Holy Name University

cor. Gallares & Lessage sts, Tagbilaran City


The only catholic university in the Province of Bohol

RESOURCE UTILIZATION AND ACCOUNTABILITY

Property & Supply Management


(w/ introduction to R.A. 9184)

JUAN PAOLO S. ARANAS


Master in Public Administration

LOCAL GOVERNMENT
BASIC PRINCIPLES

Public office is a Public Trust (Sec. 1 Art. 11 of


the 1987 Philippine Constitution; RA 6713).
Public officials and employees must be at all
times accountable to the people, serve them with
utmost honesty, responsibility, integrity, loyalty,
and efficiently, act with patriotism and lead
modest lives.
BASIC PRINCIPLES

Section 2 of the PD no. 1445 otherwise known


as the State Auditing of the Philippines states
that “all resources of the government shall be
managed, expended or utilized in accordance
with laws, rules, regulations, and safeguarded
against loss or wastage through illegal or
improper disposition with the view of ensuring
economy, efficiency, and effectiveness in the
operation of the government.
References:
• Republic Act No. 7160 Book II Title 6

• Revised Implementing Rules and


Regulations of Republic Act No. 9184,
otherwise known as the “Government
Procurement Reform Act.”
Course Objectives:

• To know and discuss Supply & Property


Management; and to

• Appreciate Provisions under Republic


Act. No. 9184 and its Implementing Rules
and Regulations
SUPPLY AND PROPERTY MANAGEMENT
*SECTION 356 – GENERAL RULE IN
PROCUREMENT AND DISPOSAL
Except as otherwise provided herein,
acquisition of supplies by local government
units shall be through COMPETITIVE
PUBLIC BIDDING. Supplies which
become unserviceable or no longer needed
shall be SOLD, whenever applicable, at
PUBLIC AUCTION, subject to applicable
rules and regulations
PROCUREMENT
DEFINITION OF TERMS (R.A. 7160 & 9184)

 Lowest Complying and Responsible Bid


1. proposal of one who offers the lowest price;
2. meets all the technical specifications and
requirements of the supplies desired;
3. as a leader in the line of supplies involved;
4. maintains a regular establishment; and
5. has complied consistently with previous
commitments;
 Suitable Substitute – refers to the kind of article which would serve
substantially the same purpose or produce substantially the same results
as the brand, type, or make of article originally desired or requisitioned.
 Supplies – include everything, except real property
 Terms & Conditions – refers to other requirements not affecting the
technical specifications and requirements of the required supplies
desired
 Approved Budget for the Contract –
budget for the contract duly approved by
the HOPE.
Fund Instrumentality
National Government General Appropriations Act
Agencies (NGAs) (GAA)
GOCCs, GFIs, SUCs Corporate budget for the
contract approved by the
governing board
Local Government Units Budget Approved by
(LGUs) Sanggunian
Foreign – Funded Treaty, International or
Procurement Executive Agreement
 Bid – equivalent to “Proposal” and “Tender”
 Bidder – eligible contractor, manufacturer,
supplier, distributor and or consultant
 Bidding Documents – documents issued by
the P.E. as basis for bids, furnishing all
information necessary for a prospective
bidder to prepare a bid.
 Common-Use supplies – goods, materials
and equipment that are used in the day-to-day
operations of the PE in the performance of
their duty
 Competitive Bidding – method of
procurement which is open to participation
by an interested party which consists of
processes.

 Expendable Supplies – articles which are


normally consumed in use within one (1)
year or more than a year but which shall have
decreased substantially in value after only
one year in use
 Goods – all items except consulting services
and infrastructure projects which may be
needed in the transaction of public businesses
including related or analogous services.
 Head of the Procuring Entity (HOPE) –the
head of the Agency.
 Infrastructure Projects – “civil works”
 Non-Expendable Supplies - articles which
retain their identity during the period of use
whose serviceable life is more than one year.
 PhilGEPS – Philippine Government Electronic
Procurement System

 Portal – website

 Procurement – acquisition by the PE

 Procuring Entity (PE) – refers to branch,


offices, agencies, bureau of the GOP, incl.
GOCC, GFI, SUC, LGU.
SECTION I – SHORT TITLE AND PURPOSE
OF RA 9184

Purpose of the IRR of R.A. 9184:

• Modernization
• Standardization
• Regulation of the procurement
activities of the GOP
SECTION 2 – DECLARATION OF POLICY
• Modernization
• Standardization
• Regulation of Procurement Activities

• Transparency
• Accountability
• Equity
• Efficiency
• Economy
SECTION 3 – GOVERNING PRINCIPLES

• Transparency
• Competitiveness
• Streamlined procurement
process
• System of Accountability
• Public monitoring
SECTION 4 – SCOPE AND APPLICATION

• Branch, agency, department, bureau,


office or instrumentality of GOP, incl.
GOCCs, GFIs, SUCs, & LGUs
• Any Treaty or International or
Executive Agreement to which the
GOP is signatory
This IRR shall not apply to the following:

• Procurement funded by foreign grants

• Acquisition of real property

• Public – Private sector infra or


development projects and other
procurement covered by R.A 6957
DUTIES OF THE
PMO / End-user(s)
Duties of the PMO/End-user(s)
1. To provide the technical specifications of the goods it
will procure
2. To conduct a market survey that will include a
study of the available products or services, industry
developments

3. To recommend the ABC


4. To provide technical advice
5. To assist in the preparation of bidding documents
Duties of the PMO/End-user(s)
6. To attend all stages of the procurement
7. To determine the period of contract implementation
during the procurement planning stage, and include it in
the PPMP.
8. To ensure that the Chief Accountant of the procuring
entity issues a CAF for the project.
 Only with a CAF can the contract be valid.
 The Chief Accountant must also sign the contract as a witness. (Sec. 5 GPM)
 Fund availability is an indispensable prerequisite to the execution of any
government contract involving the expenditure of public funds by all
government agencies at all levels.
Duties of the PMO/End-user(s)
9. To determine the existence of condition/s that require
an amendment to order.
10. To determine the existence of a force majeure or
fortuitous event that will be the basis for the issuance of
a suspension order.
11. To either approve or disapprove the request for
extension.
PROCUREMENT
PLANNING
What is Planning?
• The act or process of making or carrying out plans.

• The establishment of goals, policies, and procedures for a social or


economic unit.

• It involves resource allocation and scheduling.

• Through plans, a PE is able to effectively manage and track


procurement all the way to contract performance.

• Allows managers to determine how to allocate limited cash and


other appropriate resources under a given time line, identify choke-
points, weaknesses, and delays in the entire activity that can be
addressed or eliminated.
Planning & budgeting linkages
PE – Agency Budget Proposal by considering the budget
framework

PMO/End-User – prepares their respective WFP for their


different PPA’s as annex to Budget call.

Procuring Entity’s Budget Proposal embodies the agency


thrusts and the resources needed to produce the key services it
delivers to the public.

Procurement planning should be done within this budgetary


context, reflecting the Procuring Entity’s priorities and
objectives for the budget period.
Planning & budgeting linkages
The WFP or the Work and Financial Plan

 Contains the initial list of projects/requirements of each PMO/End-User unit


and the corresponding estimated budgetary requirement.

 Submitted by the PMOs or end-user units to the PE’s Budget Office on or


about May of each year, to coincide with the submission of their respective
budget proposals. This will be evaluated and included in the PE’s Budget
Proposal .

 This will support the Budget Proposal submitted to DBM and becomes the
basis for the proposed PPMP.

The Budget Office shall furnish a copy of the WFP’s and proposed PPMP to
the BAC Sec for the consolidation of the initial list of items/projects for
procurement into the proposed APP.
Planning & budgeting linkages

 When GAA becomes final (Nov. - Dec.), PMO’s/End-User must refine the
proposed PPMP.

 Within 15 days from issuance of the Agency Budget Matrix (ABM) during the
1st quarter of the fiscal year, PMO’s/End-User shall finalize the PPMP’s to reflect
the budgetary allocation for their respective PPAs as provided in the ABM.

The final PPMPs shall be submitted to the BAC Sec for the finalization of the
proposed Procuring Entity’s APP to be submitted to the HOPE for confirmation
or approval.
Preparation of the Project Procurement Management Plan
(PPMP)

What is a Project Procurement Management Plan (PPMP)?

 A Project Procurement Management Plan or PPMP, which is a component of


the Project Management Plan, deals primarily with:
a.planning for the procurement of project requirements;
b.bidding or procurement strategy;
c.source selection;
d.delivery and payment schedules;
e.contract administration;
f.contract termination; and
g.other major milestones; in an effort to obtain goods, infrastructure and services
from suppliers, contractors and consultants.
Preparation of the Project Procurement Management Plan
(PPMP)

 The PPMP serves as a guide document in the procurement and


contract implementation process, as well as a vital reference in
procurement monitoring.

 It serves as an important tool in resource and financial


management, allowing the Procuring Entity the flexibility to
optimize the utilization of scarce resources.

 Well-planned procurement will significantly minimize the


practice of doing short-cuts to ensure that the Procuring Entity is
able to purchase its requirements for the delivery of public services.
Preparation of the Project Procurement Management Plan
(PPMP)

Developing the Project Requirements:

The development of the project requirements should be done


during the preparation of the proposed PPMP. At this stage of
the procurement planning process, the PMO or end-user unit
must:

a. Identify the need of the PMO or end-user unit


What is the purpose of the procurement?
What are the problem/s or needs that the project or
procurement aims to address?
Preparation of the Project Procurement Management Plan
(PPMP)

Developing the Project Requirements:


b. Identify the alternative solutions, products, and services.

What alternative solutions to the problem/s or need/s are


available in the market?
What is the profile of the supply market?
Are they easily obtainable?
How much is the cost of each alternative?

The PMO or end-user unit should conduct the market research at this point, and
gather as much information about the Goods, Services or expertise required. At
the end of this activity, it should know the market or the industry well enough to
make an informed choice.
Preparation of the Project Procurement Management Plan
(PPMP)

Developing the Project Requirements:

c. Compare the alternatives (consider qualitative and


quantitative factors)

Consider how the PMO or end-user unit would rate the various
alternatives in terms of the following:

i. Value for money


The concept of value for money is not restricted to price alone. In addition to
costs, other considerations are non cost factors like suitability or fitness to the
purpose, quality, among others. In comparing costs, all relevant costs should be
considered, e.g., acquisition costs, life-cycle costs (including maintenance and
operating costs for goods and infrastructure, spare parts of goods, etc.).
Preparation of the Project Procurement Management Plan
(PPMP)

Developing the Project Requirements:

ii. Risk assessment and management

Some risks that may be identified are: obsolescence of


equipment, availability of support services, capacity of contractors
to implement the project. It is recommended, especially for high-
technology, complex, or high value procurement, that the PMO or
end-user unit identifies the risks involved and come up with its own
risk management plan. Or the bidders could be required to submit,
as part of their technical document, a risk assessment and risk
management plan.
Preparation of the Project Procurement Management Plan
(PPMP)

Developing the Project Requirements:

iii. Government policies that have an impact on the project or


procurement

Are there any restrictions on the procurement contemplated?


