000 of NH-20
N (New NH-154) (Design
Length 5.357 Km) including construction of Twin Tube Tunnel for a length of 3.500 Km
NPG Consultation
1
Detailed name of
Corridor/Project
all
r.
Corridor
Corridor Name | State Name Data not available on NMP portal. To be
Details to be mentio
for the entire corrido
prepared in advance
Points that are not
Corridor Connectivity Details applicable can be
removed
Highlight location of
the corridor in India Economic – Nurpur, Shahpur, Dharamshala,
and then show a Centers Kangra, Palampur, Baijnath, Mandi
zoomed in snapshot
of the corridor
alignment
Start Point
– Shakti Peeths viz., Chamunda
Devi, Brajeshwari Temple & Plac
Start Point of PKG- Religious & tour
Punjab/
Tourist Places Jwalamukhi Temple etc . imp
VB
HP – International Paragliding Site viz., high
Border Bir Billing
T
Travancore
MM
~1 T, Direction: ~xx
North West
d: MM
Limited not available on xx
NMP portal.xx
MMT 3 Palakkad Alappuzha
Data To be xx xx xx
.4
Direction: ~xx
o o .4
prepared in advance
yw 6
MMT
Pl t: ~
Origin: Kochi
Kochi East
5 XX XX xx xx xx xx xx
Direction: ~xx MMT
6 Others Others ~0.7 ~0.6 ~0.2 ~3.3 ~4.9
Ultratech Total ~6.4 ~5.1 ~1.4 ~15 ~27
Cement
2 XX XX XX
Malappuram Destination:
Pop.: 0.41 Cr Palakkad
10 3 XX XX To be
Data not available on NMP portal. XX
0k prepared in advance
m Tiruppur
Palakkad Pop.: 0.25 Cr 4 XX XX XX
Tribal District Pop.: 0.28 Cr
- Thirussur 5 XX XX XX
Pop.: 0.31 Cr Major Districts outside area
in Southeast direction : Theni
Label the tribal (aspirational district) 6 Others Others XX
and aspirational
districts Aspirational
District - Idduki Total XX
Pop.: 0.11 Cr
Label the tribal
and aspirational
districts Passenger Vehicles
Year
(PCU)
Origin: Kochi
FY2023-24 XX
Major Districts outside
area in South direction : Alappuzha Kottayam Ernakulam FY2028-29
Data not available on NMP portal. To be XX
Pop.: 0.21 Cr Pop.: 0.19 Cr Pop.: 0.33 Cr prepared in advance
Kollam, Pathanamittha FY2033-34 XX
5
LWE (Left Wing Extremism) Districts Districts within 100km radius
Area Approach Analysis: Corridor Name - Synergy with other transport infrastructure
Kozhikode
Palakkad Railway
Airport Road
Junction Stretch
Destination:
Infrastructure
Palakkad
Other
Origin: Kochi Details
Infrastructure
Thrissur, Palakkad,
Railway stations
Ernakulam Ernakulam
Railway Station
Airports Cochin
Ports Kochi
6
Area Approach Analysis: Corridor Name - NH Infrastructure Supply – Demand Gap
Assessment
2 additional
lanes required
Supply – Demand Gap Assessment
Fr
Current Traffic (PCUs) tra
(Current demand for NHs) 48,844 the
ab
Projected TrafficData
(PCU)
not available on NMP portal. To be
(Demand for NHsprepared
in FY2033- 70,000
in advance Ba
34)
End Lane Configuration
Origin: Kochi (Required supply of NHs) 6 Lane with Paved Shoulder
LEGEND
2 - Additional Lanes Required
En
4 - Additional Lanes Required Additional lanes required 2 Lane m
6 - Additional Lanes Required co
Kochi
8 - Additional Lanes Required
7
All Map snapshots to be taken from NMP Portal
Corridor Name alignment planned using NMP Portal with focus on key principles of PM
GatiShakti national Master Plan Benefits to be shown across the 4
GatiShakti Principles, as applicable.
Numbers to be updated for the
entire corridor.
