬ 1 0 0 1 1 Out of 5km Stretch 3 km


completed
DIRECTOR,TEAM AND PAVER THIS SEASON
SL NO DIRECTOR TEAM TEAM HEAD PAVER REMARKS

SP09,SP03, MP Road. Palakkad,


1 ANANTHAN 1 SREENIVASAN
SP07,SP02 Villiappalli,
Villiappalli 7/560 -
2 ANANTHAN , VALSAN 2 SHIJILESH ,SURESH SP09
10/000

Nadukani,
3 AJI .KTK 3 RAJEEVAN SP06
Tamburattikkall 1 and 2

4 AJI .KTK 4 MANOJAN SP06 Tirur, Coastal

Hill highwaykolichal,
5 PRAKASAN, PADMANABHAN 5 VIMOSH SP08,SP03
mambaram,Kattampalli

East Hill,
SURENDRAN, RAJAN,SURESH SP04,SP01,SP
6 6 SHIBI , VIKESH Mannur,Chalikkara,
BABU 05
Karamana, Mathrubhumi

Bank road, Kuttyadi,


7 PRAKASAN ,RAJAN 7 CK.SREEJITH SP03
kodancheri
PLANT WORKING DAYS DETAILS FROM NOVEMBER 2019 TO
MAY 2020

TOTAL TOTAL NOT


PLANT NUMBER DAYS WORKED WORKING REMARKS
FOR SEASON DAYS DAYS

PERINGOM 213 89 124

THAMARASSERI 213 115 98 Rain,plant repair,site


not
AYKKARAPPADI 213 80 133 ready,Unavailability
of bitumen,corona
lockdown for 2
PALAKKAD 213 86 127 months

TRIVANDRUM
92 10 (March and May) 82
(Jan to april)
PLANT WORKING DAYS DETAILS FROM DECEMBER 2020 TO MAY 2021

TOTAL NUMBER TOTAL DAYS TO BE


PLANT REMARKS
DAYS FOR SEASON WORKED

PERINGOM 151 80 143 days balance

THAMARASSERI 151 151 Full days works are arranged

AYKKARAPPADI 151 30 121 days balance

PALAKKAD 151 122 29 days balance

TRIVANDRUM 50 50 Only one work to be done


BALANCE WORKS AND QUANTITIES FOR NEXT SEASON

PERINGOM PLANT

QUANTITY QUANTITY
C NO WORK MIX ACHIEVED REMARKS
(m3)
(%)
7782 Hill highway Kolichal DBM 7600 26
cherupuazha road
BC 6000 0
DBM 4150 18
Kattampalli Kadav
7880
Koovery Chapparappadavu BC 3900 0

BM 178 0
Mambram Bridge across
6988
Anjarakandy River
BC 130.96 0
BALANCE WORKS AND QUANTITIES FOR NEXT SEASON

THAMARASSERI PLANT
QUANTITY
QUANTITY
C NO WORK MIX ACHIEVED REMARKS
(m3)
(%)
BM 1232.6 0
Vellikulangara Onchiyam
7888
Kannukkara Madakkara Road BC 739.56 0

DBM 376 88
6900 M P Road
BC 2996 46

Villiappally Edacheri Iringannur DBM 487.81 0


8054
road 1/000 to 3/500 BC 292.69 0
Entrance road for Ladder hotel BC 391.38 0
7949
cum resort, Wayanad
BM 369.88 0
Ayanchery - Kampanipeedika - Temporarily stopped
7978
Kadameri - Thannerpanthal BC 214.5 0
BALANCE WORKS AND QUANTITIES FOR NEXT SEASON

THAMARASSERI PLANT
QUANTITY
QUANTITY
C NO WORK MIX ACHIEVED REMARKS
(m3)
(%)
CRF - Naduvannur- BM 357.5 78
7981
Mandhankavu - Muthambi BC 742.5 59
BM 1825.63 37
7979 CRF - Koilandy Anelakkadav
BC 1680 0
DBM 2537 13
8000 Mannur- Chaliyam Road
BC 2396.06 0
DBM 1693.85 53
6844 Easthill ganapathikavu
BC 2212 0

Villiappalli Edacheri Iringannur


7924 BC 450.12 0
road between Km 7/560 to 10/000

5750 Chittarikkadavu MSS 2069 0


BALANCE WORKS AND QUANTITIES FOR NEXT SEASON

AYKKARAPPADI PLANT

C NO WORK MIX QUANTITY (m3) REMARKS

BC work almost completed and only


5780 Nilambur Nadukani BC Work almost Completed 30m3 balance at interlock
portion,final levels submitted
BALANCE WORKS AND QUANTITIES FOR NEXT SEASON