What relevant government policies should be considered in
determining the goods or services that will be purchased?

iv. Other relevant factors that may be identified by the PMO


or end-user unit.
Preparation of the Project Procurement Management Plan
(PPMP)

Developing the Project Requirements:

iii. Government policies that have an impact on the project or


procurement

Are there any restrictions on the procurement contemplated?


What relevant government policies should be considered in
determining the goods or services that will be purchased?

iv. Other relevant factors that may be identified by the PMO


or end-user unit.
Preparation of the Project Procurement Management Plan
(PPMP)

Writing the Technical Specifications, Scope of Work


(SOW) and Terms of Reference (TOR):

The Technical Specifications (for Procurement of


Goods), Scope of Work (for Services and Infrastructure
Projects) or Terms of Reference (for Consulting Services)
is the document that provides the detailed description of
the deliverables of the Supplier, Contractor or Consultant.
Preparation of the Project Procurement Management Plan
(PPMP)

Writing the Technical Specifications, Scope of Work


(SOW) and Terms of Reference (TOR):

The following guidelines are, considered helpful in writing the


TS/SOW/TOR:

 Quality Assurance actually starts at this stage of the procurement


cycle, considering that the deliverables are decided at this time. It is therefore
important that all stakeholders are consulted, and the actual requirements of
the PMO or end-user unit are determined and put in writing.

 If the procurement is complex, highly technical, or high value, and


the Procuring Entity does not have sufficient technical proficiency, it would
be prudent to engage the services of technical experts who will serve as
consultants in the preparation of the TS/SOW/TOR.
Preparation of the Project Procurement Management Plan
(PPMP)

Writing the Technical Specifications, Scope of Work


(SOW) and Terms of Reference (TOR):

The following guidelines are, considered helpful in writing the


TS/SOW/TOR:

 In engaging these consultants, the Procuring Entity shall follow the


procedures for procurement of consulting services. Moreover, care should be
taken that possible conflict of interest is avoided; that is, the consultant/s
engaged should not be connected with the prospective bidders/contractors,
and are barred from being engaged by the latter for any purpose related to
the procurement at hand.
Preparation of the Project Procurement Management Plan
(PPMP)

Writing the Technical Specifications, Scope of Work


(SOW) and Terms of Reference (TOR):

The following guidelines are, considered helpful in writing the


TS/SOW/TOR:

 The description should be generic and flexible, not product-specific


or seemingly tailored for a particular brand, product, contractor or
consultant, unless the procurement involves products or services that have
intellectual property rights attached to it, or are exclusively offered by a
single source, and there are no suitable substitute products or services.
Preparation of the Project Procurement Management Plan
(PPMP)

Writing the Technical Specifications, Scope of Work


(SOW) and Terms of Reference (TOR):

The following guidelines are, considered helpful in writing the


TS/SOW/TOR:

 If the procurement involves products or services that have


intellectual property rights attached, or are exclusively offered by a single
source without any suitable substitute, then the PMO or end-user unit must
be able to satisfactorily justify the need for such a product or service.
The description should be clear and unambiguous, to avoid confusion and to
facilitate the evaluation process. It is noted that the TS/SOW/TOR is also the
basis of the evaluation or, when applicable, the testing parameters.
Preparation of the Project Procurement Management Plan
(PPMP)

Writing the Technical Specifications, Scope of Work


(SOW) and Terms of Reference (TOR):

The following guidelines are, considered helpful in writing the


TS/SOW/TOR:

 Considering that planning is done sometime before actual


procurement and even farther from the date of actual delivery or project
implementation, changes in technology or changes in the concerned industry
or field of expertise should already be taken into account in writing the
TS/SOW/TOR.

 This will allow the Procuring Entity to procure the latest products
and/or services available in the market.
What is an ABC?

The ABC refers to the budget for the contract duly approved
by the Head of the Procuring Entity, as provided for in the GAA
and/or continuing appropriations, in the case of NGAs; the
corporate budget for the contract approved by the governing board,
pursuant to E.O. No. 518 series of 1979 in the case of GOCCs and
GFIs, and R.A. 8292 in the case of SUCs; and the budget approved
by the Sanggunian in the case of LGUs. (IRR-A Section 5)
What is an ABC?

The ABC, insofar as National Government Agencies are


concerned, refers to the budget for the contract duly approved by
the Head of the Procuring Entity which is contained in the Agency
Budget as reflected in the GAA or to be proposed in succeeding
GAAs. Thus, the ABC referred to in the R.A. 9184 and its IRR-A
basically refers to the proposed budget for the project approved by
the Head of the Procuring Entity based on the APP as consolidated
from various PPMPs. (GPPB Resolution 011- 2005 dated 26 May
2005)
Determining the Approved Budget for the Contract (ABC):

In determining the ABC, the PMO or end-user unit has to consider


several factors, namely:

a. the appropriation for the project or procurement (whether


taken from the current year’s appropriations or continuing
appropriations),

b. the market price of the goods and/or services being


procured, inflation and cost of money which are directly
related to the procurement time table.
FORMAT OF THE PPMP

The PPMP shall contain the following information:

a.The name of the project/procurement;


b.General description of the project/procurement;
c.The extent/size of contract scopes/packages;
(This refers to the general description of the lot to be included
in a particular contract, i.e. the goods, infrastructure project or
services, or a combination of any two or three of these types of
procurement, including quantities where applicable.)
FORMAT OF THE PPMP

The PPMP shall contain the following information:

d.The procurement methods to be adopted, and indicating if the


procurement tasks are to be outsourced as provided in Section 53(e)
of the IRR-A;
e.The time schedule for each procurement activity; and
f.The ABC.
Preparation of the Annual Procurement Plan (APP)

The APP is the document that consolidates the various PPMPs


submitted by the various PMOs and end-user units within the
Procuring Entity.

It reflects the entirety of the procurement activities that will be


undertaken by the Procuring Entity within the calendar year.

The APP is prepared by the BAC through the BAC Secretariat


upon submission by the PMOs and end-user units of their respective
PPMPs and finalized after the ABM has been approved by the
DBM.
Preparation of the Annual Procurement Plan (APP)

The APP shall subsequently be re-submitted by the BAC for


approval to the Head of the Procuring Entity or a second-ranking
official designated by the Head of the Procuring Entity to act on his
behalf.

In preparing the APP, the BAC shall take into consideration the
following factors:

a. The APP should include all procurement activities planned for the year.
The approved APP shall be the basis for the Procuring Entity’s procurement,
and only those projects / procurement included therein shall be undertaken.
Preparation of the Annual Procurement Plan (APP)
b. The APP shall include only those procurements that are considered crucial
to the efficient discharge of governmental functions. The IRR-A considers a
procurement crucial to the efficient discharge of governmental functions if:
i. it is required for the day-to-day operations of the Procuring Entity; or
ii. it is in pursuit of the principal mandate of the Procuring Entity
concerned.

c. The APP shall include provisions for foreseeable emergencies based on


historical records. The BAC, through the BAC Secretariat, shall include
therein a lump sum to cover for these emergencies or contingencies, which
amount shall not be more than four percent (4%) of the Procuring Entity’s
total appropriations for MOOE.

d. Scheduling of procurement activities should be done in such a manner that


the BAC and the other offices/units in the Procuring Entity that are involved
in the procurement process are able to efficiently manage the conduct of
procurement.
What is a Procurement Strategy?
 The procurement strategy refers to the approach that will be adopted by
the BAC in the procurement of the goods, infrastructure projects and
consulting services included in the APP.

 It reflects the entirety of the procurement activities that will be


undertaken by the Procuring Entity within the calendar year.

 In the review and consolidation of the PPMPs, the BAC will be able to
determine the extent of diversity, quantities, quality, cost, the supply
market, and other characteristics of the Procuring Entity’s requirements
for the year.

 The profile of the procurement is a major determinant in the choice of


procurement strategy to be employed, as well as in the scheduling of
procurement activities.
What is a Procurement Strategy?

 There may be common requirements for the various PPMPs. For


example, three projects require the purchase of five (5) units of laptop
computers for each project office, or a total of fifteen (15) laptop
computers. Obviously, it will be more cost effective and efficient if the
BAC will procure the 15 laptop computers in one bidding exercise and as
one bid lot.

 The individual PPMPs sometimes reflect a mix of procurement types,


for example, an ICT project might involve the procurement of goods (e.g.,
workstations, network equipment and peripherals), procurement of civil
works (e.g., the installation of cables might involve the repair of some
offices and other related civil works) and procurement of consulting
services (e.g., design and development of information systems).
What is a Procurement Strategy?

 In similar cases, the BAC will have to exercise judgment in


determining the bid lots and contract package.

 There are two approaches to this case:

1. the project could be bid out as one package, or


2. it could be divided into several bid lots (i.e. supply of
hardware, supply and installation of cables, design and development of
information systems, and repair of facilities).

 There are advantages and disadvantages to both approach, and the


BAC, through the help of the TWG and the Secretariat, shall determine
which is the best option for the Procuring Entity.
What is a Procurement Strategy?

 In IRR-A, Section 5(p), in case of projects involving mixed


procurements, the nature of the procurement, i.e. goods, infrastructure
projects, or consulting services, shall be determined based on the primary
purpose of the project.

 This is helpful in determining which type of procurement procedure to


apply. However, there may be instances when the PMO, end-user unit or
the Procuring Entity itself may have difficulty determining or agreeing
upon the primary purpose. In these cases, ascertaining the component with
the highest price may be useful as an indicator of purpose, though not
necessarily as a determining factor.
Format of the APP
The BAC may prepare three APPs, one each for Goods, Infrastructure Projects, and
Consulting Services or a consolidated APP for all procurement activities.

