XP4 - Sequence of Operation - Rev 01
XP4 - Sequence of Operation - Rev 01
XP4 - Sequence of Operation - Rev 01
VITAL CONTROLS
Trainer – Mark Naylor
XP4 SEQUENCE OF OPERATION | Vital Controls
CORE
CONTROLLING
LOGIC
2
XP4 SEQUENCE OF OPERATION | Vital Controls
Notes SEQUENCE
3
XP4 SEQUENCE OF OPERATION | Vital Controls
Notes SEQUENCE
4
XP4 SEQUENCE OF OPERATION | Vital Controls
Notes SEQUENCE
5
XP4 SEQUENCE OF OPERATION | Vital Controls
Notes SEQUENCE
6
XP4 SEQUENCE OF OPERATION | Vital Controls
Notes SEQUENCE
2
A_C_FLASH
• Normally De-energised
• If there is a demand from the Bell Control Relay (BCR) de-
Energising, A mast bells will sound
B_D_FLASH
• Normally de-energised
• Controls the B and D lamps
• If there is a demand to flash from the FCR de-
energising, the B and D lamps will Flash
7
XP4 SEQUENCE OF OPERATION | Vital Controls
Notes SEQUENCE
2
GCJP Gate Control Timer Repeat
• Normally De-energised
• In IXC module maximum of 20 sec Gate delay can be
given. To achieve remaining 5 sec, this equation has
been created and used in A/B_GATE_CNTRL &
A/B_GATE_STNBY equation.
• Considering future Gate delay adjustment, IXC module
configuration Gate delay set to 16 sec and remaining 9
sec achieved in this equation.
8
XP4 SEQUENCE OF OPERATION | Vital Controls
Notes SEQUENCE
3
A_GATE_STNBY
• Normally Energised
• Controls the "A" boom gate motors
• If there is a demand from the Gate Control relay
(GCR), 25 seconds later the GCJP energises taking
power off the "A" boom gate motor causing it to lower.
B_GATE_STNBY
• Normally Energised
• Controls the "B" boom gate motors
• If there is a demand from the Gate Control relay
(GCR), 25 seconds later the GCJP energises taking
power off the "B" boom gate motor causing it to lower.
9
XP4 SEQUENCE OF OPERATION | Vital Controls
Notes SEQUENCE
3
A_GATE_CTRL
• Normally Energised
• Controls the "A" boom gate motors
• If there is a demand from the Gate Control relay
(GCR), 25 seconds later the GCJP energises taking
power off the "A" boom gate motor causing it to lower.
B_GATE_CTRL
• Normally Energised
• Controls the "B" boom gate motors
• If there is a demand from the Gate Control relay
(GCR), 25 seconds later the GCJP energises taking
power off the "B" boom gate motor causing it to lower.
10
XP4 SEQUENCE OF OPERATION | Vital Controls
Notes SEQUENCE
4
Island Assignment
• Normally energised
11
XP4 SEQUENCE OF OPERATION | Vital Controls
MISCELANEOUS
LOGIC
12
XP4 SEQUENCE OF OPERATION | Vital Controls
Notes
Bell Mute
• Normally de-energised
• Silences the crossing bells.
• Active if the vital configuration bit BELL_MUTE_C is
set and A and B boom proved in the down position.
Notes
13
XP4 SEQUENCE OF OPERATION | Vital Controls
Notes
14