PALAKKAD PLANT
QUANTITY
C NO WORK MIX QUANTITY (m ) 3
ACHIEVED REMARKS
(%)
DBM 23574 37
6000 Nattukal to Thanau
BC 15852 17

DBM 1440 82
7458 Tirur kadalundi
BC 4590 0

DBM 7446.915 11
7878 Coastal Highway
BC 4349.1 0
BALANCE WORKS AND QUANTITIES FOR NEXT SEASON

THIRUVANANTHAPURAM PLANT (HIRE)

QUANTITY
C NO WORK MIX QUANTITY (m )
3
ACHIEVED REMARKS
(%)

DBM 8827 25
Karamana
7585
Kaliyikkavila
BC 4950 0
‫‪BM-BC PROGRAMME NOV 2019 - MAY 2020‬‬
‫׭֭‬ ‫׹‬ ‫ֹו‬

‫‪‬‬ ‫׆ ו֨ ו ת ׀ סׄ‬ ‫ל ׆֨ ־ דؗ ס ؛ ג ־ ׇ ס ד׬‬ ‫סׄ חؗ׎ ֛ׅׄ‬ ‫ס‬ ‫׉ דל ׈ ֫‬ ‫׎ ئ ֫ו‬ ‫ם‬


‫׋ כ ׆‬ ‫דع ‪٧‬סׄ‬ ‫ג ֵ ול ׯ ‪ ؇‬ד‬ ‫כ֫‬ ‫ؗד׆ ו ؗ ו‬ ‫ؗ‬ ‫‪.‬ס׋‬ ‫׉ דל ׈ ֫‬ ‫׎ ئ ֫ו‬ ‫ם‬ ‫דع ‪٧‬סׄ‬
‫׉כ ‪ ؋‬׆כ ؚ ד؂ד׆ ו ؗׯ ג ת֥‬ ‫וْ׀ ׅ ׋ג ׎‬ ‫‪.‬‬ ‫ׅד‬ ‫׀ וֺ‬ ‫ד׬‬ ‫ׅד‬ ‫׆ הֺ‬ ‫׆ ו֨‬
‫׎ ֛ׅׄ‬ ‫׆ ו֨‬ ‫׎ ئ דל ׈ ׯ ס‬ ‫ם‬ ‫ל ׄׄ‬ ‫ג ֺْ‬ ‫דع ‪٧‬סׄ‬ ‫ג ֵ ו ׯ וؗ וت ו‬ ‫‪.‬כ ֫‬
‫ג‪؇‬‬ ‫וכ ֫‬ ‫ֺ֝‬ ‫ס‬ ‫֛ו‬ ‫סׇ ׅ‬‫؛ ג ־ ׇ ס ד־ כ‬ ‫֛ו‬ ‫ס ׅ‬‫׎ ئ ד־ ל ׇ‬ ‫ם‬ ‫־ ْ֛‬ ‫׋ ׫‪؋‬‬ ‫׀‬
‫ד‬ ‫ׄ ׄ גׅ‬ ‫ו ؗ ו ׎ ו֭‬ ‫‪.‬ל ׀ ג ֫‬ ‫׬֮ ג ׋ ّ׌ֺّ֝‬ ‫؂׹‪ ؇‬׉סד‬ ‫׎ ئס ׆‬ ‫ם‬ ‫׋ כ ׆‬
‫ג ֵ ו ׯ ו ؗוו ‪ ؇‬ס‬ ‫‪.‬כ ֫‬
‫‪‬‬ ‫ּّ֛֞‬ ‫ד‬ ‫כ ַׇ‬ ‫֫֞‬ ‫וؗ‬ ‫׎ ئ ד־ ס‬ ‫ם‬ ‫ּّ֛֞‬ ‫דع ‪٧‬סׄ‬ ‫ג ֵ וׯ ג ת‬ ‫כ֫‬
‫׀ ئ וؗ ו‬
‫‪‬‬ ‫׬֮ ג ׋ ّ׌ֺّ֝‬ ‫׉ד‬ ‫؂׹ ו֨‬
‫ס׆‬ ‫׎ ئ דל ׈ ֫‬ ‫׆ ‪ ؇‬סם‬ ‫؛ ג ־ ׇ ס ד׬‬ ‫־ דؗ ֛ו‬
‫ג ֵ ו ׯ ו ׋ ג ת דع ‪٧‬סׄ‬ ‫׀ ئ וؗ ו כ ֫‬
‫‪‬‬ ‫׭‬ ‫ד ؛ ג ־ ׇ ס ֫ו‬ ‫ֵ֟ ־ ד׫‪؋‬‬ ‫וؗ‬ ‫׋ ג ת֫ ׀ ׆ ׄ ג ׋ ֽ ד ד ׋ ׎ ׹ ׭ּ‬ ‫ׯ ו‬
‫׎ ג ֽ ד׺ ו‬
‫‪‬‬ ‫ס ׀ ׅ ׫ ׭ ׍ ת֥ׄ ‪,‬ל ׇ ג ׉ ׫‪,‬ל ׀ ׋ ׫‬ ‫׎ כ‬ ‫׫ׇ דؚــــــׅ׋ ؗד ֥‬ ‫ג׭‬ ‫׋ ׆ ול آ‬
‫׆ ֛‬ ‫׀ ֫‬ ‫׎ ֛ ׋ ֽד ג ־ ֛‬ ‫ג ‪ ؇‬ס ׀ ئ ו ؗــــــــֺ ס כ ְ إ ג ת‬ ‫כ֫‬ ‫֛ו‬ ‫סׇ ׅ‬ ‫׎ ئ ד־ כ‬ ‫ם‬
‫֛ו‬ ‫סׇ ׅ‬ ‫־ ْ֛ ؛ ג ־ ׇ ס ד־ כ‬ ‫׋ ׫‪؋‬‬ ‫־ ד׬ ׯ ו ؗــــــــדب׀‬
‫׭‬ ‫֫‬ ‫־ ّ ו־ ֺ‬