The APP shall contain the following information:


a. Name of the project/procurement;
b. PMO or end-user unit;
c. General description of the project/procurement (general description of
requirements and quantities, where applicable);
d. The procurement methods to be adopted, and indicating if the
procurement
tasks are to be outsourced as provided in Section 53(e) of the IRR-A;
e. The time schedule for each procurement activity; and
f. The ABC.
PE shall prepare its proposed budget The End-user units shall revise and
for the succeeding calendar year adjust the PPMP to reflect the
budgetary allocation for their
respective PAP’s. The revised
The end-user units of the PE shall PPMP shall be submitted to the
prepared their respective PPMP BAC, for finalization and mode of
procurement under the proposed
The PPMP shall be submitted to PE APP. (The APP shall bear the
budget office for evaluation, if approval of the HOPE or its
warranted, include it in the PE budget designated representative)
proposal for approval by the HOPE

Updating of individual PPMP and


PE budget office shall furnish the PE
the consolidated APP for each PE
budget proposal as well as the PPMP
shall be undertaken every 6 months
to the BAC Secretariat for its review
or as often as may be required by
and consolidation into proposed APP
the HOPE.

Final GAA, corporate budget, or


appropriation ordinance
SECTION 7 – PROCUREMENT PLANNING
& BUDGETING

• All procurement shall be within the


Approved Budget of the PE

• No procurement shall be undertaken


unless it is in accordance with the
approved APP of the PE
Major functions of the Property
and Supply Division
Major Functions of the Property & Supply Div.
 Prepares Agency Procurement Request (APR) for all items to be
procured from the DBM-PS
 Accept deliveries of supplies, materials, and equipment based on
the APR, Purchase Order (P.O), Contract, and request for the
conduct of the inspection
 Issues and distributes available supplies, materials, and
equipment to requesting offices of the Procuring Entity.
 Prepares and maintains Inventory Custodian Slip (ICS) for all
inventory items, Report of Supplies and Materials Issued
(RSMI), Stock Cards for supplies and materials and Property
Card for all Property, Plant and Equipment (PPE)
Major Functions of the Property & Supply Div.
 Prepares Acknowledgement Receipt of Equipment (ARE) for all
(PPE)
 Conduct physical inventory for all PPE and consolidate the same
for the preparation of Annual Inventory Report
 Disposes waste materials and all unserviceable equipment in
accordance with applicable laws, rules, and regulations.
 Issues clearance from property accountability of all officials and
employees
 Maintains and updates master lists of inventories of all PPE and
inventory items
THE BIDS & AWARDS
COMMITTEE (Procurement)
The PhilGEPS (Philippine Government
Electronic Procurement Systems)

A central Portal that serve as


the primary source of
information on all government
procurement.
Main features of PhilGEPS
• The Electronic Bulletin Board
Centralized electronic bulletin board for posting
procurement opportunities, awards, results of bidding
and other related information.

• Registry of Manufacturers, Suppliers,


Distributors, Contractors, and Consultants

• The Electronic Catalogue


PE shall procure common – use goods, supplies,
materials and equipment from the Electronic Catalogue
of PhilGEPS
*Section 364 – The Committee on Awards

There shall be in every province, city


or municipality a Committee on
Awards to decide the winning bids and
questions on awards on procurement
and disposal of property
BAC Composition

The Head of the Procuring


Entity shall designate at least
five (5) but not more than
seven (7) members to the
BAC
BAC Composition for NGAs, departments, bureaus, offices, judicial
and legislative branches, commissions, SUCs, GOCCs, & GFIs

Regular Members:
Chairman, who is at least a third ranking permanent officials
of the PE
An officer, who is at least a fifth ranking permanent officials
who shall represents the legal / admin. Area of PE. (bureaus,
offices, BAC members shall be at least third ranking
permanent personnel)

An officer, who is at least a fifth ranking permanent officials


who shall represents the finance area. (bureaus, offices, BAC
members shall be at least third ranking permanent personnel)
BAC Composition for NGAs, departments, bureaus, offices, judicial
and legislative branches, commissions, SUCs, GOCCs, & GFIs

Provisional Members:

An officer who has technical expertise relevant to the


procurement at hand
A representative from the end user unit who has knowledge
of procurement laws and procedures

The Chairman and the Vice-Chairman shall also be


designated by the HOPE. Moreover, the Vice-Chairman shall
be a regular member of the BAC.
BAC Composition for Local Government Units
(LGU)

• One representative each from the


regular offices under the Office of the
Local Chief Executive; and

• A representative from the end-user unit


The HOPE may designate alternate members to the BAC
whenever their principals are absent

TERMS OF OFFICE – 1 YEAR (RENEWABLE)


Sec. 354 (RA 7160) The
Committee on Awards shall be
composed of the Local Chief
Executive as Chairman; Sec.11.2.5
(RA 9184) In no case shall the
HOPE and/or the approving
authority be the Chairman or a
member of the BAC
FUNCTIONS OF THE BAC
1. Advertise the invitation to bid/request for exp. Of interest;
2. Conduct pre-proc. and pre-bid conferences;
3. Determine the eligibility of bidders;
4. Receive bids and conduct evaluation of bids;
5. Undertake post-qualification proceedings;
6. Receive motion for reconsideration;
7. Recommend awards of contract to the HOPE ;
8. Creation of Technical Working Group (TWG);
9. Responsible for ensuring that the PE abides by the standard
set forth by the Act and this IRR;
Section 13 - Observers
1. Commission on Audit (COA) Representative
2. At least one (1) shall come from a duly recognized
private group in a sector relevant to the procurement at
hand, for example:

a) For Infrastructure projects, national associations of


constructors duly recognized by the Construction
Industry of the Philippines (CIAP), such as but not
limited to the following:
• Philippine Constructors Associations, Inc.;

• Nat’l Constructors Assoc. of the Phil., Inc.; &

• Phil. Institute of Civil Engineers(PICE)


Section 13 - Observers
b) For goods, a specific relevant chamber-member of the
Philippine Chamber of Commerce and Industry.
c) For consulting services, a project-related professional
organization accredited or duly recognized by the
Professional Regulation Commission or the Supreme
Court, such as but not limited to:
• PICE;

• Phil. Inst. Of Certified Public Accountants;

• Confederation of Filipino Consulting


Organizations; and
3. Non-government organization (NGO)
FUNCTIONS & RESPONSIBILITIES OF
THE BAC SECRETARIAT
1. Provide administrative support to the BAC;
2. Organize and make all arrangement for the BAC meetings;
3. Prepare minutes of meetings and resolutions of the BAC;
4. Take custody of procurement documents and records;
5. Distribution of BidDocs to the interested bidders;
6. Advertise opportunities, incl. BidDoc,and notice of awards;
7. Managing the procurement processes;
8. Consolidate PPMPs
9. Act as the central of communications for the BAC with end
users, PMOs, other units, and providers of services & public
The HOPE shall ensure that the
members of the BAC and TWG
shall give UTMOST PRIORITY
to BAC assignments over all other
duties and responsibilities, until the
requirements for the said
assignments at hand are completed.
AVAILABILITY OF BIDDING DOCUMENTS

For the procurement of goods and infrastructure


projects
From the time the Invitation to Bid (ITB) is first
advertised or posted until the deadline for the
submission and receipt of bids.
For the procurement of consulting services
From the time the Request for Expression of Interest is
first advertised until the deadline for the eligibility
check, and the Bidding Documents, from the
determination of the short list until the deadline for the
submission and receipt of bids.
Bidders may be asked to
pay for the Bidding
Documents to recover the
cost of its preparation and
development
Bidding Documents shall be posted at:
• Agency’s website

• PhilGEPS

Prospective bidders may download the Bidding


Documents from any of the said websites; provided
that, bidders shall pay the fees for the Bidding
Documents upon submission of their bids.
• Conspicuous places
• Newspaper; if applicable
Points to Remember
• (Purchase Request) Reference to brand names
shall not be allowed

• No aspects of the Bidding Documents shall be


divulged or released to any prospective bidder
or person having direct or indirect interest in the
project to be procured, or to any party, except
those officially authorized in the handling of the
documents
SECTION 20 - Pre-Procurement Activities
1. Confirm the description and scope of the contract, the
ABC, and contract duration.

2. Ensure that the procurement is in accordance with the


project and annual procurement plans;
3. Determine the readiness of the procurement at hand
4. Review, modify, and agree on the criteria for eligibility,
screening, evaluation and post-qualification

5. Review and adopt the procurement schedule, incl.


deadlines, and timeframes for the different activities; and
6. Reiterate and emphasize the importance of confidentiality
The holding of a pre-procurement
conference may not be required for:
Procurement of Goods
costing Two Million Pesos (Php2, 000,000.00) and below

Infrastructure Projects
costing Five Million Pesos (Php5, 000,000.00) and below

Consulting Services

costing One Million (Php1, 000,000.00) and below


SECTION 2 – Pre-bid Conference
For contracts to be bid with an ABC of One Million Pesos (P1,
000, 000.00) or more, the BAC SHALL CONVENE at least (1)
pre-bid conference to clarify, and/or explain any of the
requirements, terms, conditions, and specifications stipulated in the
Bidding Documents.

Pre-bid Conference is
P1M required

At the discretion of the BAC


SECTION 2 – Pre-bid Conference

Pre-bid Conference At least 12 cd. Opening & submission of bids

The minutes of the pre-bid conference shall be recorded and made


available to all participants not later than (3) calendar days after the
pre-bid conference.

ng !
rni Statement made at the pre-bid
Wa conference shall not modify the terms
of the BidDocs, unless such statement
is specifically identified in writing as
an amendments thereto and issued as a
Supplemental / Bid Bulletin.
Receipt and Opening of Bids
Class “A” documents
Legal Documents
1. Registration Certificate from SEC, Department of Trade and
Industry (DTI) for sole proprietorship, 3. Cooperative
Development Authority (CDA) for cooperatives
2. Mayor’s permit where the principal place of business of the
prospective bidder is located.
Class “B” documents
Technical Documents
1. Statement of the pros. Bidder of all its ongoing and completed
government and private contracts, incl. Contracts awarded but
not yet started.
2. Philippine Contractors Accreditation Board (PCAB) for
Infrastructure projects
Receipt and Opening of Bids

Financial Documents
1. Audit Financial Statement showing total current assets and
liabilities. Stamped “RECEIVED” by the BIR

2. NFCC or a commitment from a Universal or commercial bank to


extend a credit line. (CLC)

3. Bill of Quantities/ Materials and Bid Form


Eligibility Criteria
Goods Infrastructure/civil works Consulting services
Duly licensed Filipino Duly licensed Filipino Duly licensed Filipino