XX
Economic nodes, social nodes, logistics consideration; incase certain
nodes to be highlighted along with crow- are not applicable to the corr
(Detailed Further) flight distance of the important nodes from can be removed
Mudhol
the proposed project alignment Social Nodes
m
Aspirational xx k (XX Aspirational Districts, YY LWE Affected Districts,
district (Gadag ZZ Tribal Districts, WW Tourist & Religious Places)
district) Bengaluru
m
x xk MMLP
XX
1 Mega Food Park in Logistics Nodes
Davanagere
Bengaluru
(XX Major Railway Stations, YY Airports, ZZ Ports,
WW MMLPs)
Corridor Project Under Discussion
10
Snapshot Source: PM GatiShakti National Master Plan Portal
All Map snapshots to be taken from NMP Portal
Consultations
1 Corridor Name (Section name, 186 km): Connectivity to economic (XX), social (YY) and
2 logistics nodes (ZZ) in project section GatiShakti Portal has to be accessed to develop Map slide with
key Economic nodes, social nodes, logistics nodes(MMLP,
Airport, Railway Stations, Ports etc), Important Installation (Power
Pune - Bengaluru EXP Plant, etc) to be highlighted along with distance via NH/SH network
Karad
(Karad (xx.yy km) – from the proposed project alignment along with lane-status
Mudhol(xx.yy km) section)
Mudhol
1 Corridor Name(Section name, 186 km): Expected Passenger and Freight Traffic Movement
FY2033-34 XX YY ZZ
Mudhol
Project Under Discussion 12
Snapshot Source: PM GatiShakti National Master Plan Portal
Corridor Name (Section name, 186 km): Utility corridor, Solar Panels and allied
3
infrastructure planned along the corridor
Cross Section of Proposed Alignment Snapshot of Cross-section along with key features of the Utility Corridor, as applicable
Utility Clamp
for Overhead
Utilities
Crossing
Drain
Utility Cable
Ducts ROW
for OFC &
other utilities
13
Package under consideration
Corridor Name (Section name, 186 km): Major intersections with other transport/ecological
4 infrastructure & clearance requirement
Clearance details to be highlighted along with Key issues, as applicable
Intersection details to be highlighted as applicable with hyperlinks to
detailed slides in the back up section
Sr. Intersecting
# of Intersections Clearance Needed and Status / Issues Target Date
No. Infrastructure
Forest Area/Eco
6 03 districts The Forest proposal is uploaded on e-Parivesh portal dd-mm-yyyy
Sensitive Zone
Land Requirement of xx Ha., of which yy Ha is available. Possession of Balance Land expected by dd-mm-yyy
14
Corridor Name will improve logistical efficiency and boost employment
Data not available on NMP portal. To be Highlighted details to be mentioned as applicable for the
prepared in advance corridor under consideration
12.3% 100%
Length Reduction Increment in avg. Speed
(197 km to 173 km) (40 km/hr to 80 km/hr)
17
Alignment Name
Alignment Updates – Summary Alignment change reasons may also include
increasing proximity to eco / social nodes alon
issues with crossing of eco sensitive areas,
intersection with infra etc.
Chainages with
All Map snapshots to be taken from NMP Portal # District Alignment Reason for Change
Updates
1 Bareilly 59.4 to 76.3
2 Pilibhit 76.3 to 105.8
Rampur
3 Shahjahanpur 105.8 to 135.8 Alignment change due
Original Alignment to Eco sensitive Zone
Start and endpoint of
alignment to be Lakhimpur of Pilibhit & Dhudhwa
4 135.8 to 207.1
highlighted Kheri Tiger Reserve
5 Sitapur 207.1 to 256.6
Optimized
Alignment 6 Bahraich 256.6 to 327.8
Original and optimized
alignment to be highlighted Alignment change due
through screenshot from portal Sant Kabir to Eco sensitive Zone
Gorakhpur 7 455.4 to 461.4
Nagar of Bakhira Bird
Sanctuary
Sant Kabir
8 431.8 to 437.2
Nagar Alignment change due
Siddharth to Forest/Plantation
9 437.2 to 444.1
Nagar
18
Alignment Name
Alignment Updates – Summary
19
Alignment Name All Map snapshots to be taken from NMP Portal
Optimized
Alignment
20
Alignment Name
Alignment Updates – Details (2/2)
Intersection with Forest Boundary
All Map snapshots to be taken from NMP Portal Optimized Alignment Modification: To avoid Reserve/ Wildlife/ Forest
Alignment area, modification have been done at following chainages.