‫‪‬‬ ‫ּّ֛֞‬ ‫׭ْ‪ ᅃ‬כ ְ ‪ ᅃ‬؛ ג ת‬ ‫ד ׀׎ ׅׄ׋ י ‪ ؋ ؋‬ד֫ ס‬ ‫ס֫֞ כ ַׇ‬ ‫ג ֺ‪؋‬‬
‫׹ כ ־֝ ‪.‬׋ ׆ וؗ ו כ ֫ ג ֵ ו ל ׯ ‪ ؇‬ד דع ‪٧‬סׄ ם ׎ ئ ֫ו ׭ ׯ ס ئסׄ כ ֫ ג ‪ ؇‬ס‬
‫׋ תׄ ؛ ג ת‬ ‫׋ ו׎ סׇ׊ו‬ ‫‪.‬׋ ׆ ו ؗו כ ְ ל إ ‪؇‬דם ד‬
‫‪‬‬ ‫؛ גת‬ ‫‪ ٝ‬כ ְ‪ᅃ‬‬ ‫׬ْ‬ ‫׀ ׋ י ‪؋‬׭ْ ד֫ ׀ ׭ו ֺ ׯ ׅד ֵד ׅ ד‬ ‫ד֫‬
‫׭֡‬ ‫ׄ׭ל ْכ ׀ׯג ْ ֭ ג تג ׄ ו ל‬
‫דכآ ־ ג‬ ‫׊ו ֽ ד ׋ תוؗ‬ ‫ו וׂג‬ ‫ׯ‬ ‫‪.‬‬
‫‪‬‬ ‫׀ ׊ׯ ֛‬ ‫ל ׇ ג ׉ ׫‪,‬ל ׀ ׋ ׫ כ ְ ؗ‬ ‫׫ׇ דؚــــــׅסׯ דכ ֵֵׅ֟‬ ‫כ ְ לإ ‪ ؇‬ד‬
‫ؗ ס‬ ‫׋ י ‪ ؋‬ו ؗــــــــדכ ׅ ْ ׋ ׆ ו ֺ‬ ‫וׂג ֽ ד‬
‫׀‬ ‫ׯ‬ ‫)‪(SP02 - 2005 AP600. SP04 - 2017 AP800‬‬
‫‪‬‬ ‫ד֫ ֽ֝‬ ‫ם ׎ ئ ד׈ ֛ו‬ ‫‪DBM‬‬ ‫דع ‪٧‬סׄ‬ ‫؛ ג ת ׇ ס כ ֫ ג ‪ ؇‬ס סֺׅ֞‬
‫ד־ ׇ ס ־ ת ׎ ס‬ ‫ס֫ חֵ כ ׅׄו ؗــــــــוו ‪؇‬‬
‫‪‬‬ ‫؛ ג ־ ׇ ס ֫ו ׉ו כ ֵ‬ ‫׎ כס ׀ ׅ ׫‬ ‫‪٧‬ס‬
‫׀ ג ׫ؾ‬ ‫׋ ג ת֫‬ ‫׎ ֺ֛ ד؂ו‬ ‫גׄ‬
‫ֺ֛֝ ‪.‬׋ ׆ ו ؗــــــــוו ‪ ؇‬ס‬ ‫֫ו ג ׆ ֹ‬ ‫ו ؗــــــــ ג ׅ דْ ׋׀ ֺ׫ׯד֫ דכ ׄח ־‬ ‫וׂג ֽ ד‬ ‫ׯ‬ ‫‪.‬‬
‫‪‬‬ ‫׬ْ ד ׁ ׂס ד֫‬ ‫׉ד‬‫דع ‪٧‬סׄ ג ׺ סׂ ם ׎ ئ ֫ו ׭ ׯ ֵ ו׀‪ ؋‬׋ יס ‪؋‬כ ׀ ֵ ד֫ ו ؗــــــــ‬
‫׬֟ ؛ ג ־ ׇ ס ס‬ ‫ד־ׄ ג‬
‫֥ דع ‪٧‬ס‬ ‫׋ ג ־ ו تب ג ֺ‪؋‬‬ ‫ְ ו‬‫׋ ‪֛ ؋‬ו ד ד ׈ ׋ ֛ו ׯ‬ ‫׎ ׅׄ‬
‫ו֫ חֵ ו ؗــــــــ‬ ‫‪.‬‬
‫־ ד׫ל ؐ ׌ ׹ ׉ ֛ו ׀ ׆ ד׏ ג ׆ ׹ ׉ ֛ו‬