Duly organized partnership (60%) Duly organized partnership (75%) Duly organized partnership (60%)
Duly organized corporation Joint venture (75%) /(ownership of the Filipino Duly organized corporation
(60% Outstanding Capital Stock) shall not be less than25%) (60% Outstanding Capital Stock)
Duly organized cooperatives (60%) Project is under Treaty or International Duly organized cooperatives (60%)
Agreement
Joint venture (60%) Licensed by PCAB Joint venture (60%)
The bidder have completed at least two (2) Constructors Performance Evaluation
similar contracts and the aggregate contract shall Summary rating and or certificate of
be equivalent to at least the percentage of the completion and owner’s acceptance of the
ABC as required. (50% / 25 % for expendable contract must be satisfactory
supplies)
The largest of these similar contract must be The bidder must have an experience of having
equivalent to atleast half of the percentage of completed 10 years from the date of
ABC submission and receipt of bids
If, NFCC atleast equal to the ABC to be bid; or If, NFCC atleast equal to the ABC to be bid; or

If, CLC must be atleast equal to 10% of the ABC If, CLC must be atleast equal to 10% of the
to be bid ABC to be bid

NFCC = [(current assets minus current liabilities) (K)] minus the value of all going outstanding or uncompleted portions of the project
under ongoing projects, including awarded contracts to be started .
Where; K=
One year or less More than one year – 2 years More than 2 years
10 15 20
First envelope
Submission and Receipt of Bids

e n ts
i r em
l it y requ ponents
bi om
Eligi hnical c
nd tec
A

BAC
SEALED
Don’t open before the
scheduled opening date &
time
Second envelope

on e nt
lC omp
Fin an ci a
Submission and Receipt of Bids
Eligibility requirements
First envelope

ts
me n
y r e quire onents

d t
bilit
Eligi hnical c
e c
o mp The bid security in the prescribed form, amount and validity
An

Technical specifications

• production/delivery schedule
• manpower requirements; and/or
For the procurement • after-sales services/parts, if applicable
of GOODS Sworn statement

For the procurement • It is not “blacklisted”


• all copies submitted are authentic, original,
of CIVIL WORKS
complete and are true and correct
• authorizing the HOPE to verify all the documents
For the procurement submitted;
of CONSULTING • the signatory is the duly authorized representatives
• It complies with the responsibilities of a prospective
SERVICES
or eligible bidder provided in the PBD; and
•It complies with existing laws and standards, in the
case of procurement of services
Submission and Receipt of Bids
Eligibility requirements
First envelope

ts
me n
y r e quire onents

d t
bilit
Eligi hnical c
e c
o mp The bid security in the prescribed form, amount and validity
An

Project Requirements
• Organizational chart for the contract to be bid;
• List of contractor’s personnel, to be assigned to the contract to be bid,
with their complete qualification experience data;
For the procurement •List of contractor’s equipment units, which are owned, leased, and / or
under purchase agreements supported by certification of availability of
of GOODS equipment from the equipment lessor/vendor for the duration of the
project; and

For the procurement


Sworn statement
of CIVIL WORKS
• It is not “blacklisted”
• all copies submitted are authentic, original, complete and are true and
For the procurement correct
• authorizing the HOPE to verify all the documents submitted;
of CONSULTING • the signatory is the duly authorized representatives
• It complies with the responsibilities of a prospective or eligible bidder
SERVICES provided in the PBD; and
•It complies with existing laws and standards, in the case of
procurement of services
Submission and Receipt of Bids
The bid security in the prescribed form, amount, and validity period;
First envelope

ts
me n
y r e quire onents

d t
bilit
Eligi hnical c
e c
o mp Organizational chart for the contract to be bid;
An

List of completed and on-going projects;

Approach, work plan, and schedule

For the procurement List of key personnel to be assigned to the contract to be bid, with
of GOODS their complete qualification and experience data; and

Sworn statement
For the procurement
of CIVIL WORKS • It is not “blacklisted”
• all copies submitted are authentic, original, complete and
are true and correct
For the procurement • authorizing the HOPE to verify all the documents
submitted;
of CONSULTING • the signatory is the duly authorized representatives
SERVICES • It complies with the responsibilities of a prospective or
eligible bidder provided in the PBD; and
•It complies with existing laws and standards
Submission and Receipt of Bids

Second envelope
n ci al
Fina tion/
rm a
Info ments
docu
Submission and Receipt of Bids

Bids shall be received by the BAC


on the date, time, and place
specified in the ITB/RFEI.
Bids incl. eligibility requirements
submitted after the deadline
SHALL NOT BE ACCEPTED by
the BAC.
Bid Security
All bids shall be accompanied by a bid security
Bid security shall be in an amount equal to a percentage of the ABC in
accordance with the following:
FORM OF BID SECURITY AMOUNT OF BID SECURITY
(Equal to Percentage of the ABC)
a) Cash or cashier’s/manager’s check issued by a
Universal or Commercial Bank
b) Bank draft/ guarantee or irrevocable letter of
credit issued by a Universal or Commercial Two per cent (2%)
Bank; provided, however, that it shall be
confirmed or authenticated by a Universal or
commercial Bank, if issued by a foreign bank.

c) Surety bond callable upon demand issued by a


surety or insurance company duly certified by the
Insurance Commission as authorized to issue Five per cent (5%)
such security

d) Any combination of the foregoing Proportionate to share of form w/ respect to total


amount of security
When the Bid Security shall be returned?

After the bidder with the LCRB or HCRB


has signed the contract and furnish
performance security

Bidders declared by the BAC as failed or


post-disqualified and upon submission of a
written waiver of their right to file a motion
for reconsideration and / or protest.
Bid Validity

Shall in no case exceed


the period of one hundred
twenty (120) c.d. from the
date of opening of bids.
Bid Opening
The BAC shall open the bids at the;
Time,
Date,
Place specified in the BidDocs
The BAC shall adopt a procedure ensuring the;

Integrity,
Security,
confidentiality
Preliminary Examination of Bids
The BAC shall check the
me n
ts
quire onents submitted documents of each
First envelope

t y r e
bili omp
Eligi hnical c

bidder against a checklist


d t e c
An

required documents to ascertain


if they are all present

Using a non-discretionary
“PASS/FAIL” criterion
Preliminary Examination of Bids
The BAC shall check the
submitted documents of each
Second Envelope

t
onen
om p
a n c ial C
Fi n
bidder against a checklist
required documents to ascertain
if they are all present

Using a non-discretionary
“PASS/FAIL” criterion
SAMPLE CHECKLIST
Ceiling of Bid Prices

The ABC shall be


the upper limit or
ceiling for acceptable
bid prices
Bid Evaluation for goods/Infrastructure
The BAC shall immediately conduct a detailed evaluation of bids
using non discretionary criteria in considering the following:
Completeness of the bid.

Responsive bill of Quantities/Materials


Responsive bill of Quantities/Materials (free)
Non-responsive bill of Quantities/Materials

Arithmetical corrections
 The BAC shall evaluate on an equal footing to ensure fair and
competitive bid comparison. For this purpose, all bidders shall be
required to include the cost of all taxes.

 In case of discrepancies between:


AREAS OF DISCREPANCIES PREVAILING AREA
Bid price in figures Bid price in words Bid price in words
Total price per item Unit price for the item as Unit price for the item as
extended or multiplied by extended or multiplied
the quantity of that item by the quantity of that
item
Stated total price Actual sum of prices of Actual sum of prices of
component items component items
Unit cost in the detailed Unit cost in the bill of Unit cost in the bill of
estimate quantities quantities
 Bids shall be ranked in the ascending order of their total calculated bid
prices, as evaluated and corrected for computational errors. WARNING! total
calculated bid prices, as evaluated and corrected for computational errors and
other modifications, which exceed the ABC shall be disqualified.

 After all bids have been received, opened, examined, evaluated, and
ranked, the BAC shall prepare the corresponding abstract of bids. All
members of the BAC shall sign the AoB and attach thereto all the bids with
the corresponding bid securities and the minutes of the proceedings of the
bidding. The Abstract shall contain the following:

 Name of the contract and its location, if applicable


 Time, date, and place of bid opening; and

 Names of bidders and their corresponding bid prices


arranged from lowest to highest, the amount of bid security
and the name of the issuing entity
REMEMBER!

From submission and receipt of bids until the approval by


the HOPE of the ranking of short listed bidders, those that
have submitted their bids are PROHIBITED from
making any communication with any BAC member,
including its staff and personnel, as well as its BAC
secretariat and TWG, regarding matters connected to their
bids. However, the BAC, through its Secretariat, may ask
in writing the bidder for clarification of its bid. All
responses to requests for clarification shall be in writing.
Bid Evaluation of short listed bidders for consulting services

The purpose of bid evaluation is to determine the Highest Rated Bid (HRB)
using the following steps:

Quality-Based Evaluation Procedure


1. A two-stage procedure shall be adopted whereby each
consultant shall be required to submit his technical and
financial proposals simultaneously in separate sealed
envelopes.

2. After receipt of bids, the technical proposals shall first be


opened and evaluated. The BAC shall rank the consultants
in descending order based on the numerical ratings of their
technical proposals and identify the HRB. Provided,
however, that the HRB shall pass the minimum score
indicated in the Bidding Documents.
Bid Evaluation of short listed bidders for consulting services

3. The HOPE shall approve or disapprove the


recommendations of the BAC within two (2) calendar days
after receipt of the results of the evaluation from the BAC.

4. After approval by the HOPE of the HRB, its financial


proposal shall then be opened. The BAC shall, within three
(3) cd. Notify and invite the consultant with the HRB for
the opening of financial proposal for the purpose of
conducting negotiations with the said consultants. In the
letter of notification, the BAC shall inform the consultant of
the issues in the technical proposal the BAC may wish to
clarify during the negotiations.

5. The total contract amount shall not exceed the ABC as


stated in the BidDocs.
Bid Evaluation of short listed bidders for consulting services
(Graphic Presentation)
THE BAC shall Arranged in
Consultant A
open the Technical Descending order based
Proposals on numerical rating
Technical Financial
Proposal Proposal
Co
B– nsul
Technical 97 tant
.50
Proposal %
of
Consultant B Consultant
A

Technical Financial
Proposal Proposal
BAC Technical Co
n
Proposal A sulta
– 8 nt
of 5%
Consultant
B

Consultant C

Technical Financial Co
Technical n
Proposal C – sult
Proposal Proposal 80 ant
%
of
Consultant
B
Bid Evaluation of short listed bidders for consulting services
(Graphical Presentation)
Arranged in
Descending order based
on numerical rating

Co
B– nsul
97 tant
.50
%

HRB HEAD OF THE PROCURING ENTITY BIDS & AWARDS COMMITTEE

Within two (2) days: After 3 days, the BAC shall notify
Co
n and invite the consultant with HRB
A sulta
– 8 nt APPROVE for the opening of the
5%

DISAPPROVE
Financial
The recommendations of the BAC proposal of
Consultant
B

Co
n
C – sulta
80 nt
%
And for the NEGOTIATION
Bid Evaluation of short listed bidders for consulting services
(Graphical Presentation)
FINANCIAL
PROPOSALS

Opened by the BAC


C
Return to the
respective
consultants
UNOPENED
Bid Evaluation of short listed bidders for consulting services

The purpose of bid evaluation is to determine the Highest Rated Bid (HRB)
using the following steps:

Quality-Cost Based Evaluation Procedure


1. The technical proposal together with the financial proposal
shall be considered in the evaluation of consultants. The
technical proposals shall be evaluated first. The financial
proposal of the consultants WHO MEET THE
MINIMUM TECHNICAL SCORE shall then be opened.