3. Km 287.1 to Km 303.5 (Reduction in skew angle wrailway
track)
Original Alignment
Original and optimized
alignment to be highlighted
through screenshot from portal
21
Tentative Structures Proposed from PM GatiShakti Workshop in BISAG-N,
Gandhinagar
22
Tentative Structures Proposed
Identified Intersection with Railway Lines ROB/RUB identified basis portal
10
Observations:
All Map snapshots to be taken from NMP Portal Skew Angle of some ROB’s have to be improved
Km 196.4*
State Chainages (approximate)
45.0
83.9 *
196.4 *
294.1 *
Uttar Pradesh
301.7 *
332.5 *
Km 414.8
344.5 *
414.8
* Chainage to be changed as per modified alignment 478.8 23
Tentative Structures Proposed
Identified Intersection with River Bodies
Bridges identified basis portal
13
Observations:
All Map snapshots to be taken from NMP Portal
Skew Angle of some bridges have to be improved
Km 254.9*
State Chainages (approximate)
18.0 274.0 *
23.1 283.8
27.4 286.5
All Map snapshots to be taken from NMP Portal
Uttar Pradesh 32.0 439.0 *
66.0 * 469.8
77.9 * 480.4
Km 469.8 & 480.4
254.9 *
25
Clearances and Approval Required
Identified Clearance/ Approval from Ministry of State No. of Forest Clearances Required
Environment, Forest and Climate Change
Uttar Pradesh 1 (Environment Clearance required)
Protected Forest - As per identified
patches (Not available in BISAG-N
All Map snapshots to be taken from NMP Portal Data)
Observations:
1 Rampur
2 Bareilly
3 Pilibhit
4 Shahjahanpur
5 Lakhinpur Kheri
All identified reserve forest, wildlife sanctuaries and their eco-
6 Sitapur
sensitive zone has been avoided in modified alignment as per
7 Bahraich BISAG-N Data. However as protected forest data is not available,
those have to be identified at site.
8 Shrawasti
9 Balrampur
10 Siddharthnagar
12 Gorakhpur
27
Clearances and Approval Required– Details
Intersection with High Tension Utility Lines
# District Chainages / Lat-Long
6 Balrampur 344.7
8 Gorakhpur 475.3
28
Suggestions on NMP portal
29
Suggestions on NMP portal (1/2) – Alignment Name
Category Sub-Category Suggestion
Geographical Information
Others
30
Suggestions on NMP portal (2/2) – Alignment Issue
Category Sub-Category Suggestion
Analytical tools
Built-up Area along the Alignment
31
All Map snapshots to be taken from NMP Portal
32
Length, Chainage and Package details of the corridor as
included below.
Corridor Name | Project specifications (2/3) Specifically, Length, Chainage and Package details of the project
under consideration are to be mandatorily included.
– Corridor starts from Existing Km 11.0 near Punjab/HP Border and ends at Km 208.0 in Mandi
– Divided into 5 packages (Package-I (A, B), II (A, B, C) & V(A, B))
– Instant Package-VB starts from Existing Km 202.815 and ends near Existing Km 203.0 of NH-03
33
Table showing Package-wise Status
Corridor Name | Project specifications (3/3) of the project, with all details as
mentioned below
Existing
Chainage(Km) Greenfield/
Packag Name of Existing Design
Brownfield Lane Configuration Status
e Packages Length(Km) Length(Km)
From To Length(Km)
35
Analysis to be done at corridor level
OD analysis, thickness
of line to represent the
traffic
Corridor Name Freight/Passenger Desire Line Diagram (1/2)
204-North HP 204-North HP
203-East HP 203-East HP
Pathankot
303-East India
303-East India
202-South HP 202-South HP
201-Punjab 201-Punjab
301-West India
301-West India
302-South India
302-South India
Desire line diagram of all goods vehicles at location-1 (Km 11.9) Desire line diagram of all Passenger vehicles at location-1 (Km 11.9)
36
Analysis to be done at corridor level
OD analysis, thickness
of line to represent the
traffic
Corridor Name Freight/Passenger Desire Line Diagram (2/2)
203-East HP 203-East HP
303-East India
303-East India
202-South HP 202-South HP
301-West India
201-Punjab 201-Punjab
301-West India
302-South India
302-South India
Desire line diagram of all goods vehicles at location-2 (Km Desire line diagram of all Passenger vehicles at location-2 (Km
152.9) 152.9)
37
Analysis to be done at corridor level
Traffic surveys like Classified Traffic Count, Turning Moment and OD were conducted on the Corridor Name
in the year 2017.
