Professional Documents
Culture Documents
Progress Work
Progress Work
Progress Work
PROGRESS REPORT
By
SUJAN BISTA
M.SC. SEMESTER IV
A=R * K * LS * C * P
TOPOGRAPHIC FACTOR LS
L= (Flow Accumulation *12.5/22.13)^0.5)
S= (0.43+0.30s+0.043s*s)/6.613
C factor Map
NDVI = near infrared (NIR)–red (R)/ near infrared (NIR) + red (R)
For Landsat 8
NDVI = (Band 5 – Band 4) / (Band 5 + Band 4)
C= 0.431 - 0.805 * NDVI
De Jong (1994)
28 96 4 Alluvium MS2
29 97 3 Alluvium
30 97 3 Alluvium
33 MS1
36 98.5 Alluvium
37 97 3 Residual
38 96 4 Residual
45 Colluvium
46 Colluvium
49 95 5 Residual
50 98 2 Colluvium