2. The financial and technical proposal shall be given


corresponding weights with the financial proposal given a
minimum weight of fifteen percent (15%) up to a maximum
of forty percent (40%). The weight of the technical criteria
shall be adjusted accordingly such that their total weight in
percent together with the weight given to the financial
proposal shall add to one hundred percent (100%).
Bid Evaluation of short listed bidders for consulting services
The exact weight SHALL BE APPROVED BY THE HOPE
upon the recommendation of the BAC and indicated in the
BidDocs. The BAC shall rank the consultants in descending
order based on the combined numerical ratings of their technical
and financial proposals and identify the HRB.

3.The HOPE shall approve and disapprove the


recommendations of the BAC within two (2) cd after receipt of
the results of the evaluation from the BAC.

4.After approval by the HOPE of the HRB, the BAC shall


within three (3) cd, notify and invite the consultant with the
HRB for negotiation.
Bid Evaluation of short listed bidders for consulting services
(Graphic Presentation)
THE BAC shall Afterwhich, the BAC
Consultant A
open the Technical shall open the Financial
Proposals Proposals
Technical Financial
Proposal Proposal

Technical Financial
Proposal Proposal
of of
Consultant B Consultant
A
Consultant
A

Technical Financial
BAC
Proposal Proposal
Technical Financial
Proposal Proposal
of of
Consultant Consultant
B B

Consultant C

Technical Financial Financial


Technical
Proposal Proposal Proposal
Proposal
of
of
Consultant
Consultant
C
C
Bid Evaluation of short listed bidders for consulting services
(Graphic Presentation)
THE BAC shall Afterwhich, the BAC WEIGHTS
open the Technical shall open the Financial
Proposals Technical
Proposals (dependent to
the weight of ?
+
Technical Financial
the Financial)
Proposal Proposal
of of Financial
Consultant Consultant
A A weights is 15 % - 40 %
within 15 % -
40 %

+
Technical Financial
Proposal Proposal TOTAL 100%
of
Consultant
of
Consultant
WEIGHT
B B

The highest rating after adding


the scores of Technical and

+
Financial
Financial proposals shall be
Technical
Proposal
Proposal recommended to the HOPE for
of
of
Consultant
Consultant HRB.
C
C
Bid Evaluation of short listed bidders for consulting services
(Graphical Presentation)
Rating
(Technical + Financial)

Co
B– nsul
97 tant
.50
%

HRB HEAD OF THE PROCURING ENTITY BIDS & AWARDS COMMITTEE

Within two (2) days: After 3 days, the BAC shall notify
Co
n and invite the consultant with HRB
A sulta
– 8 nt APPROVE for NEGOTIATION
5%

DISAPPROVE

The recommendations of the BAC

Co
n
C – sulta
80 nt
%
Criteria in evaluating technical proposals of consultants

• Quality of personnel to be assigned to the project which covers suitability of


key staff to perform the duties of the particular assignments and general
qualifications and competence including education and training of the key staff

• Experience and capability of the consultant which include records of previous


engagement and quality of performance in similar and in other projects;
relationship with previous and current clients; and overall work commitments,
geographical distribution of current/impending projects and attention to be
given by the consultant

• Plan of approach and methodology with emphasis to clarity, feasibility,


innovativeness, and comprehensiveness of the plan approach, and the quality of
interpretation of project problems, risks and suggested solutions
REMEMBER!

All participating short listed consultants


shall be furnished the results (ranking
and total scores only) of the evaluation
after the approval of the HOPE of the
ranking. Said results shall be posted in
the PhilGEPS and the website of the PE
What should be discussed in the Negotiation stage?

• Discussion and clarification of the TOR and Scope of Services;


• Discussion and finalization of the methodology and work program proposed by
the consultant;

• Consideration of appropriateness of qualifications and pertinent compensation,


number of man-months and the personnel to be assigned to the job, taking note
of over-qualified personnel, to be commensurate with the compensation of
personnel with the appropriate qualifications, and schedule of activities;

• Discussion on the services, facilities and data, if any, to be provided by the PE


concerned;

• Discussion of financial proposal submitted by the consultant; and


• Provisions of the contract

Shall be completed within ten (10) calendar days. There should be no replacement
of key personnel before the awarding of contract.
Objective and process of Post-qualification

• The LCB/HRB shall undergo post-qualification in order to determine whether


the bidder concerned complies with and is responsive to all the
requirements and conditions as specified in the BidDocs.

• Within three (3) cd from receipt by the bidder of the notice from the BAC that
the bidder has the LCB or HRB, the bidder shall submit the following
requirements to the BAC:

1. Tax clearance;

2. Latest income and business tax returns;

3. Certificate of PhilGEPS registration; and

4. Other appropriate license and permits required by law and stated in the

BidDocs.
Objective and process of Post-qualification

• The post qualification shall verify, validate, and ascertain all statements
made and documents submitted by the bidder with the LCB/HRB, using non-
discretionary criteria. This criteria shall not be limited to, the following:

A. Legal Requirements. To verify, validate, and ascertain licenses,


certificates, permits, and agreements submitted by the bidder, and
the fact it is not included in any “blacklisted”.

B. Technical Requirements. To determine compliance of the goods,


infrastructure projects, or consulting services offered with the
requirements specified in the BidDocs, including:

i. Verification and validation of the bidder’s stated competence and


experience, and the competence and experience of the bidder’s key
personnel to be assigned to the project, for the procurement of
infrastructure projects and consulting services;
Objective and process of Post-qualification

ii. Verification of availability and commitment, and / or inspection and


testing for the required capacities and operating conditions, of
equipment to be owned/leased;

iii. Verification and/or inspection and testing of the goods/product, after-


sales and / or maintenance capabilities, and;

iv. Ascertainment of the sufficiency of the bid security as to type,


amount, form and wording, and validity period;

C. Financial Requirements. To verify, validate and ascertain the bid


price proposal of the bidder and, whenever applicable, the required
CLC in the amount specified and over the period stipulated in the
BidDocs, or the bidder’s NFCC to ensure that the bidder can sustain
the operating cash flow of the transaction.
If the BAC determines that the bidder with the LCB/HRB passes all the
criteria for post-qualification, it shall declare the said bid as the LCRB/HRRB, and
recommend to the HOPE the award of contract, however, if the BAC determines
that the bidder with the LCB/HRB fails the criteria for post-qualification, it shall
immediately notify the said bidder in writing of its post-qualification and the
grounds for it. Immediately after the BAC has notify the first bidder of its post-
qualification, and notwithstanding any pending request for reconsideration thereof,
the BAC shall initiate and complete the same post-qualification process on the
bidder with the second lowest LCB/HRB. If the second passes the post-
qualification, and provided that the request for reconsideration of the first bidder
has been denied, the second bidder shall be post-qualified as the bidder with the
LCRB/HRRB. If the second bidder, however, fails the post-qualification, the
procedure for post-qualification shall be repeated for the bidder with the next
LCB/HRB, and so until the LCRB/HRRB, as the case maybe, is determined for
award.

The post-qualification process shall be completed in not more than


seven (7) cd from the determination of LCB/HRB. In exceptional cases, the post-
qualification period may be extended by the HOPE, but in no case shall aggregate
period exceed thirty (30) cd.
FAILURE OF BIDDING

The BAC shall declare the bidding of failure when:

• No bids are received;


• All Prospective bidders are declared ineligible;
• All bids fail to comply with all the bid requirements or fail-
post qualification, or, in the case of consulting services,
there is no successful negotiations; or

• The bidder with the LCRB/HRRB refuses, without


justifiable cause, to accept contract, and no award is made
in accordance with Section 40 (failure to enter into
contract and post – security ) of the act and this IRR
In order to determine the reason for the failed bidding, the BAC
shall conduct a mandatory review and evaluation of the terms, conditions,
and specifications in the BidDocs, including its cost estimates. Based on its
findings, the BAC shall revise the terms, conditions, and specifications, and
if necessary, adjust the ABC, subject to the required approvals, and conduct
a re-bidding with re-advertisement and/or posting.

All bidders who have initially responded to the Invitation to


Bid/Request for Expression of Interest and have been declared eligible or
shortlisted in the previous biddings shall be allowed to submit new bids.

The BAC shall observe the same process and set the new periods
according to the same rules followed during the previous bidding(s).

Should there occur a second failure of bidding, the procuring


entity may resort to negotiated procurement.
SINGLE CALCULATED/RATED AND RESPONSIVE BID

A single calculated/responsive bid shall be considered for award if it falls under any
of the following circumstances:

• Only one prospective bidder submit a LOI and/or applies for eligibility check,
and it meets the eligibility requirements of the criteria, after which it submits a
bid which is found to be responsive to the bidding requirements;

• More than one prospective bidder submits LOI and/or applies for eligibility
check, but only one bidder meets the eligibility requirements of the criteria,
after which it submits a bid which is found to be responsive to the bidding
requirements; or

• If after the eligibility check, more than one bidder meets the eligibility
requirements, but only one bidder submits a bid, and its bid is found to be
responsive to the bidding requirements.
NOTICE AND EXECUTION OF AWARD

The BAC shall recommend to the HOPE the award contract to the bidder with
the LCRB/HRRB or the SCRB/SRRB after the post-qualification process has
been completed.
To facilitate the approval of the award, the BAC shall submit the following
supporting documents to the HOPE:

• Resolution of the BAC recommending award;


• Abstract of bids;
• Duly approved program of work or delivery schedule and cost estimates;
• Document issued by appropriated entity authorizing the procuring entity to
incur obligation for a specified contract; and

• Other pertinent documents required by existing laws, rules, and/or the


procuring entity concerned
If the award is approved, the HOPE shall immediately
issue the Notice of Award to the bidder with LCRB/HRRB. In
the event that the HOPE shall disapprove such
recommendation, such disapproval shall be based only on
valid, reasonable, and justifiable grounds to be expressed
in writing, copy furnished by the BAC.