Latest Traffic on the project corridor is as under:
AADT (2017 ) @ 5.4% increment
Data not available on NMP portal. To be
Assigned Traffic prepared in advance
6735 PCUs/day(2023)
Total
Year Cars TW 3W LCV Bus 2A Truck 3A Truck MA Truck Total PCU's
Vehicles
2017 1,995 1,401 224 231 310 116 160 3 4440 5037
The Summary of Traffic Projection on Existing Bijni-Mandi section of NH-154 are as follows
Year 2017 2023 2028 2033 2038 2043 2048
AADT in Vehicle’s 4440 6045 7408 8774 10101 11347 12480
AADT in PCU's 5037 6735 8190 9672 11158 12583 13891
Freight/ Goods Vehicle: Major Commodity wise O-D analysis Matrix (Average per Day):
Data of O-D expanded Matrix considered for Traffic Projection
Data not available on NMP portal. To be
prepared in advance
40
Analysis to be done at corridor level
Passenger Vehicles O-D analysis Matrix (Average per Day): Data of O-D expanded Matrix
considered for Traffic Projection
% of Trip Purpose
No. of
Vehicle Origin Destination Average Social/
Vehicles Trip length Passenger-
Type (Car/ (Name of (Name of Occupancy Work/ Shopping/
(average (km) km Education
Bus) Place) Place) (in Nos.) Business Tourism/
per day)
Others
41
Analysis to be done at corridor level
Data not available on NMP portal. To be
prepared in advance
42
Analysis to be done at corridor level
43
Summary of Economic Node analysis
44
Corridor Name (Section name, 186 km): Financial Viability
12%
For Projects that might not be financially
7 Project EIRR (Duration: 20 years) viable, EIRR has to be mentioned instead
of FIRR (in that case entry at S. No. 8 & 9
may not be required) Rs. 32.33 Cr.
8 NPV of Equity IRR
Rs. 416.01 Cr.
9 NPV of Net Revenue Streams(@12%)
45
Corridor Name : Summary of Financial Analysis Model
46
All Map snapshots to be taken from NMP Portal
NH-154A
NH-503
NH-154
NH-44
NH-54
NH-503
NH-205
NH-03
SH-43
SH-28
SH-27
SH-17
SH-22
SH-39 SH-17
SH-19
Pathankot Railway
Station
17Km
Joginder Nagar
Railway Station
Water Bodies
Optimized Alignment
Intersection Point
Detailed list of
economic nodes
connected by the
corridor
53
List of Social Nodes connected by Section Name, NH number, Part of Corridor Name
54
List of other infrastructure connected by Section Name, NH number, Part of Corridor Name
Detailed list of
transport nodes
connected by the
corridor 55
Details to be updated for the Corridor under consideration
Employment Generation1
Employment per kilometer due to upgradation of highway by 2 additional lanes
A
prepared in advance
B C A*B*C
No. of additional Employment per Lane km Direct E
Length of the project in genera
Lanes=End Lane Status – consideration in km (Person-Days) as per IIT
Current Lane Status Kanpur Study1 addition
the proj
Direct Employment 2 236.8 11, 188.5 0.53 km)*(11
Indirec
genera
addition
In-Direct Employment 2 236.8 13,985.5 0.66 the proj
km)*(13
Total E
Total Employment due to construction 25,174 1.2 Genera
Employ
In the main slide, Total Indirec
Employment generated by Genera
1. As per “Employment creating Effects of Highway Construction“ study IIT Kanpur, February 2019 56
the construction of
project in consideration is
All map screenshots to be taken from NMP portal Additional Details necessary for
explanation as per project specific
requirements
Corridor Name Strategic Importance of Corridor
To Leh
Laddakh Strategic/Defence Point-
Connects to International
Boundaries i.e. Pakistan
Atal Tunnel & China
Manali Data not available
Pathankot on NMP portal. To
From Pathankot,be prepared
Convoyin
Pakistan NH-154 Spiti China movements to
advanceLeh
NH-03 Laddakh passes through
NH-505
this route i.e. Pathankot-
Nurpur-Kotla-Shahpur-
Kangra-Palampur-
Mandi
Baijnath-Joginder Nagar-
Mandi- Further traverses
NH-05
through NH-03 at
Mandi(End Point) and
then to Kullu-Manali- Leh
Shimla
via Atal Tunnel.
57
Additional Details necessary for
explanation as per project specific
Connectivity with Salt Mine & Hydro Power Project requirements
NH-154A
NH-503
NH-44
NH-154
NH-54 NH-503
Image from NMP Portal showing the intersection of alignment under study with other NHs
NH-205
2 Km
Larjee Dam in
Larjee via NH-
03
NH-03
Km
37
58
Corridor Name Stakeholder Consultation
1 Himachal Pradesh State Government & HP PWD Alignment approved by State Government.
2 Military Station Headquarter & Cantonment Board Consent taken from the concerned Military Station.