Open channel drain (mixed with

sewage) in Sector I-9 on 17th Nov,


07
Drain pipeline opening into the open
channel
Existing STP at I-9
Existing STP (1 & 2) at I-9
STP 1,2 at I-9
New 48” sewer for STP 3 & 4
Man hole for the 48” sewage line to
STP 3 & 4
Excavation work for the new 48” sewer
for STP 3 & 4 at I-9
24” sewer line for STP 1, 2 & 3
24” sewage pipe line near STP 1 &2 at
I-9
New STP 3 & 4 at testing stage I-9. STP
1& 2 in the background
STP 3 & 4 along the open channel
drain in depression
Sign board at I-15/4
Open channel flow near STP at I-15/1
Upstream of open channel flow in I-
15/1
Down stream of open channel flow in I-
15/1
Sign board in sector I-16
Developmental works near I-16/1
Infrastructure works in I-16, looking
back towards I-15, a depression in
between
Open channel flow through I-16/1/2
Widening of open channel at the
Upstream of I-16/1