Contract award shall be made within the bid security


period provided in Section 28 (bid validity – shall not exceed
120 cd. – the PE can request for extension but the bidder can
deny it without forfeiting their bid security).

The BAC, through the Secretariat, shall post, within,


three (3) cd from the issuance, the Notice of Award in the
PhilGEPS, the website of the procuring entity, if any, and any
conspicuous place in the premise of the procuring entity
CONTRACT SIGNING

The winning bidder shall post the REQUIRED PERFORMANCE


SECURITY and enter into contract with the procuring entity within (10) cd
from the receipt by the winning bidder of the NoA. The procuring entity shall
enter into contract within the same period provided that all documentary
requirements are complied with, to wit:

• Contract Agreement;
• Bidding Documents;
• Winning bidder’s bid, including proposals submitted;
• Notice of Award of Contract;
Procedural Steps for the Public Bidding of Goods and
Services ( Revised IRR, GPPB Res. 03-2009 )
1 c.d.
.Posting – 7 c.d.

Pre-Procurement Issue Bidding Call/Hold Pre-Bid


Advertise/Post ITB
Conf. Documents Conference

Pre-Bid C. at least 12 c.d. before bid opening

Receive the Open Technical (with Open Evaluate &


Two (2) eligibility documents) Financial Rank Bid/s
Envelopes Envelope Envelope
7 c.d.

1 c.d.

Approve Resolution Prepare & Issue


Submission of Post-qualify
/ Issue Notice Sign Contract Notice to
Additional Req. LCB
of Award - LCRB Proceed
Within 3 c.d. Within 30 c.d. 7 c.d. Within 10 c.d.
GOCC/GFIs- 15cd within 3 c.d.
PERIOD OF ACTION ON PROCUREMENT ACTIVITIES

This procurement process shall not exceed


three (3) months Award of
Op Contract
of enin
Bi g
ds

All members of the BAC shall be on a


“jury duty” type of assignment until
the NoA is issued by the HOPE in order to
complete the entire procurement process at the
earliest possible time.
PERFORMANCE SECURITY

To guarantee the faithful


performance by the winning bidder
of its obligations under the contract
in accordance with the BidDocs, it
shall post performance security
prior to the signing of contract.
PERFORMANCE SECURITY

The performance security shall be in an amount equal to a percentage of the


total contract price in accordance with the following schedule:

Form of Performance Security Amount of Performance Security (Equal to


percentage of the total contract price)

a) Cash or cashier’s/manager’s check issued by a


Universal or Commercial Bank Goods and Consulting Services – Five percent (5%)

b) Bank draft/guarantee or irrevocable letter of credit Infrastructure Projects – Ten percent (10%)
issued by a Universal or Commercial bank; provided
however, that it shall be confirmed or authenticated
by a foreign bank.

c) Surety bond callable upon demand issued by a


surety / insurance company duly certified by the Thirty percent(30%)
Insurance commission as authorized to issue such
security.

d) Any combination of the foregoing Proportionate to share of form with respect to total
amount of security
The performance security shall be denominated in Philippine
pesos and posted in favor of the procuring entity, which shall be forfeited
in the event it is established that the winning bidder is in default in any
of its obligations under the contract.

The performance security shall remain valid until issuance by the


procuring entity of the final Certificate of Acceptance.

The performance security may be released by the PE after the


issuance of CA, subject to the following conditions:
• PE has no claims filed against the contract awardee or the
surety company;

• It has no claims for labor and materials filed against the


contractor; and

• Other terms of the contract


FAILURE TO ENTER INTO CONTRACT AND POST PERFORMANCE
SECURITY

If the bidder with LCRB/HRRB or the bidder with Single


Calculated/Rated Responsive Bid, fails, refuses or is unable to submit
documents required or make good its bid by entering into a contract with the
procuring entity or post the required Performance Security within the period
of 10 cd, the bid security shall be forfeited and with appropriate sanctions,
except where such failure, refusal, or inability is through no fault of the said
bidder.

In case of failure, the BAC shall disqualify the said bidder and shall
initiate and complete post-qualification process on the bidder with the second
LCB/HRB. This procedure shall be repeated until LCRB/HRRB is
determined for award.
RESERVATION CLAUSE
The HOPE reserves the right to reject any and all bids, declares a
failure to bidding, or not award the contract in the following situations:
• If there is prima facie evidence of collusion between:
 Appropriate public officers or employees of the procuring entity;

 BAC and any of the bidders;

 Among the bidders themselves;

 Bidder and a third party, including any act which restricts,


suppresses, or nullifies or tends to restrict, suppress or nullify
competition;

• If the BAC is found to have failed in following the prescribed bidding procedures; or
RESERVATION CLAUSE
• For any justifiable and reasonable grounds where the award of the contract will not
redound to the benefits of the GOP, as follows:

 If the physical and economic conditions have significantly changed


so as to render the project no longer economically, financially, or
technically feasible, as determined by the HOPE;

 If the project is no longer necessary as determined by the HOPE;

 If the source of funds for the project has been withheld or reduced
through no fault of the PE.
DISCLOSURE OF RELATIONS
All bid shall be accompanied by a SWORN STATEMENT of the bidder that it
is not related to the HOPE, members of the BAC, the TWG, and the BAC secretariat,
the head of the PMO or the end-user unit, and the project consultants, by consanguinity
or affinity up to the THIRD CIVIL DEGREE.

For this reason, relation to the aforementioned persons shall automatically


disqualify the bidder from participating in the procurement of contracts of the PE.
This apply to thefollowing persons:

 If the bidder is an individual or a sole proprietorship, to the bidder himself;

 If the bidder is a partnership, to all its officers and members;

 If the bidder is a corporation, to all its officers, directors, and controlling


stockholders; and
ALTERNATIVE METHODS OF PROCUREMENT
The method of procurement to be used shall be indicated in the approved
APP. If the original mode of procurement recommended in the APP was public bidding
but cannot be ultimately pursued, the BAC, through a resolution, shall justify and
recommend the change in the mode of procurement to be approved by the HOPE.

• LIMITED SOURCE BIDDING

-Otherwise known as “selective bidding”, is a method of procurement of


goods and consulting services that involves direct invitation to bid by the
procuring entity from the list of pre-selected suppliers or consultants with
known experience and proven capability on the requirements of the particular
contract. This alternative mode of procurement may be employed under any
of the following conditions:

 Procurement of highly specialized types of goods and consulting


services whereby only a few suppliers or consultant are known to be
available; or

 Procurement of major plant components


ALTERNATIVE METHODS OF PROCUREMENT

• DIRECT CONTRACTING

- is also known as “single source procurement”. Is a method of procurement


of goods that does not require elaborate bidding documents. The supplier is
simply asked to submit a price quotation or a pro-forma invoice together with
the conditions of sales.

Direct contracting may be resorted to under any of the following conditions:

 Procurement of goods of proprietary nature which can be obtained only


from the proprietary source;

 When the procurement of critical plant components from a specific


supplier ;

 Those sold by an exclusive dealer or manufacturer.


ALTERNATIVE METHODS OF PROCUREMENT

• REPEAT ORDER

- repeat order, when provided for in the APP, is a method of procurement of


goods from the previous winning bidder, whenever there is a need to
replenish goods procured under a contract previously awarded through
Competitive bidding.

Repeat order may be resorted to under any of the following conditions:

 Unit prices of the repeat order must be the same as or lower that those in
the original contract;

 will not result to splitting of contracts, requisitions, or purchase orders;

 shall be availed of only within six (6) months from the contract effectivity
date stated in the NTP arising from the original contract; and

 shall not exceed twenty-five percent (25%) of the quantity of each item in
the original contract.
ALTERNATIVE METHODS OF PROCUREMENT

• SHOPPING

- is a method of procurement of goods whereby the PE simply requests for


the submission of price quotations for readily available off-the-shelf goods or
ordinary/regular equipment to be procured directly from suppliers of known
qualifications.

Shopping may be employed in any of the following cases:

a) when there is an unforeseen contingency requiring immediate purchase:


Provided however that the amount shall not exceed the thresholds prescribed.

b) Procurement of ordinary or regular office supplies and equipment not


available in the procurement service involving an amount not exceeding the
thresholds prescribed.
TAKE NOTE!

“Ordinary or regular office supplies” shall be understood to


include those supplies, commodities, or materials, which,
depending on the procuring entity’s mandate and nature of
operations, are necessary in the transaction of its official
businesses, and consumed in the day-to-day operations.

However, office supplies shall not include services such as


repair, and maintenance of equipment and furniture, as well as
trucking, hauling, janitorial, security, and related or analogous
services.
THRESHOLDS FOR SHOPPING – (a)
a. For NGAs, GOCCs, GFIs, and SUCs - One Hundred Thousand Pesos (P100, 000.00)

b. For LGUs, in accordance with the following schedule:

Maximum Amount (in Philippine Peso)


DOF Classification of LGU’s
Province City Municipality

1st class 100,000 100,000 50, 000


2nd class 100,000 100,000 50, 000
3rd class 100,000 80, 000 50, 000
4th class 80, 000 60, 000 50, 000
5th class 60, 000 50, 000 50, 000
6th class 50, 000 50, 000 50, 000
In case of barangays - Fifty Thousand Pesos (P50, 000.00)
THRESHOLDS FOR SHOPPING & SVP– (b)
a. For NGAs, GOCCs, GFIs, and SUCs - Five Hundred Thousand Pesos (P500, 000.00)

b. For LGUs, in accordance with the following schedule:

Maximum Amount (in Philippine Peso)


DOF Classification of LGU’s
Province City Municipality

1st class 500,000 500,000 100, 000


2nd class 500,000 500,000 100, 000
3rd class 500,000 400, 000 100, 000
4th class 400, 000 300, 000 50, 000
5th class 300, 000 200, 000 50, 000
6th class 200, 000 100, 000 50, 000
In case of barangays - Fifty Thousand Pesos (P50, 000.00)
ALTERNATIVE METHODS OF PROCUREMENT

• NEGOTIATED PROCUREMENT

- is a method of procurement of goods, infrastructures, and consulting


services, whereby the PE directly negotiates a contract with a technically,
legally, and financially capable supplier, contractor or consultant in any of
the following cases.