‫ּّ֛֞ ‪‬‬ ‫ד‬ ‫ؚ֥ــــــ ֛ו ֫֞ כ ַׇ‬ ‫וت ؗ ו ׇ‬ ‫ּّ֛֞ ם ׎ ئ ֫ו ׭‬ ‫؛ ג ־ ד׬‬


‫֡ כؚ ֵ‬ ‫ו‪֛ ֹ؋‬‬ ‫׭‬
‫‪‬‬ ‫׭ْ ׀ ו ֺ ׅד‬ ‫؛׀ ג׋־ י ‪؋‬ד־ כס ׇד֫‬ ‫ׯ ֹ ֛֡ ׋ ׎ ג ־ ֛֝‬ ‫ׯ גت ד‬
‫׫ׇ דؚــــــׅ‪‬‬ ‫؂סׄ ו ל‬
‫‪ᅃ‬ؗــــــــכ ְ ‪ᅃ‬‬ ‫ג ס‬ ‫ו׋ ג ת‬ ‫׊ד ג ‪ ֫؋‬ל ׀ ג ֫‬
‫ׅ‬ ‫ל ׇ ג ׉ ׫‪,‬ל ׀ ׋ ׫‬
‫ג ئ ֫ו ׄ ׋ ؗד ֥‬
‫ח؂דׄ ׀ ג ׫ ؾ‪٧‬ס ׎ כס ׀ ׅ ׫ ؛ ג ־ ׇ ס ס ‪‬‬ ‫ות ֫‬ ‫׫֩‬ ‫‪ ٝ‬כ ְ‪ ᅃ‬׫ ַ‬ ‫ל ز ג ׯ ד׬ס‬
‫֡ס כ ‪؇‬ــــــؗــــــــ‬ ‫ס ؚ ׇ֡‬ ‫׋ ׆ ו‪֫ ؋‬ו‬
‫ؚــــــ ‪‬‬ ‫׹ ׉דכ ׈ ל֫ ג ׊דל ׯ ג ֵ ס ׈ ؚ ׇו ֛ׄ‬ ‫׃ ֭ג‬ ‫ׂס ד֫‬ ‫׭ ׯ ْס דׁ‬ ‫ד֫‬
‫ג ׀ דׯ ֫ו ؛ ג ־ ׇ ס סדع ‪٧‬סׄג ׺ סׂ ׀ ו ֺ ׅד‬ ‫‪.‬ر‬
THANK YOU