1. Two – Failed Biddings

- After conduct of mandatory review, the BAC shall revise and


agree on the minimum technical specifications, and if necessary,
adjust the ABC. However, the ABC cannot be increased by more
than twenty percent (20%) of the ABC for the last failed
bidding.

- The BAC shall invite and engage in negotiations with a sufficient


number of suppliers, contractors, or consultants to ensure effective
competition.
ALTERNATIVE METHODS OF PROCUREMENT
- Any requirements, guidelines, documents, clarifications, and
other information shall be communicated by the PE to suppliers,
etc. On an equal basis.

- Following the completion of the negotiations, the PE shall request


all suppliers, etc to submit, on a specified date, a best and final
offer with respect to all aspects of their proposals.

-The procuring entity shall select the successful offer on the basis
of such best and final offers.

-In all stages of the negotiations, observers shall be invited.

2. Emergency Cases.

- In case of imminent danger to life or property during a state of


calamity, or when time is of the essence of arising from natural or
man – made calamities or other causes where immediate action is
necessary to prevent damage to or loss of life or property, or to
restore vital public service and public utilities.
ALTERNATIVE METHODS OF PROCUREMENT

3. Agency – to - Agency

- Procurement of infrastructure projects, consulting services, and


goods from another agency of the GOP, such as the PS – DBM,
which is tasked with a centralized procurement of Common-Use
supplies for the GOP.

4. Procurement Agent

- Procuring entities which may not have the proficiency or


capability to undertake a particular procurement, as determined by
the HOPE, may request other GOP agencies to undertake such
procurement for them, or at their option, result and hire consultants
to assist them directly and/or train their staff in the management of
the procurement functions.
ALTERNATIVE METHODS OF PROCUREMENT

5. Highly Technical Consultants.

- Individual consultants hired to do work that is (i) highly technical (ii)


primarily confidential where trust and confidence are the primary
consideration for the hiring of consultant. Provided, however, shall, at the
most, be on six month basis, renewable at the option of the HOPE, but in no
case shall exceed the term of 6 months.

6. Defense Cooperation Agreement.

- Upon approval by the President of the Philipines, and when the


procurement for use by the AFP involves major defense equipment or
materials and/or defense-related consultancy services, when expertise
required is not available locally, and the Secretary of National Defense has
determined that the interests of the country shall be protected by negotiating
directly with an agency or instrumentality of another country with which the
Philippines has entered into a defense cooperation agreement or otherwise
maintains diplomatic relations: Provided, however, that the performance by
the supplier of its obligations under the procurement of contract shall be
covered by a performance security.
ALTERNATIVE METHODS OF PROCUREMENT

7. Small Value Procurement.

- Where the procurement does not fall under shopping and the
amount does not exceed the thresholds prescribed.

 The procuring entity shall draw up a list of at least three (3)


suppliers, contractors, or consultants, of known qualifications
which will be invited to submit proposals, in the case of goods and
infrastructure projects, or curriculum vitae, in the case of
consulting services.

8. Lease of Real Property

9. NGO Participation.

- When an appropriation law or ordinance earmarks an amount to


be specifically contracted out to NGO, the PE may enter into a
Memorandum of Agreement with an NGO.
ALTERNATIVE METHODS OF PROCUREMENT

10. Community Participation.

11. United Nations Agencies.

- Procurement from specialized agencies of the United Nations of


any of the following:

 Small quantities of-the-shelf goods, primarily in the fields of


education and health; and

Specialized product where the number of suppliers is limited,


such as vaccines or drugs.
TERMS AND CONDITIONS FOR THE USE OF ALTERNATIVE
METHODS

• Except for Limited Source Bidding under section 49 of this IRR,


submission of bid securities may be dispensed with.

• Performance and warranty security shall be submitted for


contract acquired through the alternative methods of procurement
except for:

 Shopping

 Negotiated Procurement: emergency cases, SVP, lease of real


property and UN agencies.
DELIVERY, INSPECTION, &
ACCEPTANCE
DELIVERIES

Deliveries of supplies must be made by the


Supplier/Manufacturer/Contractor within the stipulated period and
at the place/s indicated in the purchase order of the contract.

In all cases, delivery shall be made within office hours and


during working days.

Failure to deliver within the prescribed period, the


supplier/manufacturer/contractor shall be liable for penalty,
usually in the form of liquidated damages specified in the
Contract/Purchase Order.
LIQUIDATED DAMAGES
Liquidated damages
of the undelivered
items in the contract deducted
for each day of delay

1 % of the undelivered
items/delays
DELIVERIES
 All supplies shall be adequately contained, packed,
crated, cased, bundled, wrapped, or sealed to prevent
damage, spoilage, and loss.

 They must be properly labelled and marked in


accordance with the minimum requirements of RA 7394
otherwise known as Consumer Act of the Philippines.

 Responsibility in case of damage, spoilage, or loss


shall be governed by existing laws on the matter unless
the purchase order or contract provides otherwise.
DELIVERIES

 Deliveries shall be made within seven(7) calendar


days upon receipt of the order unless otherwise provided
in the Purchase Order or contract.

 All items delivered SHALL BE RECEIVED BY


THE SUPPLY OFFICER/DESIGNATED
PROPERTY CUSTODIAN as the case may be.
Receiving and signing of the DR and temporary
recording of the deliveries shall be subjected to
inspection by the Inspectorate Team.
INSPECTION
INSPECTION

?
sp ection
n
t is I
Wha

Inspection is the process of examining and testing


the procured supplies, materials, equipment, and services
including raw materials and components to determine
their conformity with the contract requirements including
all applicable drawings, specifications, and purchase
description.
INSPECTION
 The inspection of items SHALL BE DONE BY
THE INSPECTORATE TEAM, whose members shall
be determined and designated by the HOPE.

 Inspection shall be done in accordance with the


standards and specifications and be conducted in the
presence of the suppliers and end-user’s representatives.

 The Inspectorate Team and the Supply


Officer/Designated Property Custodian SHALL
PREPARE AND SIGN the Inspection and Acceptance
Report (IAR).
TECHNIQUES OF INSPECTION
• Inspection by Item
- Individual item is checked in conformity with the
requirement stated in the specification. This method
of inspection is applicable, but not limited to
deliveries of equipment and fixed assets.

• Inspection by Sampling

- Sampling is a process of obtaining information


about a group of data having similar purpose or
function, usually ten percent (10%) of the total or lot
delivery.
General Procedures in Conducting Inspection

1. Upon receipt of the request for inspection, check the


following documents as their completeness and
authenticity.
A. Purchase Order & Contract

 Date;
 PO Number
 Name and Address of the Supplier
 Supplier’s Acknowledgement or Receipt (date of receipt)
 Specifications
 Quantity
 Unit/Total Price
 Availability of fund
 Approval of the HOPE or his duly authorized representative
General Procedures in Conducting Inspection
B. Supplier’s Invoice Delivery Receipt

 Pre-numbered and not just typed stamped or hand-written

 Date checked against the delivery date stated in the P.O or


contract

 “RECEIVED” portion Receipt and date of item delivered


acknowledged by the supply officer/designated property
custodian.

C. Conduct inspection and testing procedure when applicable.

D. Prepare inspection report immediately and give to the


Inspectorate Team and supply officer/designated property
custodian for signature.
Inspection Procedures for Equipment
1. Examine the equipment as to the physical condition: brand new, second
hand, rebuild, or reconditioned. See to it that no defective or old worn out
parts are used/attached to the equipment.

2. Take hold of the manual, catalogue or handbook for equipment delivered


for reference. All date/information contained thereon should conform with
the delivery of the serial number, point of origin, color, and the accessories
or tools that go with the equipment.

3. Make a physical count and inspect the unit piece-by-piece or unit-by-unit.


Random sampling is not applicable for this type of delivery because you
have to request the supplier or his representative to demonstrate the
operation of the equipment (test run) in your presence and that of the end-
user. Observes the actual performance thereof.

4. Get the warranty card and note down the warranty card number in the
original invoice. Check if the serial indicated thereon is the same as that of
the delivery.
Inspection & Acceptance of Infra Projects
1. The Head/End-user/Implementing Office/Property Officer/etc. must secure
copy of the Program of Works prior to the start of the construction.

2. The End-user must seek assistance from the technical person (TWG for the
project) to check the materials that are being used during the construction if
they are in accordance with the required specifications.

3. The End-user (usually the Head) shall sign the Certificate of Acceptance
(CA)/Certificate of Turnover only after the issuance of the 100%
completion report by the project engineer. The same certificate shall also be
signed by the Division Physical Facilities Officer.

4. The End-user (usually the Head) shall issue a Certificate of Non-


compliance if the works are not in accordance with the specifications or
standards.
Documentary Requirements for Inspection

1. General Requirements for Inspection of


deliveries/fabrication/installation

 Original copy of approved contract/PO

 Original Invoice/ Delivery Receipt

 Performance/Quality Test Result (if applicable)

 Other documents specified in the contract necessary to


determine conformance with specifications (e.g. Approved
plans/samples, standard specifications, etc. )
Documentary Requirements for Inspection

1. Inspection of Infrastructure Project for construction, repairs and


rehabilitation

 Statement of Work Accomplishment (SWA)


 Certificate of completion for final payment
 Certificate of Final Acceptance (CFA) for release of retention money
 Approved original contract
 Approved Program of Works

2. Post-repair Inspection for repairs

 Approved job order/work order/contract


 Certificate of Acceptance
 Waste Materials reports, if applicable
Acceptance or Rejection of Deliveries of Goods

 The Inspectorate Team may recommend a REJECTION /


REDUCTION OF PRICE when their is a SHORTAGE IN QUANTITY,
DEFICIENCY, OR DEFECTIVENESS IN QUALITY.

After consideration of 10% tolerable allowance based on


standards, the following shall be observed by the Inspectorate Team in the
evaluation of the result of the inspection:

 Supplies or property tested and found to be in accordance with the


approved PO/Contract and with the required specifications SHALL BE
ACCEPTED;

 Supplies or property whose quality analysis shows deficiency of


less than ten percent (10%) may be accepted, provided that they shall serve
the purpose for which they were purchased. The defect is minor and the
contract price is reduced according to the deficiency noted;
Acceptance or Rejection of Deliveries of Goods

 Supplies or property whose quantity is short by volume, weight,


actual count, etc. Shall be subjected to reduction on contract price at an
amount equivalent to the shortage, provided that the said deliveries are
acceptable to the agency or unit; and

 Damaged items that are not disclose or incorrectly marked as such


shall be subjected to corresponding reduction in the contract.

 Acceptance of deliveries maybe made only if the supplies and


materials delivered CONFORM TO THE STANDARDS AND
SPECIFICATIONS STATED IN THE CONTRACT/PO
Acceptance or Rejection of Deliveries of Goods

 If the supplier failed to comply with the requirements, the


property/supply officer shall submit a report to the HOPE for
appropriate actions. The HOPE may forfeit the contractor’s
performance bond, if any, and may also institute civil actions
against the contractors for breach of contract.

 The supply officer/ designated property custodian shall be


responsible for accepting deliveries of procured items and should
notify the Auditor within five (5) days upon receipt of the
approved contract/PO.
CUSTODIANSHIP
PROPERTY CUSTODIANSHIP

s t od i a n shi p?
Wh at i s cu

Property custodianship refers to the guardianship of


government property by the accountable person.

This includes the receipt, safekeeping, issuance, repair,


and maintenance of supplies, materials, and equipment.

The designated property custodian/officer is responsible,


accountable and liable for any loss, misuse, damage, or
deterioration of government property due to fault or negligence in
safekeeping which may be physical or destructive
Storage / Warehousing

ou s i n g?
h a t i s wareh
W

Storage/ Warehousing refers to the scientific and


economical warehousing of materials for their best safekeeping
and availability.

Best safekeeping means protecting the materials against


theft, fire, and deterioration but easily accessible when needed.

The method or systems include factors and procedures in


the manner of undertaking due care and maintenance of good
condition of the property.
Factors to be considered in Storage and Warehousing:

1. Site Location and size of storage/stockroom to use

Generally, selection of site location, type and size of


storage of stockroom to be used, play a major role for an
effective storage and Warehousing management. It is
important factor for the following purposes:

 To be able to figure out the amount of materials that can be


stored;
 For determination of access for efficient and proper transport
of supplies and materials;
 For provision of large size of doorways and entrances;
 For installation of proper lightings and ventilation.
Factors to be considered in Storage and Warehousing:

1. Special layout planning for materials to be stored.

For easy facilitation, space layout for materials to be


stored should be planned. Specifically the layout should
contain the placement of supplies by category, type, similarity,
popularity, sizes, shapes, characteristics and to include
perishability.

It is important that materials be stored and placed in its


proper places to avoid accidents and wastage.
Factors to be considered in Storage and Warehousing:

1. Types of stacking suitable for each type of property

In like manner as in space layout planning, types of


stacking for each type of materials should be given careful
planning. It may be classified into:

i. Bulk storage

ii. Medium Lot Storage; and

iii. Small Lot Storage


Procedures in Storage / Warehousing

1. Receipt of Materials and Equipment and Other Property

- Supplies, materials, and equipment delivered by the


supplier must be accompanied by Delivery Receipts (DRs)
and/or Sales Invoice (SI), which were pre-inspected by the
supply officer / designated property custodian before the items
are received.

2. Arrangement of Materials

- The storekeeper arranges the materials inside the


warehouse/ stockroom in accordance with the prepared
storage plan.
Procedures in Storage / Warehousing

3. Recording of Receipts/ Deliveries

- The storekeeper properly posts and updates the


information (receipts, issuances and balance on hand)
taken from the IAR.

- Reconciliation of entries of bin cards with


stock/property cards and with the physical count of stock
on hand should be currently and properly updated.
Issuance and Utilization

Issuance and Utilization of supplies and materials and


equipment is among the activities of property custodianship.

 The custodianship of supplies and equipment is transferred


from the Supply Officer/ Designated Property Custodian and
Storekeeper/Warehouseman to the end-user who is responsible and
accountable for the utilization and / or safekeeping.
Procedure in the Requisition
and Issuance of Inventory
Items
Start of Procedure
Requesting Personnel, prepares Requisition Requesting Personnel,
Issuance Slip (RIS) in 3 copies. Fills up all Prepares PR for the
The necessary information except for the Items requested and
Issuance portion and signs “Requested By” Forwards the same to
Portion of the RIS. Forwards the RIS to Property Division for
Authorized Official for approval. Processing of request
Concerned Office, Requesting Personnel
Prepares the Supplies Availability Inquiry
(SAI) in 2 copies. Accomplishes the form
For item description, unit, and quantity.
Fills up the “Inquired by” portion of SAI Authorized Official, signs the
And forwards the same to Accounting “Approved By” Portion of the RIS
Units for processing. B

Requesting Personnel receives


A
Signed RIS and forwards to the Property
Division together with the original
SAI for withdrawal of Inventory items
Accounting Unit, Accounting Staff requested
Receives SAI from Requesting Personnel.
Review and verifies the completeness Requesting Personnel,
Of Information. Receives supplies
requested
And sign in the
“Received by” portion
Property Officer reviews and verifies Of the RIS files
RIS as to completeness of Information. Permanently in num.
Fills up RIS # date, quantity, remarks Order copy 2 of RIS
Accounting Staff, retrieves from file the And initials “Approved by” portion of the And files temporarily
SLC and determines availability/status RIS and records RIS in the logbook The RIS and SAI for the
Of stocks. Fills up the number, stock number,
Preparation of
Status of stock and “Status provided by”
Report of Supplies
Portion of SAI. Returns the original to the
And Materials Issued
Requesting Personnel and files the
(RMSI)
Copy 2 of the SAI
Head of the Property, signs the
Supply officer fills up
“Approved by” portion of RIS and
the and signs
Returns to the Supply Officer for
The “Issuance” portion
B
Issuance of the Stock
of the RIS and issue
inventory items
Requesting Personnel, receives the Requested to the
Original SAI from the Acctg. Staff End – of
Stock No Requesting Personnel
Procedure
Available? A
Illustration on preparation of the issuance documents

SAI

If YES
Available
RIS

N
O

ICS
PR /ARE
GETTING TO KNOW WITH IMPORTANT DOCUMENTS

1. Supplies Availability Inquiry (SAI)


- is a document prepared by the requisitioning officer as a basis
for the preparation of RIS and PR if the supplies/equipment are available or
not available on stock.

2. Requisition and Issuance Slip (RIS)


- is used if the goods/supplies carried in stock based on the SAI received
from the Accounting Unit.

It must be numbered in the following manner as prescribed by COA.


GETTING TO KNOW WITH IMPORTANT DOCUMENTS

3. Purchase Request (PR)

- is accomplished if the goods/supplies/properties are not carried in stock


based on the SAI received from the Accounting Unit.

4. Acknowledgement Receipt for Equipment (ARE)

- is used for PPE accounts when issued to officials and employees other
than the regular property officer. It shall be signed and dated by the
Property officer under “Received from” portion and the recipient shall
acknowledge by signing the documents.
Recording for the Receipt, Issuance and Utilization of
Supplies, Materials & Equipment

The issuance of supplies/materials/equipment SHALL BE


PROPERLY ACCOUNTED FOR.

The Warehouseman/Storekeeper shall maintain bin cards and record the


receipt and issuance of each class of item kept in stock. He/She is likewise
monitor the status of the stock on hand. He shall post the quantity requested
immediately upon withdrawal of the supplies/materials from the stockpile.

The Supply Officer/Stock clerk shall maintain the stock cards for each class
of articles kept in stock. All receipt and issuance of supplies, and the balance on
hand shall be updated.

The bases of recording the receipts and issuance shall be the DR and the RIS
respectively.

The stock card serves as guide in preparing the estimates of the quantity and
description of the articles needed for the year.
Recording for the Receipt, Issuance and Utilization of
Supplies, Materials & Equipment

The stock card will be at the same time serves as guards against overstocking
of supplies and materials.

The Supply Officer shall maintain the Property Card for each class of PPE
reflecting the date of acquisition, description, custody, estimated life
expectancy, depreciation, disposal, and other information about the PPE based
on the source of documents.

The basis of recording the issuance of PPE is the ARE


Reconciliation of Property and Accounting Records

 The accounting of issuance is not complete without the proper


reconciliation of property and accounting records.

 Before the property records can be reconciled with the accounting records,
the Property/Supply Office shall see to it that the existing property records
are reconciled with the actual inventory count.

 The warehouseman/storekeeper may at any time conduct a test count of his


stock to determine whether it tallies with the balance per bid cards.

 Any discrepancies should be noted for further investigation and if necessary,


coordinate with the stock/property clerk to settle the differences.
Repair and
Maintenance
Repair and Maintenance

The repair and maintenance program is


necessary for the purpose of attaining and/or
extending the established economical and
useful life of an equipment/property and
serves as a sound basis for scheduling its
replacement.
Repair Equipment (major / minor)

t i s r ep a ir?
Wha

Repair is the process/act of restoring a property /equipment to its


original state or to its working condition. Unserviceable equipment may at once
be restored to its normal state of efficiency by making repairs.

 Minor repair merely keeps a building of equipment in fit


condition for use without increasing its capacity or otherwise
adding to its normal value as an asset.

i. Fair wear and tear is the condition of equipment worn


out or otherwise rendered unserviceable through use
without apparent fault.
Repair Equipment (major / minor)

Major or extraordinary repair is the alternation, addition, or


installation, general reconditioning, overhauling and the like which materially
increase the value or extend the useful life of the equipment or motor vehicles.

i. Fair wear and tear is the condition of equipment worn


out or otherwise rendered unserviceable through use
without apparent fault.
Repair Equipment (major / minor)
Repair Equipment (major / minor)
Repair Equipment (major / minor)
Repair Equipment (major / minor)
Repair Equipment (major / minor)
Repair Equipment (major / minor)
Return of Unused Supplies & Excess Materials
Inventory Taking
Steps in conducting Inventory Taking
Steps in conducting Inventory Taking
Points to consider in conducting an Inventory
Preparation of Inventory Reports
Inventory – Taking
Inventory – Taking
Disposition of Property Held by Deceased, Incapacitated, Absconding, or
Suspended Accountable Officers
DISPOSAL
DISPOSAL
Determination of Disposable Property
Inspection
Inspection
Inspection
Inspection
APPRAISAL
General Procedures in Appraising the Property for Disposal
General Procedures for Disposal
General Procedures for Disposal
General Procedures for Disposal
Composition of BAC on
Disposal
Composition of BAC on Disposal
MODES OF DISPOSAL
MODES OF DISPOSAL
MODES OF DISPOSAL
Relief from Accountability in case
of Loss of Government Property
Procedures and Requirements for Relief from Accountability
Procedures and Requirements for Relief from Accountability
Procedures and Requirements for Relief from Accountability
TAKE – NOTE!
THANK YOU FOR
LISTENING & GOD BLESS
YOU!!!

JUAN PAOLO S.
ARANAS
Master in Public Administration